Post Job Free

Mrp resumes in Dallas, TX

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 91 - 100 of 410

Supply chain manager. demand planning manager

Dallas, TX
... Troubleshot and fixed a recurring MRP issue which allowed piece part demand to be accurately depicted to buyers. Halliburton Spring, Texas Master Planner January 2014 to April 2016 Manage an order book that averaged between 30 to 40 million in ... - 2019 Oct 13

Supply Chain Engineer

Irving, TX
... Ltd., India 2018 • Applied Material Requirement Planning (MRP) lot to lot sizing model to control the inventory of raw materials based on demand forecasting. • Worked in the Procurement Department and created RFOs and POs. • Created daily and weekly ... - 2019 Oct 11

Engineer Manufacturing

Grand Prairie, TX, 75052
... Other skills include utilizing AS-400 for implementing bill-of-materials and routings for new assembly and sheetmetal parts for MRP. Created and set up assembly work instructions for new vending machines, as well as developed testing procedures to ... - 2019 Oct 07

Technical Writer

Irving, TX
... Systems Analyst • Participated in implementing a manufacturing resource planning (MRP II) system at a Unisys plant. • Collaborated with international users to identify needs; write specifications; and design, develop, document, test, and install at ... - 2019 Sep 06

SAP APO (SNP, DP, PPDS & CIF)

Dallas, TX
... 20% oPerformed Kaizen and Six Sigma Pareto Analysis to examine root causes for damage claims Forecasting sales of BMW cars in USA – Routing of 25 finished products, work center operations and planning demand using MRP and MPS for 15 BOM structures. ... - 2019 Aug 08

Data Supply Chain

Arlington, TX
... with Engineering, Quality, MRP, Planning and Master Data to resolve issues Procurement Team Lead – SAP ERP and DS Enovia PLM Implementation (2009 to 2013) ●Led Procurement Team through full cycle implementation of new SAP Procurement functionality. ... - 2019 Jun 19

Supply Chain Analyst Intern

Dallas, TX
... • Assisted in generating MRP’s in accordance to BOM’s and MPS requirements using enterprise resource planning software. • Managed overall stock level in lieu of demand to reduce finished goods inventory by 19% and total inventory value by 12%. • ... - 2019 May 07

Supply Chain Management

Richardson, TX
... Functional Skills: Block chain, Project Management, KPI Metrics Assessment, Inventory Management, Resource Capacity Planning, MRP 1, MRP 2, BOM, Logistics Control, Production planning, Demand Forecasting, Sourcing and Supplier Management, DMAIC ... - 2019 May 03

Engineer Engineering

Dallas, TX
... Tracked inventory from BOM using MRP system. Assisted in production planning by detailed operation scheduling. Developed Visual Work Instructions and updated SOPs for manufacturing processes and quality inspections. Analyzed and documented quality ... - 2019 Apr 17

Sales Data Entry

Garland, TX
... Samsung Telecommunication America Inc., Plano, Texas Planner/Buyer in Verizon & Regional Carriers 2010 – 2011 Planned and maintained MRP for New Product Introductions and plan end-of-life cycle forecasts. Maintained master materials data and bill of ... - 2019 Feb 03
Previous 7 8 9 10 11 12 13 Next