| Distance: |
Resume alert |
Resumes 121 - 130 of 154 |
Chandler, AZ, 85226
... Project Experience Research assistantship in gas turbine heat transfer lab at Arizona State University (Jan 2010 – Dec 2011) As a Research Assistant in gas turbine heat transfer lab at Arizona State University, I have worked on HRSG project. ...
- 2012 Mar 09
Tempe, AZ, 85281
... Technologist May ‘08 – Jul ‘09 As a part of services team, involved in developing the rule algorithms for Monitoring and Diagnostics of heavy duty gas turbine. The project involved analyzing the gas turbine data to predict its performance and ...
- 2012 Mar 07
Phoenix, AZ, 85017
... Feasibility Study Spring 2011 Organized and coordinated meeting times and team member responsibility for a team of five engineering students collaborating in a feasibility study in the development and marketing of a recuperative turbine engine. ...
- 2012 Feb 24
Mesa, AZ, 85205
... • Used the IESNA standard to complete lighting calculation for four turbine buildings, including Roadway/security lighting, building exterior areas and 16 industrial/commercial buildings. I have used 3-D, 2-D CADD Microstation for lighting, designed ...
- 2012 Feb 10
Tempe, AZ, 85281
... Dynamic Modeling of a wind turbine generator, Spring 2011: • Modeled a wind turbine generator with speed, torque and pitch angle controls by using PLECS toolbox in MATLAB Simulink. • Designed and implemented active and reactive power controllers for ...
- 2012 Feb 01
Chandler, AZ, 85286
... Experience with Submersible and Vertical Turbine Well Pumps . Clean-in-place procedures and membrane operations . Proficient with SCADA Systems . Microsoft Word, Outlook and Excel . Sample collection (bacteriological colilert testing, TDS, VOC's, ...
- 2011 Aug 01
Phoenix, AZ, 85022
... 50/50 hands-on/classroom training: Airframe Units Powerplant Units Metallic Structures Powerplant Systems Composite Structures Turbine Engines & Operation Gas and Electric Welding Reciprocating Engines Hydraulic/Pneumatic Systems Fuel Metering & ...
- 2011 Jun 03
Mesa, AZ, 85202
... Selected priorities: Directly responsible for North American wind turbine sales activities meeting; budgeted revenue and margin levels for assigned market segment. Developed negotiation strategies and led negotiations with customers for turbine ...
- 2011 May 16
Phoenix, AZ, 85044
... Significantly exceeded financial objectives of a $250 M turbine engine product line with sales 14% over plan and profit before tax 91% over plan . Led successful financial negotiation of a $3.2 B turbine engine contract with a major commercial ...
- 2011 Apr 19
Phoenix, AZ, 85034
... Control Certification & Capacity Requirements Planning Certification EXPERIENCE TRIUMPH COMPONENTS - ARIZONA, Tempe, AZ 2002 : Profile $565 million national manufacturer of sheetmetal components for turbine aircraft and ground power equipment. ...
- 2011 Jan 18