Post Job Free

Resume

Sign in

Electrical Engineer

Location:
Ain Khaled, Al Rayyan Municipality, Qatar
Posted:
February 28, 2022

Contact this candidate

Resume:

* ** * ***** * Padua-cv

Ronie Elacion Padua

Current and preferred

Location: Qatar

Mob. +974-********

Email:

adqcsi@r.postjobfree.com

OBJECTIVE

To enhance and share my

knowledge as Principal or

Senior Electrical Engineer

career while working in a

challenging and

collaborative atmosphere.

To be engaged in a firm

that would broaden my

proficiency in technical,

communication and

mentoring skills. To lead a

team and deliver to clients

an appropriate, sustainable

and innovative solutions.

EDUCATION

Bachelor of Science in

Electrical Engineering

Cebu Institute of

Technology-University-

Cebu City Philippines –,

Class of 1996

GOVERNMENT

RECOGNITION

Doha, Qatar: March

10, 2008– Certified

Class “A" Electrical

Engineer by the

Ministry of Urban

Planning

Development

Authority (Engineer

ID # 1256)

Philippines:

November 11,

1996 - Registered

Electrical Engineer

KEY QUALIFICATIONS

Certified Grade ‘A’ Electrical Engineer issued by Qatar Engineering Committee with twenty-Five (25) years of professional work experience both in project management, construction supervision and electrical design services. Testing and Commissioning including electrical power reticulation and distribution systems. Broad experience in medium to large building and infrastructure projects, covering the spectrum of design, installation, testing and commissioning of Electrical systems

Proven ability to liaise, influence and negotiate with clients and authorities for design approvals. Experience in technical writing, Cost reporting and client liaison at management and project level. Knowledge and experience of design software such as DIALUX, ECODIAL and ACAD. 18 years of GCC experience and working knowledge of design and construction practices specific to Qatar regulations.

In addition to technical strengths, with strong communication and mentoring skills that can lead a team to deliver to the client with appropriate solutions. Demonstrate support and compliance with the requirements of Health, Safety and Management system through understanding and commitment values, Code of conduct and policies. Knowledgeable and acquainted to enforce and maintain an efficient regime of field inspections to guarantee the implementation of the quality assurance program and oversees contractor’s implementation of the quality assurance program. Directly reporting to Project Manager and conducting a meeting with Managing Director and to concerned government department and client representing consultant. Frequently interfaces with other engineering disciplines as well as other departments. Reviews and prepare issues, specifications, BOQ’s and other electrical related construction documents as necessary.

Able to work with people at all levels, from laborer’s to higher management. Flexible, adaptable to changing priorities and situations, Cost-conscious and committed to company success. Excellent in the English Language used as a medium of communication in written and spoken and proficient in using computer applications.

Ability to accept a high degree of responsibility in a team-based organization, combined with an ability to work independently and collaborating closely with an office based engineering design team.

PROFESSIONAL EXPERIENCE/ACCOMPLISHMENT

(June 2021– September 2021)

Senior Electrical Engineer – Reliever Engineer Only DARA Engineering Consultants.

Al Emadi Financial Square Building

No. 4 - 2nd floor. C - Ring Road

P.O. Box: 2137., Doha, Qatar

D: +974-****-****

The scope of Works :

Project Management and Supervision Services for the following projects:

• The Pearl Four Seasons Hotel: Residential ( Mid-Rise Apart. Bldg., Bungallows,, Hospitality& Retail)-2B+G+5P+17+2PH

Client: Q-BAIRAQ Develpoment & Investment Co.

• The Pearl Residential Building (AP-05) – 1B+G+5+P Client: SHK . HAMAD Bin Jassim

• Doha BEACH Villa

Client: Al-Sedra Al Qataryah Holding Co.

2 of 8 Ronie E Padua-cv

by the Professional

Regulatory

Commission (PRC)

License No.

0003417

Member: Institute of

Integrated Electrical

Engineers State of Qatar

Chapter.

Life Member: Institute of

Integrated Electrical

Engineers (IIEE),

Philippines

TRAINING AND

SEMINARS

March 07 &19 2021,

April 9, 16,23, 30, 2021

and May 7, 2021

Classroom seminar and

Workshop on Electrical

Design Analysis at

Holiday Villa Hotel,

Doha Qatar

• Electrical and Voltage

Drop

• Short Circuit

Calculation

• Protection

Coordination

• Arc Flash Analysis

• Grounding and

Bonding System

• Load Flow Analysis

November 6, 2020- Thru

ZOOM Video

Conferencing, Doha,

Qatar

• Power Management

System of a Substation

• Practical Electrical

Design for Single and

Multifamily Dwelling

October 11, 2019- City

Center Rotana Hotel,

Doha, Qatar

• Project Design

Management

• Testing,

Commissioning&

Maintenance of

Transformers

• Basics of

Instrumentation

August 02, 2019- City

Center Rotana Hotel,

Doha, Qatar

• MV &HV Gas Insulated

Switchgears

• Professional Services for Detailed Design and construction of satellite station unit for technical affairs dept. at Duhailiyat, Qatar Client: QATAR ARM FORCES, Qatar Emiri Forces of Engineer

• Proposed Hotel Building At Rawdat Al-Khail, Doha-Qatar 2B+G+M+6+P

Client: SHK. Mohammed Hamad J.J Al-Thani

• Proposed Residential Building at Lusail Al kharja District ( Res. 34)- 2B+G+20

Client: SHK. Hamad Bin Jassim

• Commercial and Residential Compound at Azizia-G+2 Client: SHK. Hamad Bin Jassim

• Pearl Mosque -LG+G+M

Client: H.E SHK. Hammad Bin Jassim Bin Jabor Al-Thani

(Nov 2019– May 2021)

Senior Project Engineer-Electrical

AL EMADI GROUP

Arab Contractor Trading Cont. Co.

Salwa Road, Building - 382, Zone - 55, Street - 340 P.O Box.No.22543, Doha - Qatar

Senior Project Engineer of the following Projects:

• Qatar University Center of Transactional Molecular medicine at The New research Complex Building, Zone C.

• The Pearl Residential Building 2B+G+6

• Ras laffan Workshop & Office Buildings

• Al Wakra Mixed Used Development Buildings

• National Mattress Factory

• National Foam Factory

The scope of work shall include but not be limited to:

• All electrical technical engineering works such as shop drawings, submittals, material take off and liaise with other teams from client, attend technical and progress meetings and collaboration with concern technical engineers from local supplier specialist

• All Complete electrical works, including ELV systems, Earthing and Lightning Protection systems, MEP Works in accordance with the requirements of the Project Documentation.

• Liaise with Kahramaa for t h e supply & installation of 11 kV switchgear, Cables, MV cables from MV switchgear to transformers, and LV cables from transformer secondary to LV Panels

• Supply and installation of Busbar risers, ACB s SMB s, DB s, control panel isolators, etc.,

• Testing, commissioning and setting to work of all items.

• Carrying out detailed design, sizing and calculations and verifying and checking the design done by other members of the team.

• Ensuring all documents and drawings are issued on time with proper quality.

• Coordinating / performing all activities within engineering discipline stream for the project.

• Preparation of electrical drawings (incl. layouts, single line diagrams, wiring diagrams and interconnections)

• Relay client and authority comments on electrical design deliverables to Technical Managers and design teams and track resolution and incorporation of comments and issues

• Support Project Managers in evaluating contractor bid submissions during the tendering phase

• Support the Technical Managers in coordinating with local authorities to obtain necessary permits and approvals to commence the construction stage, as needed

(Sept. 2018– Sept. 2019)

Senior Engineer-Electrical

Unitech Contracting & Engineering Services WLL

Doha, Qatar

• Project: Reconstruction & Upgrading of Old Salwa RPS with Underground Reservoirs

3 of 8 Ronie E Padua-cv

maintenance and

Operations

• BIM in Project

Estimation and Costing

February 16, 2018-

Holiday Inn Business

Park, Doha Qatar

• Fundamentals of Short

Circuit

• Insulation Coordination

• Introduction to Gas

Insulated Switchgear

(GIS)

• Intro to LEED Green

building (US GBC)

• November 3, 2017 –

Doha Qatar

• Basics of Insulation

Coordination

• Introduction to SKM

for Windows Software

& Presentation of

Captor Time-Current

Coordination

• New Electrical

Engineering Law (RA

7920)

November 4, 2016 –

Doha Qatar

• Seminar on IP CCTV

Camera and CCTV

Network System

Design

• Advance Lightning

Protection System &

Application

June 5, 2015 – Doha

Qatar

• KAHRAMAA

Distribution Substation

• Power Quality &

Thermography

April 10, 2015 – Doha

Qatar

• Installation of Grid

Tied Roof Mounted

Solar Panel

• Power Distribution for

High Rise Building

November 7, 2014 –

Doha Qatar

• Seminar on Overview

of Essential Electrical

System for Hospitals

• Gas Turbine Combined

Cycle Power System

• Basics of LED and the

Application of LED

Lighting

June 06, 2014 – Doha

Qatar

• Seminar on ARC Flash

Analysis Calculation

Project No.: GTC/518/2012

• SAMRYA HOTEL TOWER

Project No.: GP 12221, 3B+G+M+50

The scope of Works :

The scope of work includes the construction, installation, reticulation of technical documents, preparation of drawings and materials for submittal approvals, testing and commissioning of electrical services as described in specification and drawings. Responsibilities:

• MEP Design and Review of electrical IFC and Shop drawings (incl. layouts, single line diagrams, wiring diagrams and interconnections) in AutoCAD

• Coordinating and perform all activities within engineering discipline stream for the proper installations of equipment’s and cable containments.

• Carrying out detailed design, sizing and calculations and verifying and checking the design done by other members of the team.

• Designing of electrical building services for substation including: Lighting, FA, grounding etc.

• Ensuring all documents, Including ITP’s AND MoS and drawings are issued on time with proper quality.

• Relay client and authority comments on electrical design deliverables to design Project Managers and design teams and track resolution and incorporation of comments and issues.

• Provide technical support on electrical design drawings to supervision teams during construction

• Site supervision, Inspections and Support in planning for the priority schedule to be completed and execution of electrical activities The scope of work for NEW WATER STATIONS shall include the following but not limited to:

• 11KV Switchgears and 11kV/415V transformers

• Main Low Voltage Switchgears and MCC consisting of transformer and generator incomer and main pump starters, driver units for main pump motors

• 11KV cabling and installation between 11KV switchgear to transformer.

• Single core PVC/SWA/PVC cabling and installation between transformer and MLVS/MCC switchgears

• Cabling, terminations and connection to mechanical services

• Fire alarm system

• Lighting system

• Lightning protection and Earthing system.

• BMS System

• Telephone system

• CCTV System

(June. 2018– Sept.2018)

Senior Project Engineer-Electrical

ABANTIATEMPO L.L.C

Doha, Qatar

Project: Lusail Development for Lusail Light Rail Transit System The scope of Works :

• Installations of LV Switchgears, SMB’s, DB’s, UPS system including by pass system and Battery racks. Control Panels for emergency and Sump pumps

• Installation of MCC, VFD’s and Control Panels for Fire Pumps

• Installation of MCC for pressurization, exhaust fans and chiller units

• Design, Construction, Installation, Testing and Commissioning of the Lusail Light Rail Transit System Project (LRT)

• Installation, Testing & Commissioning of LV Equipment

• Installation, Testing & Commissioning of Normal & Emergency Lighting

• Installation, Testing and Commissioning of UPS system.

• Installation, Testing & Commissioning of Central Battery System (CBS)

• Installation, Testing & Commissioning of Earthing, Lightning and Equipotential bonding system

• Installation of Main Power Cables, Earthing cables from the normal and essential main Light Power Substation (LPS) Switchboard to all the MEP SMDB’s MCC’s

• Installation of Containment (cable trays/Trunking, G.I Conduits, PVC and Flexible conduits

4 of 8 Ronie E Padua-cv

• BUS DUCT and

Capacitor Bank

August 9-10, 2014 –

Doha Qatar

• Institute of Integrated

Electrical Engineers 1st

Middle East Convention

November 19, 2010 –

Doha Qatar

• Seminar on Lighting

System Design using

RELUX and Technical

Seminar on Power

Cables.

July 9, 2010 – Doha

Qatar

• EX-OR, MLS Lighting

Control System and

Echo Wireless and

Battery-Less Switch

• Conceptual Approach

of Protective Relaying

to Power System

• Foundation Field bus

and Wireless Hart:

Principle and

Application in Control

System

July 10, 2009 – Doha

Qatar

• Seminar on Process

Control

Instrumentation ( With

ISA Standard) and

New Technology Street

Lighting

October 4, 2003 – Pasig

City, Philippines

• 72 hours course in

AUTOCAD Designing

and Plotting

January 1 4, 2000 –

Quezon City, Philippines

• Seminar on 5-S

System of

Housekeeping

November 5-6, 1999 –

Quezon City, Philippines

• Seminar on Industrial

Maintenance

Management

June 8-9, 1999 –

Quezon City, Philippines

• Seminar on Advance

Studio Lighting System

(May 2007 – May 2018)

Senior Electrical Engineer

IPROPLAN PLANNERS C0. LTD. (Consulting Engineers and Architect) Doha Qatar

Project Completed:

Qatar Petroleum Township at Dukhan March 2013 – May 2018

• Project Management and Supervision Services for Dukhan Sports Facilities and Juma Masjid

• Project Management and Supervision Services for Dukhan Housing Project Phase IX

• Testing, Pre-commissioning and commissioning for all new and modified works of electrical equipment’s or systems. Main MV & LV Panels, SMB’s, SMDB’s, Distribution boards, Feeder pillars, Irrigation panels, Service cabinets(Tariff Meters), Multi-Function Meters, Cables, bus couplers, CAMS system, Telephone System, Television system, AVIS system, CCTV system, including review and approval of Method Of Statement and Inspection Testing Plan (ITP), etc.

The scope of Works :

• The Scope of Work (SOW) generally comprises the Construction, Completion

& Maintenance of the Mosque, Sports Facility, and Housing Facility which consists of Traditional & Modern Type Villas and Apartment Blocks scattered over the plot in five (5) Packages for Qatar Petroleum at Dukhan Township. Infrastructure works include roads, drainage system, Treated Sewage Effluent (TSE line), electrical post & lightings and fire hydrant piping network. Tie-in works for Electrical, water, and drainage.

• Installations of LV Switchgears, SMB’s, SMDB’s, MCC and Control panels for domestic water pumps, Irrigations pumps, Sump pumps, Submersible pumps, Emergency flood pumps and isolator units.

• Installations of MCC Panels, Control Panels and Isolator units for Treated Sewage Effluent (TSE) Lifting Stations, Equalization Tanks and Chlorination.

• Carry out technical reviews for all areas of work covered in Building Services and infrastructures. These include but are not necessarily limited to LV distribution, lighting and power, road and area lighting, Earthing system, fire protection using wired and wireless conventional analogue and high sensitivity type detectors integrating at QP existing security command center.

• Coordinate with QP-Dukhan Operations Department for taking power from the Electrical

Substation as outlined on AFC drawings including supply.

• Point of contact of client Electrical Engineers and QP concerned department Senior Lead Electrical Engineers for all electrical works, electrical submittals, electrical issues, and concerns.

• Coordinate to Asset holder Electrical Engineers and Inspectors for the field inspections of electrical works.

• Liaise with all related parties on matters relating to the progress of work, acceptance of work and approval of plans.

• Enforce and maintain an efficient regime of field inspections to guarantee the implementation of the quality assurance program.

• Coordinate with QP stakeholders, QP concerned department and client O&M on the training required by the Contract prior to hand-over and close-out.

• Witness Factory Acceptance Tests (FAT), Site Acceptance Tests (SAT), Testing, Pre-commissioning and Commissioning.

• Assist other Senior Engineers in reviewing of shop drawings, design proposals, method statements and other related activities in his discipline.

• Identify possible value engineering ideas to cut costs/time, in accordance with project teams

• Assist and approve testing & commissioning.

• Review and Approve shop drawings, as-built drawing, project dossier documents and Respond to site clarification and inspection request. Completed Projects for Project Management and Supervision Services

• Client: Hassad Food Company, Q.S.C- ( Jan. 2010 to Feb. 2013) Design and Post Contract Consultancy (Project Management and Supervision) of Grain Bunker and Storage in Wadi Aba Seleel.

• Client: Qatar Museum Authority (QMA)- (Sept. 2010 to May 2012) Design and Post Contract Consultancy (Project Management and Supervision) of Service Building and Substation.

• Client: Public Works Authority (Ashghal) ( Feb.2010 to Jan.2012) Building Affairs Department Post Contract Consultancy (Project Management and Supervision) Services for Construction, Completion, and Maintenance of Coast Guard Stations at Ras Abrouq (P-1) and Umm Bab (P-2). 5 of 8 Ronie E Padua-cv

• Client: Qatar Olympic Committee (QOC)- ( May 2007 to April 2008) Post Contract Consultancy (Project Management and Supervision) Services for Construction of Umm Salall Ali Cultural and Social Centre

• Client: Qatar Olympic Committee (QOC)- ( Aug. 2007 to Dec.2008) Post Contract Consultancy (Project Management and Supervision) Services for Development of Second Division Sports Clubs (Umm Salall, Al-Kharatiyat and Al-Markhiya).

Duties & Responsibilities:

• Generally carryout duties and responsibilities for all aspects of electrical work covered under buildings and infrastructure ranging from project definition, contract, design, specification, construction and handover stages.

• Conduct ocular site inspection to ensure that the flow of scope of work is in accordance with the project methodology and installation as per engineering specification.

• Enforce and maintain an efficient regime of field inspections to guarantee the implementation of the quality assurance program.

• Assist the project manager in reviewing contractors billing submittals

• Prepare issues, specifications review and other electrical related construction documents as necessary.

• Supervise the Execution of works including Quality Control Plan, ITP, Method Statement and related work instructions and agreement from client approvals.

• Overall review of electrical works, MV. LV, ELV and special systems technical Submittals in a timely and accurate manner conforming with the Design requirements of the contract and local design standards.

• Review/ Approved /Endorse detailed shop drawing, calculations submitted by contractors, sub-consultant and suppliers.

• Review/Approved As-Built drawings and ensure that they are inclusive of the As-Built conditions incorporating design changes, variations, approved materials, plant and equipment for electrical works.

• Review and provide a recommendation to RFI’s submitted related to electrical works.

• Review the inspection comments provided by the electrical engineering team prior to releasing them to the client, when necessary, attend scheduled inspections via Inspection Request and provide accurate inspection comments.

• Provide technical assistance and coordination with other discipline specialists.

• Coordinate technical reviews and analysis during vendor prequalification, bid evaluation, and performance evaluation.

• Witness Site Acceptance Test (SAT), Factory Acceptance Test (FAT), testing and commissioning until completion and provide a status update to end users and clients.

• Review/Approved/endorsed energization documents.

• Coordinate/Review/Approved contractors Permit To Work (PTW) applications.

• Coordinate the surveillance and regular site walkthroughs to ascertain the electrical works are proceeding in accordance with requirements.

• Liaise with all concern discipline on matters relating to the progress of work, acceptance of work and approval of shop drawings.

• Review the scopes of electrical re-design works including BOQ’s and response to RFI’s.

• Review and approval of project dossier submittals.

• Review and recommend for approval of contractors Permit To work (PTW) applications.

• Liaise with all related parties on matters relating to the progress of work, acceptance of work and approval of plans.

• Review and Approve detailed design shop drawings, as-built drawings submitted by contractors with its Sub-Consultant Engineers and vendors.

• Perform other related duties and assignments as directed Completed Design Projects:

• Project Description: ( Jan. 2013 to Jan.2016)

Design of Administrative Offices, Garage, Labor Accommodation and TSE at Wadi Al Mazrouaa Zone (Jarie Al Samar) on 173,000 M2 plot of build Client: Public Works Authority (Ashghal) Building Affairs Department project Investments cost: QR 170,000,000

• Project Description: ( Jan.2010 to Feb. 2013)

Design of Grain Bunker and Storage in Wadi Aba Seleel. Client: Hassad Food Company, Q.S.C

Investments cost: QR 8,800,000

6 of 8 Ronie E Padua-cv

• Project Description: ( Sept.2010 to May 2012)

Design of Service Building and Substation

Client: Qatar Museum Authority (QMA)

Investments cost: QR 170,000,000

• Project description: ( May 2010 to Nov.2013)

Design of Lusail Hospital (New full-service hospital) Client: American Hospital Co. Alwatanyah Holding

Gross Floor Area 37,000.00 m

Investment cost: QR 365,000,000

• Project Description: ( May 2010 to Nov.2012)

Design of Ambassador Tower Hotel at ONAIZA Area, 3B + G + M +53, Client: Retaj Marketing and Project Management

Total build up Area =81,869.07m

Investment cost: QR 400, 000, 000

• Project Description: (Dec. 2007 to Sept.2008)

Design of Sumaisma and Barzan Cultural Centers

Client: Qatar Olympic Committee

Investment cost; QR 60M

• Project Description: ( Sep. 2008 to Oct.2009)

Design of Parks at Umm Salall Ali, Plot Area = 18,000m Design of Park at Kharatiyat, Plot Area = 3,464m

Design of Plaza at Kharatiyat, Plot Area = 2,094m Design of Park at Umm Salall Mohammed, Plot Area = 5858m Client: Public Works Authority Town Beautification and Maintenance Department and Building Affairs

Investment cost: 20,000,000, QR

Duties & Responsibilities:

• Senior Electrical Design Engineer for the following Design: i. Power system

ii. Lighting system (including street lighting)

iii. Lightning protection and grounding system

iv. CCTV Security system

v. Fire Alarm System

vi. Telephone and Data System

• Obtaining approval from KAHRAMAA, Civil Defense (CDD & MOI–SSD) department)

• Assist and develop Scope of Work (SOW), Specifications and design criteria for buildings/facilities, infrastructure for the functional area of work, to be included in tenders for engineering consultancy and/or construction.

• Coordinate with other engineering team and supplier’s technical team.

• Prepares necessary correspondence, technical reports, contract documents, fact sheets and status reports and prepares final construction drawings suitable for obtaining qualified bids from Clients.

• Taking responsibility for projects from initial design to construction.

• Working in collaboration with other design disciplines to ensure the integrity of the overall design

• Preparation of SLD’s, Load Analysis, electrical sizing calculations, Schematic diagrams, layout plan and details for power and ELV’s, Earthing, lighting and lightning protection layouts, Cable schedule, Bill of material and interconnection drawings.

• Design of electrical building systems including lighting, MV/LV power distribution, standby generators.

• Design of ELV such as CCTV security system, Fire Alarm System, Access Control. Telephone System.

• Illumination Calculation using DIALUX lighting software.

• Review and propose solutions to problems associated with varying authorities for approval and issues

• Design reviews for conformance with Local Regulations and International standards contract documents and client requirements.

• Assist, answer and Comments to tender evaluation report queries.

(May 2006 – April 2007)

QA/QC Electrical Inspector – SAP # 70006370

CCE - Contracting and Construction Enterprises. Khursaniyah, K.S.A Project: ARAMCO Khursaniyah Gas Plant Industrial Support Facilities The scope of Works:

7 of 8 Ronie E Padua-cv

• Assigned to various Industrial Support Facilities (ISF) Internal and External Buildings to execute electrical works as per ARAMCO Standard and Specifications.

• Assist the Project Manager in the dealing with major subcontractors and suppliers, and to monitor their technical performance to ensure compliance.

• Identify potential risks and issues to mitigate and prevent them from causing any disruption to project.

Duties & Responsibilities:

• Installations of outdoor type 13.8kV/440V transformers, LV Switchgears, isolator units, VFD’s and control panels for 15 MIG water pumping stations.

• Aramco Approved as QA/QC to monitor, Inspect, Conduct Surveillance and implement quality assurance as per Aramco Standard and other applicable International Standards for proper workmanship.

• Implement engineering systems, documentation and Control in compliance with Health and Safety Company Legislation and industry standards.

• Provide Quality functions through the performance of Field Direct Point Inspections (RFI and Surveillance based).

• Witness Equipment testing, i.e., HI-POT Test, Megger testing, Die-Electric test, etc.

• Review and Validate test results related to inspection points.

• Review and approved contractor and sub-contractor material submittals.

• Issue Job Site Instructions for non-compliance on installations.

• Advice on any Electrical engineering potential problems, issues, and deficiencies identified on actual site conditions.

• Enforce and maintain an efficient regime of field inspections to guarantee the implementation of the quality assurance program.

Site Electrical Engineer May 18, 2006 – Dec. 24, 2006

• Responsible for the installations, terminations, reticulations of Electrical Equipment’s: 13.8KV/0.48KV Transformers, MV/LV Switchgears, MCC’S, SMB’s, Distribution Boards, Control Boards, Isolator switches, Lightings and small power outlets, Power Cable in Trench/Duct and Telecommunication Duck Bank, MV/LV Cable pulling, Glanding and Terminations for the following buildings:

• Khursaniyah Gas Producing Facilities,

• Administration office and Training building

• Fire Station and Transportation Building

• Gas Plant Metal shop building

• Fuel Station building

• Substation building

• A/C Plant and chilled water pump house building

• Communication building

• Security office building

• Gas Plant staging building

• Pumping/Lift Station building

• Clinic building

(Nov. 2003 – Dec. 2005)

Electrical Engineer

Al-Taif Operation and Maintenance Contracting Ltd- King Fahad Cultural Center, Riyadh, KSA

The scope of Works:

• Overall, in charge of the Electrical Engineering works and technical aspect of the project this includes Installations of Substation Transformers (Indoor and Outdoor), MV/LV Switch Gears, MCC’s, SMB’s, DB’s, Control Panels, and Stage Lighting Dimmer Panels. Installation and Termination of Electrical Power devices

• Compile Operation and Maintenance Manual, comprising of specifications, information on the equipment installation and As-Built Drawings.

• Oversee the project site progress to comply with the established master schedule, installation method, applicable operational works methods statement, and Codes of Practices.

• Operation and maintenance of Electrical Equipment’s ( Reactive, Preventive, Predictive and Reability Centred Maintenance)

(Sept. 1998 – Nov. 2003)

Electrical System Engineer

ABS-CBN Broadcasting Corp. Quezon City, Philippines The scope of Works:

8 of 8 Ronie E Padua-cv

• Member of ABS-CBN Project management team in assisting and implementations of new studio lighting system design, Project Engineer and officer-in-charge of various ABS-CBN expansion Projects for Regional and Provincial Studios. Project Team Leader In reviewing and implementation of studio lighting system design from foreign designers. Prepare system design based on TV lighting requirements.

Duties & Responsibilities:

• Supervision and Coordination of maintenance of studio electrical equipment and digital lighting system controls.

• Evaluation and approval of electrical system required by Broadcast Engineering Department and TV production requirements.

• Supervise and oversee all Electrical installation activities such as 480/240V dry-type transformers, Motorized hoist system, Digital Lighting Dimmer Control panels, Bus duct system, Terminations and glanding of power cables, Lighting control data cables, Etc. and manage the various stages of the design process.

• Assist the maintenance department in engineering assignments and implement safety, reliability and cost improvements

(Feb. 1997 – July 1998)

Electrical Engineer

Asian Construction Development Corp. Pampanga, Philippines Project: Philippine Centennial Expo Project, Clark field Pampanga, Philippines

The scope of Works:

• Reporting to the Senior Electrical Engineer as Site Electrical Engineer primarily responsible to supervise all electrical



Contact this candidate