Post Job Free

Mrp resumes in Dallas, TX, 75225

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 61 - 70 of 446

Production Scheduler Planner

Wylie, TX
Rick Korn Materials Planner Procurement Production Inside Sales Phone: 562-***-**** Wylie, TX admwwx@r.postjobfree.com Inventory Management • Materials Control • Procurement • Parts Order Placement • Planning • Material Requirement Planning MRP • ... - 2021 Jun 03

Wholesale Engineer

Arlington, TX
... SAP ERP Global Bikes (SAP ERP) • Worked on MRP, Inventory Management modules. Displayed warehouse inventory Storage, Bin status report, unit types and Bin types based on Client requirement, increasing customer satisfaction. Inventory Forecast for ... - 2021 May 18

Industrial Engineer

Arlington, TX
... • Thyssenkrupp Industries India Private Limited Jan 2018 - Jun 2018 Optimized raw material inventory by using MRP, slotting techniques & ABC analysis. Achieved a reduction in inventory carrying cost by 25%. Led a group of 3 responsible for the CAPA ... - 2021 May 18

Data Tableau

Irving, TX
... Role: SQL/BI Developer Responsibilities: Team member in development of an in house MRP package to integrate Material Procurement, Inventory Control, Spares Management, Preventive Maintenance Planning Module and Production Control System Projects. ... - 2021 Mar 31

Sales Manager

Dallas, TX
... Led implementation of scheduling software system integrated with MRP/ERP system. Engaged employees, promoting “Breakfast with the Boss” program and switching from “build to order” model to “stock/assemble to order” model. Developed super-users of ... - 2021 Feb 23

Procurement and Inventory Analyst, Inventory Manager

Arlington, TX
... 5S, Kanban, Failure Mode and Effect Analysis (FMEA), Quality Systems, Facility Planning, Value Stream Mapping Software: ERP, MRP, Microsoft Office Suite (Excel, PowerPoint, Word, Visio), SQL, Tableau, IGrafx, AutoCAD, Advanced Excel (Pivot Tables, V ... - 2021 Feb 09

Manager Lean Six

Dallas, TX
... Ensured inputs into MRP system are accurate such that inventory control and purchasing accuracy is achieved. Created purchase orders based off need and forecast. Managed $88M worth of inventory globally. Supervised, trained, and mentored 2 Buyers. ... - 2021 Jan 27

Manager Engineer

Arlington, TX
... The technical expertise includes a complete configuration of the Sap R/3 system(using ASAP Methodology) and its core module e.g FI/CO, MM(MRP RUNS), SD that includes the Master data configuration also. functional expertise are in the area of Supply ... - 2020 Dec 23

Oracle Developer / Lead Developer / SCM Functional Consultant

Frisco, TX
... Assisted with MRP/MPS, WIP, OE, GL, AP, and AR modules. Oracle World Wide Support Oracle EBS Support Technical/Functional Support SWAT Team Leader Managed a team of functional and technical experts in problem management and resolution of high ... - 2020 Dec 17

Receptionist/Data Entry

Carrollton, TX
... Maintain supplier information and pricing in the MRP system. - Responsible for communication and follow through with suppliers for rejected material. Verifies demand and generates purchase orders and compares standard cost to the actual pricing. ... - 2020 Dec 10
Previous 4 5 6 7 8 9 10 Next