NAMALA SURENDER

Tel: +974-**-***-***

adqrr7@r.postjobfree.com

EDUCATIONAL QUALIFICATIONS:

****-****: B.Tech in CIVIL ENGINEERING, First Class with Distinction from Jawaharlal Nehru Technological University College of Engineering (JNTUCE), Hyderabad, India.

2012-2013: eMBA in Project Management

MMUP/UPDA Certification: UPDA/MMUP (Qatar) Certified Grade-A Civil Engineer

Codes, Standards & specs: Fully Familiar with BS, European/American Standards, working knowledge of Shell DEP, Specifications of ADNOC/ADCO/ADGAS/NPCC/GASCO/Qatar Petroleum/Dolphin Energy/Saudi Aramco & Qatar Construction specifications.

Training & Certifications: Valid QP-Offshore e-PTW, HUET/T-Bossiet, & Onshore PTW (RLIC-CPW), H2S-BA, Safety Induction with RasGas, QatarGas, Dolphin Energy, ADGAS, ADCO.

Date of Birth: 02-June-1970, Indian Nationality.

Driving License: Valid UAE, Qatar & Indian driving licenses.

COMPUTER SKILLS:

MS-Project/Primavera, MS Office packages & autoCAD

WORK EXPERIENCE:

Total work experience: 28 years 9 month (out of which)

Work experience in Qatar: 14 years 9 months

Work experience in UAE: 12 years 5 months

Total work experience in Oil & Gas and Process plants: Onshore/Offshore/Brownfield/Green filed-16 years

FIELDS OF EXPERTISE:

Civil/Structural/

Buildings/Infra.

Oil & Gas (Upstream & Downstream)-

20 years in EPIC major projects (Brownfield/Greenfield/Process plants)

Offshore (Oil & Gas) / Marine / Port/Infrastructure Projects:

(Das Island-UAE &

Halul Island (Qatar)

& Ras Laffan, Jebel Ali FZ Port expansion.

Oil & Gas-Onshore

(Ras Laffan-Qatar

& Bab fields, Buhasa, Jebel Dhanna, Ruwais, Taweelah-Dolphin Energy,Upgradation of Offshore supply base-Abudhabi.

Tank farms, LNG Plants, Gas Receiving Facilities, Refineries, Pipelines, manifolds, Crude Oil Import/Export facilities, Diesel Bunkering, Integrated Oily water/sludge handling system, Low Pressure Associated Gas Compressor Facilities.

Common Cooling Seawater facilities to RasGas, QatarGas, Shell GTL, Q-Power, BarzanGas

Cofferdams/Shore protection works / earthworks / reclamation works

Desalination plants, Intake pump houses, Storage Tanks, distribution networks.

Power Stations, Substations, Pumping Stations, Lifting stations, Desalination plants & up gradation of existing process plants.

Rehabilitation works for Sewage Treatment Plant.

Refurbishment works for the DLB 2000.

Upgradation of existing pumping facilities in LNG plants

Fabrication & Installation of Offshore Platforms-Jackets, Decks & LQ Modules.

AREAS OF EXPERTISE:

Construction supervision/project management in Oil & Gas, Process plants, Civil / Buildings / Infrastructures

Pre-FEED, FEED, Design & Detail Engineering, Value Engineering

Promote HSE & strive to achieve zero incidents goal. Follow up with Site QA/QC operations / Inspections

Project Planning, scheduling & Reporting. Progress validation and reporting.

Coordinate with Government / authorities & stake holders

Contract Administration and follow up with Contract engineers / Quantity surveyors

Procurement assistance

Involved in resolving the issues with Sub-Contractors / Vendors / Specialist suppliers

Rehabilitation/ up gradation works (Civil/Structural-process plants). Multi-discipline works: MEP/HVAC, Civil/Architectural/E&I/Commissioning.

Mechanical Completion, PSSR & Pre-commissioning / Commissioning /hook-up, Preparation, follow up & close out of master Punch lists/ preparation of project dossier & final handing over.

Project Management & coordination with (O & M), Control room & other stake holders including Offshore terminal operations.

Participating in HAZOP-HAZID-ENVID Reviews. Interface management, SIMOPS & Shut-down Operations. Pre & Post Shutdown SIMOPS

EMPLOYMENT HISTORY:

Period

Employer

Department

Designation

Service span

Dec 2020-till date

Qatar Project Management

Doha-Qatar

Project Management & Construction management

(Civil/Infrastructure/

Oil & Gas).

Senior Infrastructure Engineer (Energy & Utilities)

Currently working

August 2015-Nov 2020

Qatar Design Consortium-Doha, Qatar

(Design & Build, Construction Supervision Consultancy)

Project Management Consultancy

(Civil/Infrastructure/

Oil & Gas)

Resident Engineer

(5 years 4 months out of which 2 years in Process plant

June 2007-May 2015

Qatar Petroleum:

-Onshore

-Offshore

Engineering Major Capital Projects

Offshore Engineering

Construction Supervisor

(Civil/Structural/Infrastructure)

8 years

(3 years-Onshore &

4 years-Offshore).

June 2001-May 2007

Pan Emirates Engineering Ltd-Abu Dhbai

(PMC services to Oil & Gas / Petrochemical sectors)

Engineering:

(Seconded to ADGAS / Dolphin Energy/NPCC/ILF Consulting/ADCO/Essnad)

Civil Engineer

6 years

(Oil & Gas-Onshore & Offshore)

April 1999-May 2001:

STEEL FAB-Al Quoz, Dubai

Technical

Civil Engineer

2 years 1 month

March 1995-March 1999

Contech Engineering Ltd-Jebel Ali-UAE

Engineering Projects:

(Seconded to DBB for 1yr)

Site Engineer

4 years

June 1993-Feb 1995

S. Prabhakar Construction Company-India

Civil/Infrastructures

Site Engineer

1 year 9 months

Job responsibilities/Principal accountabilities:

Stationed @ QP-Offshore facilities (HALUL ISLAND) for the execution of QP-Offshore Engineering Oil & Gas (Brownfield/Greenfield) and infrastructure projects.

Worked as a project team member for the execution of QP-Onshore Engineering projects @ Ras Laffan for the Common cooling Seawater facilities providing seawater to RasGas LNG2, QatarGasLNG1, Shell GTL, Barzan Gas, W4/LNG1, Q-Power &Independent Power Plant (IPP3).

Worked as Client’s representative (Qatar Petroleum/Dolphin Energy Ltd / ADGAS / ADCO / NPCC / Ashghal) for 16 years in the execution of the Oil & Gas projects including brown field/green field projects.

Assist the EPIC Contractors in obtaining QP Offshore e-PTW& QP/RLIC e-CPW and oversee if the Contractors are complying the PTW procedures. Review on Contractor’s technical packages for the PTW/e-CPW requirements, coordinate with all the relevant authorities for obtaining PTW/e-CPW and coordinate with concurring parties for endorsements on the PTW’s /e-CPW’s & SIMOPS (TOTAL / OXY / QP-HALUL) for an efficient PTW working procedures/execution of projects.

Besides monitoring the day to day Construction Supervision, working in line with the plant shut down schedules, with the valid PTWs and play a key role for the project interface environment in facilitating sound and efficient communication to resolve interface issues with many concurring parties/stake holders/end-users/asset holders like TOTAL / OXY / Halul Terminal Operations, Production stations, Sub-sea cable project team, RasGas LNG2, QatarGasLNG1, Shell GTL, Barzan Gas, Oryx GTL, W4 LNG1, Laffan refinery, Dolphin Energy, Q-Power and Independent Power Plant (IPP3) etc.

Review, approve& Implement JSA/JHA/risk assessments/COSHH requirements are met as per the HSE policies effectively at site without affecting the progress & quality of the job.

Demonstrate and promote the QP projects core values of Safety, Quality, integrity and lead by example.

Support Project Management Team (PMT) in leading project Hook-up & Brown Field Construction execution activities, by providing guidance to the team, ensuring timely and effective directions are followed in all aspects of planning and executing the workload.

Lead the team to ensure the safety, administrative and operational aspects of Hook-up & Brown Field Construction are monitored, and the performance targets are being met.

Ensures overall compliance with Hook-up & Brown Field Construction Execution Plans, specifications, and procedures by promoting effective communication and team working together with best practice sharing to improve operational efficiencies.

Lead key interfaces with continuous and regular communication with all stakeholders including but not limited to Operations, PMT and EPC Contractor.

Lead the contractor performance through leadership and coaching to ensure teams understand the work processes, implementation, and performance monitoring, resulting in the timely mobilisation of quality resources and effectiveness of site personnel.

Contributes to project workshops related to Execution such as, Constructability, Complexity, Interfaces, FRA’s, HAZID, HAZOP, Lessons Learned (LL), etc., ensuring timely resolution to problems and challenges through best practices, industry standards and knowledge gained from personal experience.

Implement effective interaction with Project Team, QP departments and contractors to resolve issues and ensure execution is aligned with best practices in shutdown planning, preparation and reliability in line with approved schedule and costs.

Highlight to Management attention, any signs of poor CONTRACTOR performance and take the lead for providing immediate corrective actions proposals. Ensure unsafe activities are challenged and reporting of poor and good safety behavior is undertaken by CONTRACTOR team members.

Lead daily shutdown progress meetings on behalf of the Company

Attend the tool box talk/meetings daily, site safety walkthroughs periodically & participate in safety awareness programs, conduct safety audits randomly on the Contractors HSE performance at site in order to promote/adopt/enhance the safety culture.

Coordinate with HSE team for the execution of EPIC Contractor’s scope of works & strive to implement Company’s safety standards in order to accomplish zero incidents policy. Participate in the incident / accident investigation team.

Review, Comment & Implement Job Safety/Hazardous Analysis requirements effectively at site without affecting the progress & quality of the job as per the Company’s HSE policies.

Review, comment & implement the Project Execution Plans (PEP), Project Quality Plans (PQP), Methods Statements, Constructability Techniques, feasibility studies, Rigging studies, critical lifts, Technical Queries, Field/Design Change Notes (FCN/DCN), CDR’s, Inspection Test Plans (ITP), Corrective Action Reports for the NCRs, Material Approval Requests (MAR’s), Technical Data Sheets, vendor documents, third party documents & Material Safety Data Sheets (MSDS).

Inspect/monitor/review/witness/approve & execute on-going site activities through RFI’s and ensure that the construction works are executed per the approved PQP, IFC documents, IFC drawings, ITPs, method statements, in accordance with company’s QA/QC policies.

Review EPIC Contractor’s work schedules / baseline program / Work Breakdown Structures / dash board programs/monthly to ensure that, the construction activities including procurement and other engineering deliverables are effectively organized in order to meet the Projects’ completion dates with due consideration on achieving the KPI’s / milestones of the Project and report the KPIs to the line manager.

Attending weekly/monthly Construction Progress, QA/QC & Safety review meetings, anticipate in advance and report the short falls to the Lead construction Supervisor/Head of construction.

Working as a team member in the Construction of Civil/Structural works associated with the project’s scope of work including ESW packages/mobilization and in coordination with Mechanical/piping, HVAC/Building services, Electrical/ Instrumentation & HSE, including mechanical completion, hook-up, PSSR/ pre-commissioning/commissioning, final handover of the project dossier along with punch lists close out records, red line mark-ups and raising the documents to the as-built status of the project.

Coordinate with Offshore terminal engineering departments/Offshore Terminal Control Room, Terminal Operations Engineering & maintenance, Terminal facility management Department, Marine Dept, NSS (National Security Shield) and Fire/Safety departments.

Coordinate with QP-Offshore Sub-Sea cable project team for the Sub-Sea cable project from Ras Laffan to Halul Island.

Coordinate with fabrication yard for the material/fabrication/hot works/blasting & painting for the steel structures. Review on welding procedures & third-party certifications.

Assist the Senior Project Engineer for the preparation of engineering deliverables including pre-FEED, FEED, attending HAZOP/HAZID/ENVID review meetings, providing assistance for Engineering input & mid tender site visits by the Project Management / Contractors for the ongoing / upcoming projects.

Administer contractor’s works and submissions, evaluate quality of materials and workmanship, outline contract change orders. Quantify the completed tasks & certify the quantities for Contractor’s progress and the interim / final invoices.

Participate in the internal/external audits of the QA/QC & HSE records.

Play a key role in coordinating the project’s scope of works for MCC, hook-up, pre-commissioning, commissioning & final handover of the project including handing over of the final dossier along with the snagging/de-snagging/punch lists close out, red line mark-ups and as-built status of the project.

Contribute to the development of Qatari employees.

Dec 2020-Till date: Qatar Project Management (QPM), Doha-Qatar

QPM is an ISO 9001 Company providing Engineering Consultancy Services to the Civil, buildings & Infrastructure sectors including Oil & Gas (onshore & offshore), Petrochemical & power sectors.

Position : Senior Infrastructure Engineer (Project Management)

Currently working on Infrastructure/accommodation project, Qatar

Design & Build Contract for the construction of Infrastructure and housing project for a population of 67432 catering to the impending FIFA 2022.

Project Value: QAR 1.932 billion

The project includes the Design & Engineering, procurement, construct & commission the following:

Accommodation units (177 buildings) for a population of 67432 for conducive living.

17 Nos. of substation buildings and primary substation

Operations & Maintenance building, Ministry of Interior buildings, Clinic, Friday Mosque & daily mosques, Hypermarket, local & central retail, Mess Hall & laundry facilities.

Foul water network systems with Sewage Treatment plant & TSE produced will be utilized for irrigation networks and the excess TSE connected to deep well injections.

Storm water network systems with holding tank/filtration systems and finally connected to deep well injections.

Aug 2015-Nov 2020: Qatar Design Consortium-Qatar

QDC is an ISO 9001 Company providing Engineering Consultancy Services to the Civil, buildings & Infrastructure sectors including Oil & Gas (onshore & offshore), Petrochemical & power sectors.

Position : Resident Engineer (Project Management)

Completed Infrastructure/process unit project, Qatar.

Design & Build Contract for Rehabilitation of Doha South Sewage Treatment plant project for Ashghal / PWA-Doha:

Rehabilitation works for the whole plant which include:

Refurbishment of Inlet reception/grit chambers, upgradation of old valves at storm water tanks, ASP plant & FST, SAS wasting capacity, secondary clarifiers with bottom scrappers, TTP, Ultra Filtration (UF) balancing tank, liquor pumping stations, TSE/VFD, MOV valves for isolation of lagoons, aerobic digesters, gravity filters, anoxic tanks, thickening building, pumping stations & common conveyor structure for dewatering centrifuge system.

Repair/Refurbishment or replacement of Civil/Structural works for 35 nos. of buildings.

Construction of Odor Control Units, new/additional aerobic digesters, Side Stream Filtration, bulk chemical storage & substation buildings.

Construction of logistics hub at Bu Sulba for Gulf Warehousing Co-Al Wukair-Qatar, including 19 Nos. of warehouses (A/C & Non-A/C), 6 Nos. of Substations, cold storage warehouses, 2 Nos. of sewage treatment plants, roads, drainages, fire water networks including tanks, potable water networks, CCTV and Accommodation blocks for the workers/ staff all other related infrastructure works.

Mannai Head quarters, Auto showroom (Cadillac & GMC) and warehouses @ Doha Industrial area.

June 2007-May 2015: Qatar Petroleum (Major capital projects-onshore-Ras Laffan & Offshore Engineering Department).

Qatar Petroleum-Offshore Projects:

EPIC of Integrated Oily water/sludge handling system:

Construction of fire protection system/modification for Crude Oil Manifold system, surge tank area & produced water system. Operating, Control & safeguarding philosophy of drain system, produced/formation water system and sludge mitigation & handling system and etc.

EPIC of Low Pressure Associated Gas Compressor Facilities:

Design philosophy of the project: To achieve zero flaring of the low pressure TOTAL gas. To reduce the current environmental pollution due to the burning of the sour fuel gas coming from PS-2 Platform. Blending sweet TEPQ (Total Exploration and Production Qatar) wet gas and sour PS-2 dry gas in order to improve the gas turbines life-span. All available sweet gas will be used for blending which shall be supplemented by drawing sour gas from PS2.

Foundations for the LP Gas Compressor A-5052 @ TEPQ, LP Condensate pumps, A5052 P1 A/B, Two units of FGTP A-5050 & A-5051– both suitable for sweet and sour gas service located towards north of Phase I & II Turbine areas. On-line mixer N-5002 and Buffer vessel V-5096 for blending the treated sweet and sour gas.

EPIC of Crude Oil Import/Export upgrade facilities and beach landing facilities:

Operating and control philosophy: The crude oil system comprises of pig receivers for the sub-sea pipelines from Off-shore fields (Namely PS-1, PS-2, PS-3 and Al-Khalij) and Single Buoy Moorings (SBM-1 and SBM-2) for routing the crude oil received to wet crude oil storage tanks T5001 to T5005 in the South Tank farm. Following dehydration, the crude oil is then pumped (transferred) to six dehydrated crude oil storage export tanks T5006 to 5009 and T5050/5051 in the North Tank farm.

The crude Oil in the export tanks is pumped to two SBMs using the existing EVSD pumps and four new EVSD pumps.

EPIC of Desalination Plant & Potable water storage tanks at Halul Island:

Design philosophy of the project: The new desalination plant is designed to produce 2,400 m3/d of potable water from seawater by using reverse osmosis technology. The RO (Reverse Osmosis) process comprises of construction of the following elements.

Sea water intake and brine outfall, Intake pumping stations feeding the new desalination plant, New desalination plant (including pre-treatment and RO units), Tanks and associated pumping stations within the new desalination plant (pumping stations to and from existing potable storage tanks and pumping station to supply Total Exploration Qatar-TEPQ), Chemical dosing facilities associated to the intake, pre-treatment and potabilization of RO permeate produced, New potable water storage tanks (2500 Cum/each), associated pumping stations and piping network, Wastewater and sludge treatment facilities.

EPIC of 33/11 kv Power Distribution Substation:

Construction of 33/11 kv PDS building with all associated cable trenches, cable cellars, Transformer foundations, HV/LV equipment foundations, road crossings and other associated finishing works. Interface coordination with the construction team of sub-sea power cable project (Ras-Laffan to Halul)/132 kv substation building at Halul

EPIC of CCTV/PAGA and Access Control Systems:

The project involves the installation of a fully functional state of the art closed circuit television (CCTV) system, public address/general alarm (PA/GA), access control system (ACS) and intrusion detection system (IDS) together with integration of the new systems to form one electronic security system (ESS) which will be interfaced with the existing QPinformation technology server for communication to QP’s Doha central security center.

EPIC of Diesel dispensing /bunkering and associated facilities at Halul Island:

Construction of diesel dispensing/bunkering facilities, including construction of new diesel storage tank with automation stock control methodology. Optimization of associated facilities such as fire protection and other safety system in particular for the diesel storage tanks & ancillaries.

Infrastructure Project: Construction of Integrated Chiller, Freezer, Laundry, Dining& Accommodation facilities for 600 bed accommodation complex (Halul Island):

The 600 bed accommodation complex project on the Halul Island involves the construction of 4 accommodation blocks, chiller, freezer, dining/mess/multipurpose hall facilities, administration block, laundry block, supermarket, HV/LV substations/transformer units, pump house/water tank, septic tank and sports facilities etc.,

Infrastructure Project : Construction of Centralized Industrial Area (Halul Island):

The infrastructure project on the Halul Island involves the construction of Office block, marine stores, workshops/warehouses, compressor/gas cylinder storage facilities, blasting and painting booth, shoreline protection works and etc. that could cater additional Offshore Industrial facilities.

Infrastructure Project : Construction of New Security Building/Telecom building complex including the North Ring Road of Halul Island:

New security building complex is a G+3 storied building with many facilities like sub-station building and an armory building, external service yard building and the connecting Heliport, access/internal roads, land scarping, fencing and other external works.

New Telecom Building with the following support facilities: This is a G+2 storeyed building with car parking and external pump room and diesel generator set.

Qatar Petroleum-Onshore projects at Ras Laffan-Qatar

Common Cooling Sea Water Project (CCWP, Ph-2, Category 1 & 2)-Project value USD 1.30 Billion

The Overview of the project: The $ 955 million CCWP / PH-2 Category-1, (EPIC) project is based on a combination of “Once through” and “Recirculation system” providing cooling water to the various consumers including Qatar Gas-LNG 1, Ras Gas-LNG 2&Q-Power.

Working as a team member for the overall Construction supervision of all the on-going site activities of nearly 590,000 Cum of RCC works, 40,000 MT of Rebar, 15000 MT of structural steel in various areas including Piling works (1258 piles), Construction of Intake areas, Cofferdams, Intake Pump Houses (2 pump houses with 18 pumps), Manifolds, Distribution & Collection of Piping System (78 km GRE pipeline with an average of 3000 mm dia.) and Related Auxiliary, ancillary facilities/Buildings as follows.

Electro-chlorination building, Control building, VSDS buildings (2 nos.), Operations Building, LLCC buildings (5 nos.), Substations/220 kv building, 33 kv building, 33 kv electrical Switchgear building, workshop & Warehouse structures (2 nos.), Gate houses and etc.

Roads & Pavings, Road Crossings, Utility Crossings like Product Corridors, Power Corridors, WET utility Corridors, HP Gas Corridors, Pipe Bridges, platforms/crossovers, valve chambers, Pipe sleepers, anchor blocks, piling works, Receiving Basin, Discharge Channel, Stoplog Gates, Transition channel, Diversion channel, Outfall Structure, Site grading/earthworks, Fencing the facilities within the RLI C.

CCWP / PH-2 Category-2, is an EPIC project ($ 575 million) includes the construction of supplying cooling water to the end users like IPP3, Shell GTL, Barzan Gas &Laffan Refinery.

Category-2 Consists of 52 km length of pipelines including U/G and A/G, GRE/GRP (Dia. varies from 600 ID to 3200 ID), 60,000.00 Cum of RCC works for the sleepers, anchors, manifolds, pipe bridges, valve pits/chambers, LLCC buildings (3 nos.), MOV building etc and earthworks of 300,000 cum.

June 2001-May 2007: PAN EMIRATES ENGINEERING (PEL) LTD-ABU DHABI

PEL is an ISO 9001 Company providing Engineering Consultancy & manpower recruitment Services to the Oil & Gas (onshore & offshore), Petrochemical, power & Infrastructure sectors.

Position : Civil Engineer

PMC/Construction Supervision services for Dolphin Energy Ltd. Abu dhabi (Year 2004-2007).

The Overview of the project: Gas Receiving Facilities-Taweelah, is a $ 100 million EPIC project including the Construction of Receiving Facilities, a 10 km 48” on-shore Gas pipeline, Hot-tap tie-ins with existing Gasco pipelines &tie-in with the 48” Export Gas pipeline (Midstream P/L) which in turn connected to the subsea pipeline of 366 km, from Ras Laffan, Qatar.

Job responsibilities:

Responsible for the overall Construction Supervision of all the on-going site activities in various areas as listed below:-

Construction and coordination for the foundations of 48” & 36” Hot-tap tie-ins with the existing Gasco Facilities. Construction of 48" Pipeline (subkha areas, non-subkha areas &high water table areas) and the relevant berm construction up to the tie-in point with the existing Pipeline.

Construction of Anchor Blocks, Valve Pits, LLCC building, Operations Building, Administration Building, Warehouses and Gate houses.

Construction of foundations (pre-cast & in-situ) for Gas Heaters, Instrument air, Metering Skid, Emergency generator, Pressure Reduction Skid, Inlet Filters, Cold Vent stack, HIPPS valves, Access Platform, crossovers, sleepers, pre-cast wall panels and many other miscellaneous pipe supports.

Construction of piles/stone columns (1025 nos.) below the major foundations.

Construction of Roads, drainages, water supply lines, Culverts & fencing.

Site grading and the related earthworks (approx. 245,000 Cum) filling/cutting.

PMC services to ILF consulting Engineers for Dolphin Energy Ltd.

Worked for ILF Consulting Engineers as a Civil Engineer for the Eastern Gas Distribution System (EGDS) upgrade works project, for M/s Dolphin Energy Ltd as per the GASCO specifications and standard drawings.

Involved in the preparation of FEED (Front End Engineering Design) package, Coordination with all other disciplines & with the Client (Dolphin Energy Ltd) for the EGDS (Eastern Gas Distribution System) upgrade works, for the following pipeline projects.

Al Maqta-Jebel Ali 48” pipeline (Taweelah to Tie-in point and hot tapping of the same to Maqta-Jebel Ali)

Al Maqta-Taweelah 24” pipeline, Al Maqta-Taweelah 36” pipeline, Al Maqta-Al Ain 30” pipeline, Al Ain Cement Factory 12” pipeline.

Working as a team member for site visits, site measurements and coordinating with the survey sub-Contractors (Topographical & Geotechnical) for the EGDS project.

Involved in the preparation and checking of Pipeline Alignment sheets, pipeline corridors, Civil/structural detail drawings including, pipe supports, tie-in concrete pits, access platforms, crossovers, block valve stations, Control Room/ Operations Building, Administration Building & Workshop/Warehouse building etc.

Jebel Dhanna Tank Farm upgradation, ADCO-Abudhabi(Year 2003- 2004)

Preparation of FEED package for the additional tank farm at Jebel dhanna.

Preparation of Project Scope, Site survey/measurements in coordination with the survey/sub-Contractors.

Checking of project/master drawings, MTO’s and also involved in the preparation of Engineering Dossier for the construction package and also coordinating with inter disciplines, ADCO & sub-contractors. Site survey in coordination with survey contractors includes, carrying out various tests on the existing concrete structures (Concrete strength, chlorination test, cement content test and degree of corrosion to the existing rebar in the RC structures etc.) for the assessment of the integrity of the structure, and accordingly advise ADCO with the remedial actions to be carried out for the existing structures.

All the works have been carried out in accordance with company’s QA/QC & HSE policies.

June 2001-November 2003:

Off-shore Projects:

Supporting the lead Civil Engineer for Engineering, Procurement assistance, coordination with Fabrication yard, load out/Transportation & installation of the Off-shore Jackets (15 Nos.), Decks (7 Nos.) & LQ modules (2 nos.) for M/s NPCC, for Saudi Aramco project.

Coordinated for Engineering, Procurement assistance, Fabrication & installation/modification requirements for the Derric Lay Barge for Valentine Maritime Gulf Ltd, Abudhabi for the (Off-shore) subsea pipeline construction of Adani port Project.

Coordinated for the modifications of the Off-shore supply base facilities for ADNOC, Abudhabi, including the preparation of shop drawings, procurement assistance & construction supervision.

ADCO projects:

Involved in the detail engineering & construction supervision of modifications at ASAB Petrol Station.

Coordinated for detail engineering services and construction supervision of foundation for compressor & cooler for vapor recovery project for M/s Worley. Involved in the Terms Of Reference (TOR) dossier preparation for Bab field master drawings updation project.

ADGAS Projects:

Coordinated for detailed Engineering, procurement assistance and Construction supervision (EPCM) for addition of 3rd MECO PUMP at Das Island including detailed survey, as-builting and retrofit involving all disciplines, Civil / structural/ Rotating Equipment / Instruments and Controls / Electrical, QA/QC etc. The pump has a capacity of 60 Cum/hr at discharge pressure of 72 barg and installed with stainless steel piping system.

Involved in the modification of LNG plant Access platforms, including site measurements, preparation & checking of shop drawings, MTOs and coordination with the Client at Das Island. Underwent for safety training at ADGAS, Das Island.

All the works have been carried out in accordance with company’s QA/QC & HSE policies.

Takreer/ABB Project: Ruwais Refinery Expansion Project (General Utilities Plant)-Ruwais

Worked as Field/Engineering Coordinator for General utilities Plant (Ruwais Refinery expansion project) coordinating with the Vendors, Main/sub-Contractors & with the Client for the preparation of redline mark-ups & as-built drawings, handing-over of final dossier & close-out of the