|
Resume alert |
Resumes 31 - 40 of 91 |
Bridgeport, CT
... RF and fiber testing, reporting, and troubleshooting. Coordinate, oversee or perform system optimization of multi-node outdoor SCN systems. ATP testing and commissioning new DAS site RF design of an Outdoor DAS system and Macro 3G/4G system ...
- 2017 Dec 31
Ansonia, CT
... Neatening cables in storage racks while running new Ethernet and fiber cables in system Lan/Wan troubleshooting & administration Tangoe, Inc, Orange, CT November 2015 – January 2017 Level II Software Support Engineer Provide assistance to level 1 ...
- 2017 Dec 15
Branford, CT, 06405
... Guided efforts for system consolidation of IS Created a countywide fiber WAN to connect the four hospitals Coordinated fast-track selection of the PeopleSoft financial products Led a full PeopleSoft ERP system implementation (GL, AP, MM, and HR) in ...
- 2017 Oct 24
Bridgeport, CT
... Installed Cat5 and Cat6 Cable Teksystems Technician May 2012 – August 2014 Voice and Data Cabling Projects at Various Locations Temp Work The Mercury Group Project Foreman/Technician April 2006 – March 2012 • Voice, Data & Fiber Cable and Wireless ...
- 2017 Oct 06
West Haven, CT, 06516
... Analyzed expanding network, ran fiber, and implemented wireless communication. Designed configuration and layout of WAN to include IPT Internet facing VPNs and wireless subnet. Design, simulate, testing in terms of Mean Square Error (MSE) and Peak ...
- 2017 Sep 26
Woodbury, CT, 06798
... Ran fiber optic cables, terminating them and inspecting them for flawless termination. Ran CAT-5e and CAT-6A Ethernet cables. Converted all possible workstations to true mirrored hardware RAID. Ran VMware ESXi to virtualize server sprawl. Network ...
- 2017 Aug 30
Fairfield, CT
... LAN at our winery in Washington state oWorked with IT staff on site to order equipment and schedule electricians to run fiber oHad the team members stage the new Extreme X450 switches so I could configure it remotely oSpent a weekend on site with ...
- 2017 Aug 28
Bridgeport, CT
... • The objective of this project was to reduce the weight of leaf spring by designing it using fiber reinforced polymer (E- glass/epoxy). • This project focused on designing the leaf spring system, performing the finite element analysis, design ...
- 2017 Jul 24
Bridgeport, CT
... •Operations and 3rd level support on gateway and transport ring hubs, fiber optic troubleshooting, and maintaining in-building repeaters •Switch tech- layer 2 switching. Maintained cell site functionality and troubleshooting. Central Office Switch ...
- 2017 Jul 20
Mount Sinai, NY
... Networking & LAN, Telephony room build outs, running fiber and data cabling along with labeling, terminating and testing CAT6 cables. Sales included supplying & installing data rooms with horizontal wire management panels, data racks, CAT6 patch ...
- 2017 Jun 13