|
Resume alert |
Resumes 1 - 10 of 18 |
Kuala Lumpur, 50000, Malaysia
... Consultancy M&E, Plant Process Piping, C&S, Heavy Structural Steel Fabrication, Chemical, Oil & Gas, Heavy Electrics for Manjung 3x700 MW Coal Fired Power Plant & 500 kV Switchyard, Tanjung Bin 3x700 MW CFPP Boiler – Pressure and Non-Pressure Parts. ...
- Mar 25
Kuala Lumpur, 50000, Malaysia
... Site Housekeeping, Environmental & Hygiene Inspection, Scaffolding Inspection, Hoisting & Rigging Inspection, Internal & External Inspection, Auditing, Radiography and Workers Camp Facility for Coal Fired Jimah Power Plant Project in Port Dickson. ...
- Jan 06
Shah Alam, Selangor, Malaysia
... Company : DAELIM Malaysia Sdn Bhd (Fast 3A Project, TNB Janamanjung,) Nature of Business : EPC Contractor for TNB Job Title : Document Controller of Purchasing Department : Project Control Management (Procurement) Location : Manjung Coal-Fired power ...
- 2023 Aug 08
Kuala Lumpur, 50450, Malaysia
... Over the years, I have participated in construction & management of Small Hydroelectric Power Plant, LNG Regasification Facilities (RGT-2 Terminal) Project, SMR#2 Civil & Piling Work and Jimah Power Plant (2 x 1000 MW Coal Fired) with success. My ...
- 2022 Apr 04
Kuala Lumpur, Malaysia
... the cost estimate for the electrical rejuvenation scope Co-ordination between other disciplines on work requirement and interfacing Co-ordination with Petro-Canada (Oil Gas) and ELK Valley (Coal Plant) electrical engineer for the work scoping. ...
- 2021 Mar 25
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
... MAJOR PROJECTS HANDLED: Feb 2018 – Present: Project Control Manager, Lampunut Road, Bridge and Earth Work at Site Office East Kalimantan (Client – PT Maruwai Coal Jakarta Indonesia. Report to Project Manager. (Infrastructure Project). Responsible: ...
- 2020 Dec 18
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
... Key projects in Automotive Manufacturing, Consumer Goods, Distribution, Trading, Services and Coal Mining Industry. He is also well versed with requirements gathering, analyzing system impact, blue print preparation, realization and configuration, ...
- 2020 Nov 10
Petaling Jaya, Selangor, Malaysia
... Sept2001- Dec 2002 MANJUNG 2100 MW (3x700 MW) 500KV Sultan Azlan Shah Coal Fire Power Station TNB JANA MANJUNG Lumut, MALAYSIA (BOPE) Kentz MEPC ALSTOM POWER ASIA PACIFIC TNB GENERATION BERHAD Position: Electrical Commissioning Supervisor Review ...
- 2020 Oct 02
Petaling Jaya, Selangor, Malaysia
... 17 storey Project, Cyberjaya May 2015 – May2016 Projects (All Projects under Sinohydro) Period JIMAH East Power 2x1000MW Coal Fired Power Plant Project June 2016 – Feb 2017 Projects (All Projects under Aneka Jaringan) Period Lot 349 Sentral Suites ...
- 2020 May 19
Kuala Lumpur, Federal Territory of Kuala Lumpur, Malaysia
... PLTU Batang Central Java – 2 x 1000MW Central Java Coal Fire Power Plant Project – Batang, Central Java, Indonesia. Job Responsibilities: As E&IC Engineer, responsible for the Design Drawing review, Site Construction Coordination, Material ...
- 2020 Apr 28