|
Resume alert |
Resumes 21 - 30 of 112 |
Bellevue, WA
... flow in yielding and efficiencies Setup and organize Docking System work order process kit Monitor material work center (MRP/ECD)planning released dates Perform daily blockers removal and extricate alternative parts for process completion Analyze ...
- 2020 Nov 05
Seattle, WA
... MRP process flow, Master Planning Schedule, and MRP Planning Parameters. Worked on Invoice verification, Posting of Invoice, Blocked Invoice and Evaluated Receipt Settlement (ERS). Data migration using tools LSMW, BDC, BAPI Worked on IDOC and ...
- 2020 Mar 30
Redmond, WA
... Anna University, Chennai, India Aug 2013 – May 2017 Bachelor’s in Mechanical Engineering GPA 7.67 Coursework: Manufacturing Technology, Process Planning and Cost Estimation, Total Quality Management SKILLS Technical: Six sigma green belt, MRP, ...
- 2020 Feb 27
Renton, WA
... Job Responsibility: Works with Operation Management team and Master Scheduling to maintain accurate MRP parameters including lead times and lot sizes and coordinates with Engineering and Change Board Rep to make the associated changes to the BOM. ...
- 2019 Nov 11
Bellevue, WA
... Upgraded Oracle Application MRP system from 11.0.3 to 11.5.10.2 in UNIX environment; Implemented Oracle Applications 11.5.10.2 in Linux; Maintained the infrastructure of SSO, web cache, CSM, Oracle Application 9iAS, Oracle 9i, 10G web portal server, ...
- 2019 Oct 21
Renton, WA, 98059
... Inventory Data Analysis – (Exception Monitoring, KPI Performance, Trend analysis, Scenario Based) Replenishment Forecasting – (MRP Forecasting, Reserve stock allocation, EOQ/EROP, PP) Materials Management Operations – (Raw material processing, SFG ...
- 2018 Nov 23
Bothell, WA
... • Managed complete MRP process from Master Production Schedule to on time product delivery. • Analyzed inventory to identify excess inventory and made recommendations for reducing excess and obsolete materials; Gathered volume estimates to trigger ...
- 2018 Sep 20
Bellevue, WA, 98008
... Performed configuration starting from baseline configuration to configuration of the material master, bill of materials, MRP. Designed specs for various functional modules to send or receive EDI/IDOCS from vendors, customers, carriers etc. (Ex: 940, ...
- 2018 Jun 11
Everett, WA
... App to achieve quarterly profit sharing and yearly goals • Manage and supervise a team of 5 to coordinate changes to ERP, MRP, and ensure on time delivery and store installation • Handle sensitive scenarios with the team to ensure a safe and happy ...
- 2018 Jan 27
Everett, WA
... Knowledge of MRP System. •Leads the analysis of engineering design, manufacturing and product support requirements and applies industry standard analysis methods and techniques to continuously improve and optimize solutions for complex engineering ...
- 2018 Jan 24