Post Job Free

Resume

Sign in

Site Engineer Construction Manager

Location:
Al Dafna, Qatar
Salary:
15000 Qar/ Month
Posted:
April 04, 2022

Contact this candidate

Resume:

NIKHIL KUMAR BHATTACHARYA

Senior Construction Manager (Civil)

Contact No: +974-******** / +91-998*******

Email: adqohu@r.postjobfree.com

LinkedIn:

https://www.linkedin.com/in/nkb1963/

Date of Birth: 03/09/1963

Passport No: L5958357

QID: 263********

Total work Experience: 35 Years (1988 to 2022)

PROFESSIONAL QUALIFICATIONS

Diploma in Civil Engineering - West Bengal State Council of Technical Education (1987) Bachelor of Science - Calcutta University (1988)

Diploma in Railway Transport and Management - Institute of Railway Transport (1994) CURRENT EMPLOYER

Larsen & Toubro

Limited

Address: Sheikh Thamour Building, Building No - 209, Area No: 42, Street No: 230, Opp: Gulf / Doha Cinema, Next to Qatar Islamic Insurance, C Ring Road, P.O. Box No. 24399, Doha, Qatar

Tel: +974-******** /+974- 44321784 Fax: +974-******** Contact Person: Mr. Jothi Basu Subbaiah (Project

Manager) Mob:+974-********

Years with current Employer: 24 Years (1999 to 2022) PROFESSIONAL EXPERIENCES

FROM

TO

COMPANY / PROJECT / POSITION / RELEVANT TECHNICAL & MANAGEMENT EXPERIENCE

Oct 2021 March 2022

Company: Larsen & Toubro PT&D, Qatar

Project: Ras Abu Abud Super Sub Station

Position: Sr. Construction Manager

Client: Kahramaa Corporation, Qatar

Consultant: WSP International, Qatar

Responsibilities: Execution of entire structures and finishes for OCT, CT, Reactors, and different Structures of Electrical Services. Milestone achieved by close monitoring of day-to-day activities and coordination with Inter-team i.e., Design, Safety, Quality, M&E also specialized vendors with maintaining High Standards of Safety & Quality along with proper dealings with client & Consultant. Apr 2017 Sep 2021

Company: Larsen & Toubro Qatar LLC

Project: Ahmed Bin Ali Stadium & Precinct at Al- Rayyan, Doha, Qatar Position: Sr. Construction Manager

Client: Supreme Committee for Delivery &

Legacy (SC) Consultant: AECOM (PM) &

WSP(CSC)

Responsibilities: Execution of entire structures for all levels @ Zones (Z5- Z7) including High Standard Finishes @ Level -2 (All zones) VVIP areas & @ Level-3 (All zones) VIP Areas; in addition to extra responsibilities for execution of finishes up to handed over of Upper 02 Levels / All Zones and All Internal & External Stairs (30 no’s) in our FIFA world Cup Stadium Project. Entire executed area consists of different types of high-level finishes. This prestigious project was handed over with utmost pleasure timely on 15 Dec’ 20 to Client Supreme Committee (SC), along with approval of QCD, delivering with all needs & satisfaction of Client. This achievement gained by close monitoring of day-to-day activities with maintaining Highest Standards of Safety & Quality and coordination with Inter-team Design, Safety, Quality, MEP, T&C and specialized vendors along with proper dealings with client & consultant. Nov 2011

Mar 2017

Company: Larsen & Toubro Oman LLC

Project: MC-5 Salalah Airport, Salalah,

Sultanate of Oman Position: Construction

Manager

Client: Public Authority for Civil Aviation,

Oman (PACA) Consultant: HILL International

(PM)

Responsibilities: Execution of entire structures & finishes up to handed over for 05 no’s Utility Buildings consisting of Chiller plant, Generator Plant, Pump House, Primary Substation & Deportee Departure Facility; Furthermore extra responsibilities for execution of finishes up to Handed over of 12 no’s Sub- Stations, 2,500 no’s different types of Service Manholes & Installation of 75 no’s

(Big & Small) Road Signage in our honored Airport Project. Entire executed area Consist of different types of high-level finishes. This glamorous project Successfully handed over to client PACA - Oman timely on 19 Jun 2015, along with approval of ROP, delivering with all desires & satisfaction of client. This success is achieved by close monitoring of day to day activities with maintaining Highest standard of safety and quality and coordination with internal design, quality, MEP, T&C and specialized vendors along with proper dealings with client & consultant.

Feb 2010 Oct 2011

Company: Larsen & Toubro Oman LLC

Project: Mixed use Development at Al Khuwair, Sultanate of Oman Position: Construction Manager

Client: STS Group -

Macki Group

Consultant: Quad

Design (PM)

ReReponsibilities: Execution of entire structures & finishes up to handed over for 03 Buildings with 04 Storied (01 no Commercial + 2 no’s Residential) with total area around 30,000 Sq. mtr including Service Substation, Guard House, Compound wall, Service Road along with inside Soft & Hard Landscaping. Entire executed area consists of different types of top-level finishes. This esteemed Project handed over to client STS timely, along with approval of ROP, delivering with all requirements & satisfaction of client. This achievement is made by close monitoring of day-to-day activities with maintaining High standard of safety and quality and coordination with Internal Design, Quality, MEP, T&C and specialized vendors along with Proper dealings with client & consultant. Aug 2007 Jan 2010

Company: Larsen & Toubro Oman

LLC Project: Barr Al Jissah

Residences Phase - 11 Position:

Asst Construction Manager

Client: Zubair Corporation LLC

Consultant: Turner International (PM) & Atkins International

(CSC)

Responsibilities: Execution of entire structures & finishes up to handed over for Commercial Souk Shopping Complex & 2 Storied Residential Development A (Up & Down) consisting of 27 Villas including External Pump Room, Substation, Compound wall, Service Road along with inside Soft & Hard Landscaping. Entire executed area consists of different types of excellent finishes. This renowned project was handed over to client Zubair Corporation, timely, along with approval of ROP, delivering with all necessity & satisfaction of client. This success was achieved by close monitoring of day-to-day activities with maintaining High standard of safety and quality and coordination with Internal Design, Quality, MEP, T&C and specialized vendors along with Proper dealings with client & consultant.

Jan 2005 Jul 2007

Company: Larsen & Toubro Oman LLC

Project: Construction of Villa No.1 for His Majesty Sultan Qaboos (Sultanate of Oman)

Position: Asst Construction Manager

Client: Royal Court Affairs (RCA)

Responsibilities: Execution of entire structures & finishes up to handed over for Villas Zone 3 & 4 including external Gazebos, Substation, Water Tank, Compound wall, Service Road and inside Soft & Hard Landscaping. Entire executed area consists of very high-level finishes. This honored project handed over to client RCA timely, along with approval of ROP, delivering with all requisite & satisfaction of client. This success is achieved by close monitoring of day-to-day activities with maintaining Highest standard of safety and quality and coordination with Internal Design, Quality, MEP, T&C and specialized vendors along with proper dealings with client & consultant. Aug 2004 Dec 2004

Company: Larsen & Toubro ECC

Division, India Project: Oberoi Mall at

Goregaon, Mumbai Position: Sr.

Engineer / Site Section I/C

Client: Oberoi Group

Consultant: M/S Bentel & Associates (PM)

Responsibilities: Execution of entire structures & finishes up to handed over for 51,250 Sq mtr shopping mall-cum Commercial Complex with 2 tier Basement + Ground + 3 Floors. I took care of the execution of Basement Levels. During construction, maintained a high rate of progress using Doka table formworks. Site execution was monitored by day-to-day activities through sequence planning along with maintaining High Standard of safety and quality with coordination of Design, MEP and proper dealings with client & consultant. Aug 2003

Jul 2004

Company: Larsen & Toubro ECC

Division, India Project: Kandivali

Twin Tower, Mumbai Position: Sr.

Engineer / Site Section I/C

Client: Oberoi Group

Responsibilities: Execution of entire structures & finishes unto handed over for 22 Storied Tower with Car parking podiums with area of 1,750 sqm up to first floor using Doka formworks and remaining floors completed using Mivan formworks. I took care of the execution of one Tower & additional responsibility of reinforcement work for both the towers. It was a fast-track project to ultimate uses of Mivan Formworks. Site execution was monitored by day-to-day activities through sequence planning along with maintaining High Standard of safety and quality with coordination of Design, MEP and proper dealings with client & consultant.

Mar 1999 Jul 2003

Company: Larsen & Toubro ECC

Division, India Project: Bharat Hotels

Ltd at Andheri, Mumbai Position: Sr.

Engineer

Client: Lalit Suri Hospitality Group

Consultant: Gherzi Consulting Engineers Pvt Ltd (PM) Responsibilities: Execution of entire structures & finishes up to handed over for 420 Guest rooms 5-Star Hotel, 02 Basement + 9 floors along with one 3 storied Commercial Building, Compound wall, Service Road and inside soft & hard landscaping. I took care of the execution from the 6th floor to roof level. Entire executed area consists of different types of high-level finishes. This eminent Project Handed over to client Lalit Suri Hospitality Group timely, along with approval of Maharashtra Civil Defense with all needs & satisfaction to the client. This Success was achieved by close monitoring of day-to-day activities with maintaining High standard of safety and quality and coordination with Internal Design, Quality, MEP, T&C and specialized vendors along with proper dealings with client & consultant.

Aug 1997

Feb 1999

Company: Simplex Concrete Piles India Ltd.

Project: Haldia Petrochemical Ltd, Haldia, West

Bengal Position: Sr. Engineer

Client: Haldia Petrochemicals Ltd (HPCL)

Responsibilities: Execution of Precast Piling 1750 nos and Structures for Boiler and Auxiliary Building with masonry and rendering finishes. I took care of the execution of 02 Zones. During construction accelerated progress was maintained with monitoring of day-to-day activities through sequence planning along with maintaining High Standard of safety and quality with coordination of Design, MEP and proper dealings with client & consultant. Jan 1996 Jul 1997

Company: Simplex Concrete Piles India Ltd.

Project: 2x630 MW Godavari Gas Power Plant at Kakinada, Andhra Pradesh Position: Site Engineer

Client: Spectrum Power Generation Limited

Responsibilities: Execution of Bore Piling 2,500 nos and structure of Steam turbine and Electrical Annex Building with masonry and rendering finishes. I took care of the execution of Steam Turbine & Electrical Annexure Buildings. During construction accelerated progress was maintained with monitoring of day-to-day activities through sequence planning along with maintaining High Standard of safety and quality with coordination of Design, MEP, and proper dealings with client & consultant.

Jan 1995

Dec 1995

Company: Simplex Concrete Piles India

Ltd. Project: Pacific Cotspin LTD, Falta,

West Bengal Position: Site Engineer

Client: Mehra Group of Industries

Responsibilities: Execution of Driven Piling 550 no’s, Along with Pile Caps, Stub Columns & Plinth Beams Structures up to Ground Level. I took care of the execution of 02 Zones. During construction, maintained swift progress with monitoring of day-to-day activities through sequence planning along with maintaining High Standard of safety and quality with coordination of Design, MEP and proper dealings with client & consultant.

Jan 1994

Dec 1994

Company: Simplex Concrete Piles India Ltd.

Project: Apollo Hospital Building, Salt Lake,

West Bengal Position: Site Engineer

Client: Apollo Hospitality Group

Responsibilities: Execution of Driven Piling 750 no’s, Along with Pile Caps, Stub Columns & Plinth Beams Structures up to Ground level. I took care of the execution of 02 Zones. During construction, maintained speedy progress with monitoring of day-to-day activities through sequence planning along with maintaining High Standard of safety and quality with coordination of Design, MEP and proper dealings with client & consultant.

Sep 1992

Dec 1993

Company: Simplex Concrete Piles India Ltd.

Project: Vesuvius Refractories India Ltd, Taratala, West Bengal, Position: Site Engineer

Client: Vesuvius (I) Ltd

Responsibilities: Execution of entire structures & finishes up to Handed over for Total Factory Building along with 950 no’s Bore Piling, External Guard House, Compound Wall, Service Roads and inside Soft & Hard Landscaping. I took care of the execution of 02 Zones. Entire executed area consists of different types of High Standard Architectural & industrial finishes. This leading project was handed over to client Vesuvius (I) Ltd timely, along with approval of West Bengal Civil Defence and with all requirements & satisfaction to client. This Success was achieved by close monitoring of day-to-day activities with maintaining High Standard of safety and quality along with coordination of Design, MEP and proper dealings with client & consultant. Jan 1991

Aug 1992

Company: Simplex Concrete Piles India Ltd.

Project: 3x610 MW Bakreswar Thermal Power Plant,

West Bengal Position: Site Engineer

Client: West Bengal Power Development Corporation Ltd

(WBPDCL) Consultant: Development Consultants Pvt Ltd (DCPL) Responsibilities: Execution of Structures for Boiler and ESP Foundations for units including grounding mat & Backfilling works unto Ground level. I took care of the execution of 02 Zones. During construction, maintained fast progress with monitoring of day-to-day activities through sequence planning along with maintaining High Standard safety and quality with coordination of Design, MEP and proper dealings with client & consultant. Jul

1989

Dec

1990

Company: Civcon Construction Pvt. Ltd.

Project: JP Chemical Factory at Aurangabad,

Maharashtra Position: Site Engineer

Client: JP Group of Industries

Responsibilities: Execution of Structure of Zone -1 with masonry and rendering finishes. During construction, maintained quick progress with monitoring of day-to-day activities through sequence planning along with maintaining High Standard safety and quality with coordination of Design, MEP, and proper dealings with client & consultant.

Jan

1988

Jun

1989

Company: Civcon Construction Pvt. Ltd.

Project: Ship Building Berth & AEW Block Extension at Garden Reach, West Bengal

Position: Site Engineer

Client: Garden Reach Shipbuilders & Engineers Ltd (GRSE) Responsibilities: Execution of Bore Piling 550 no's and Marine Structure of Ship Building Berth & AEW Block Extension works. I took care of the execution of 01 Zone. During construction, maintained High Speed Progress with monitoring of day-to-day activities through sequence planning along with maintaining High Standard safety and quality with coordination of Design, MEP and proper dealings with client & consultant.

DECLARATION

I hereby declare that the details and information given above are complete and true to the best of my knowledge.

NIKHIL KUMAR BHATTACHARYA

Place: Doha



Contact this candidate