|
Resume alert |
Resumes 31 - 40 of 153 |
Qatar
... Had good training period in manufacturing and fabrication of power related equipment's such as Turbine Diaphragms, Nozzles, Shafts Checks of levelness, position, orientations, etc of diaphragms. Providing pre-dispatch inspection reports to the ...
- 2022 Sep 13
Al Dafna, Qatar
... of 1510 MW Combined Cycle Power Project, Scope of works involved erection of 4 Heat Recovery Steam Boilers 3500 MT each, associated Piping, equipment, By pass stacks 350MT each, Boiler Feed Water tanks, Gas Turbine Diffusers, Gas Turbine aux. ...
- 2022 Sep 03
Al Dafna, Qatar
... Umm Al Houl Power Plant (IWPP) – Production capacity of 2,520 MW of power and 136.5 MIGD of potable water Scope of activity – Turbine erection, testing and commissioning 2. 89 substations (400, 220, 132 & 66KV Substations) contain civil building ...
- 2022 Aug 06
Al Dafna, Qatar
... Buggy motors, Conveyor motor, Turbine (blasting) motors, Pump Motors, bridge crane motors, dust collector motors and brush machine motors. 12. Inspect regularly of the active sensors. 13. Adjust the approximate sensor and door limits. 14. Check the ...
- 2022 Jul 24
Al Dafna, Qatar
... oHandling various electrical interface for mechanical packages like Gas Turbine Generator, instrument and air compressor package, Deluge skid, Electric heaters, Electro chlorination package, Flare package etc., oProvide Inputs to other disciplines. ...
- 2022 Apr 23
Qatar
... Foundations for the LP Gas Compressor A-5052 @ TEPQ, LP Condensate pumps, A5052 P1 A/B, Two units of FGTP A-5050 & A-5051– both suitable for sweet and sour gas service located towards north of Phase I & II Turbine areas. On-line mixer N-5002 and ...
- 2022 Apr 13
Al Dafna, Qatar
... Project: 2x630 MW Godavari Gas Power Plant at Kakinada, Andhra Pradesh Position: Site Engineer Client: Spectrum Power Generation Limited Responsibilities: Execution of Bore Piling 2,500 nos and structure of Steam turbine and Electrical Annex ...
- 2022 Apr 04
Doha, Qatar
... Baker Hughes CLIENT: QAFCO – Qatar Fertilizer LOCATION: Mesaeed POSITION: EHS Specialist PROJECT: Ammonia – 6 Compressor & Turbine Major Inspection DURATION: February 2022 – Tll Date EMPLOYER: Brunel Oil & Gas CONSULTANT: Schlumberger, Well Testing ...
- 2022 Mar 19
Al Dafna, Qatar
... Al Issa/Kuljian Int’l Consulting Engineers (Riyadh, K.S.A) Site Electrical Inspector March 2005 – April 2007 Project: (4X600MW Steam Turbine Generator) Oil Fired Power Plant for Stage II Phase 2 under project of Saudi Electricity Company (SEC-WR) ...
- 2022 Mar 02
Ain Khaled, Al Rayyan Municipality, Qatar
... High Rise Building November 7, 2014 – Doha Qatar • Seminar on Overview of Essential Electrical System for Hospitals • Gas Turbine Combined Cycle Power System • Basics of LED and the Application of LED Lighting June 06, 2014 – Doha Qatar • Seminar on ...
- 2022 Feb 28