| Distance: |
Resume alert |
Resumes 141 - 150 of 154 |
Scottsdale, AZ, 85251
... Project management (module leader) for developing components of a new gas turbine engine - Developed and managed a schedule, budget and resources for $2.9M program - Led a team including internal engineers and external contractors - Conducted ...
- 2010 Aug 16
Scottsdale, AZ, 85259
... (enclosed arena) with a 3,000-seat BMX track and the Eaton Manor facility boasting two 3,000-seat stadiums, five Olympic-size swimming pools, a design / build/ operate wind turbine, and a geo-thermal power plant with additional infrastructures. ...
- 2010 Jul 29
Scottsdale, AZ, 85257
... John Power plants Arizona Added scrubber system to Page and St John power plants Complete system for power and controls for 4 scrubbers Benson Power plant Arizona Install new computerized controls to a backup gas fired turbine generator. Old system ...
- 2010 Jul 20
Glendale, AZ, 85303
... (MDHI) is a manufacturer of commercial single-engine and twin-engine turbine helicopter aircraft. MDHI is a Boeing Company spin- off of the Boeing facility located across the street. As the Director of QA, I was hired to develop and implement an ...
- 2010 Jul 20
Chandler, AZ, 85226
... HONEYWELL (formerly Allied Signal), Tempe, AZ 1983-1994 Design Engineer- Designed and documented machine components and assemblies for air-turbine starters using concurrent engineering practices and principles for high volume manufacturing. - Design ...
- 2010 May 26
Phoenix, AZ, 85085
... Took the powdered metal and ceramic matrix composite technology downstream by fabricating cutting tools, turbine rotors and DoD aerospace prototypes Resume of Michael A. Gust ... continued MANAGEMENT CORE COMPETENCIES: . Built and operated world ...
- 2010 May 10
Chandler, AZ, 85225
... I worked as an Applications/Sales/Service Coordinator for FTI Flow Technology, a manufacture of turbine flow meters for the measurement of liquid and gas flow, and flow meter calibrators to set and validate standards. In this position I sold ...
- 2010 Apr 22
Phoenix, AZ, 85018
... Garrett Turbine Engine Company Phoenix, AZ Manager, Maintenance Service Plan Sales and Administration 4/84 - 1/85 Managed a team of professionals responsible for the sales and administration of a maintenance service plan. . 250+ contracts executed ...
- 2010 Apr 22
Phoenix, AZ, 85022
... Palo Verde Nuclear Generating Station, Units 2 & 3, Wintersburg, AZ - Lead Project EPC Planner for Unit 2 construction with responsibility for reactor building and turbine assembly areas. Lead Start-up Test Planner on Unit 3 for the 1,270 Mw PWR ...
- 2010 Mar 15
phoenix, AZ, 85027
... and single cycle GE 7A Frame gas turbine/generator -200 mega watt and an 8A frame GE steam turbine generator 150 mega watt using a 3 pressure injection system - high, medium, low with primary and secondary super heaters, with combined heat recovery. ...
- 2009 Oct 22