|
Resume alert |
Resumes 61 - 70 of 196 |
Henderson, NV
... facilities maintenance, involved in the installation and commissioning of new equipment $40 million plant upgrade. ... • Achieved reduction in power consumption through effective energy policy, and redesign of AC system. • Developed better ...
- 2019 Jan 16
Las Vegas, NV
... for 7 sites three call centers, and over 1500 users Designed Tesla Buffalo plant wireless facility solution (876K Sq. ... Monitored RF measurements, developed Tx/Rx power reading schedules for LTE microwave antennas commissioning. Implemented ...
- 2019 Jan 12
Henderson, NV
... I was an Instrumentation Technician for Enrico Fermi Nuclear power plant and at Riverside Cement Company. I have worked as a maintenance mechanic, electronic technician, instrumentation and controls technician and have work on high speed sorting ...
- 2019 Jan 08
Las Vegas, NV
... plans and procedures based on system recommendations ●Provide plant with post installation and integration support based on ... Sweep Testing, Trouble Shooting, Equipment Procurement / Warehousing, Electrical, Power/Telco Installation & Design. ...
- 2018 Sep 19
Las Vegas, NV
... • Prepared estimates for federal agencies including TVA and DOE for Bellefonte and Yucca Mountain, onsite lead for a proposal to design, build and operate a $7B 1100MW oil power plant and 270mgd desalination facility at Al Jubail in Saudi Arabia. ...
- 2018 Aug 23
Las Vegas, NV, 89123
... Repaired rack mounted Servers and Workstations by replacing hard drives, RAM, CD drives and Power Supplies. Envisioned, ... 2005 - 2009 Performed all Outside Plant related duties including Running, splicing and terminating of fiber optic cable. ...
- 2018 Aug 01
Las Vegas, NV
... • Sunpower Solar Power Plant (On Site) - Boulder City, NV: 2/2016 – 01/06/2017 Document Control Specialist: Upload new issued engineering documents and drawings in EDMS (EBuilder) used on the construction project job site. Maintain document database ...
- 2018 Jul 18
Las Vegas, NV, 89101
... CHEMICAL PLANT. Wichita, KS. General Construction Superintendent. Completed 6 weeks early and one and one-half million dollars below budget. BROWN & ROOT CONSTRUCTION CO. SOUTH TEXAS PROJECT and COMMANCHE PEAK. TWIN 1250 MEGAWATT NUCLEAR POWER ...
- 2018 Jun 23
Las Vegas, NV
... Construction Manager Association of America CERTIFICATIONS: Power Equipment ( Lowes) - forklift, order picker, manlift - ... Entech Engineering, P.C.: -September 2013 to January 2015 Resident Engineer for the Riverhead Wastewater treatmentt plant ...
- 2018 Jun 20
Las Vegas, NV
... Analyzers, Power Supplies, Signal Generators, Power Meters, Amplifiers and various types of antennas and RF electronics. ... Hands on experience repairing, calibrating and maintaining all industrial plant instrumentation in a variety of makes such ...
- 2018 Jun 13