Resume alert |
Resumes 41 - 50 of 73 |
Raipur, Chhattisgarh, India
... Experienced in operation of bulk material systems like conveyors of capacity of 1800 TPH wagon tipplers, stacker cum reclaimer, crusher,,tipper traully,plough discharger,coal sampling unit etc. Co-ordination, Planning and Scheduling. Dedicated to ...
- 2019 Mar 11
Raipur, Chhattisgarh, India
... I have worked as a Engineer (Operation & Maintenance) 200 TPH Coal Handling Plant & Coal Washery with M/s Sarda Energy & Minerals Ltd, Raigarh, Chhattisgarh from 01.10.2010 to 30.08.2015 Energetic, industrious & organized with an analytical & ...
- 2019 Jan 19
Chhattisgarh, India
... NAGPUR VOCATIONAL TRAINING 45 Days duration vocational training in Underground Coal Mine Rajgamar colliery incline 6/7 mines S.E.C.L. KORBA (C.G.) 45 Days duration vocational training in underground coal mines Damni mines SECL SOHAGPUR Area SHADOL ( ...
- 2019 Jan 11
Raipur, Chhattisgarh, India
... Working at CSIR-CIMFR (COUNCIL OF SCIENTIFIC & INDUSTRIAL RESEARCH-CENTRAL INSTITUTE OF MINING & FUEL RESEARCH) as PROJECT ASSISTENT under project tittle" STUDY OF QUALITY OF COAL FOR EFFICIENT UTILISATION IN POWER GENERATION " from 16 September ...
- 2019 Jan 05
Raipur, Chhattisgarh, India
... Work experience: June-2010 to August-2015 worked as an electrical commissioning engineer in SARDA ENERGY and MINERALS LTD.,Raigarh in 600 TPH CHP and coal benefication plant. Presently working in MSP steel and power Ltd.,Raigarh as an electrical ...
- 2018 Dec 15
Raipur, Chhattisgarh, India
... Auxiliaries, ESP, PRDS, Coal Handling Plant, Ash Handling Plant, Air Compressor, Fans and Pumps. Maintain consumption and production records. Maintain of fans (ID, FD & SA), blower, coal feeders, control valves and Mssv. Safety valves setting & ...
- 2018 Oct 03
Chhattisgarh, India
... Job Profile: Operations& Maintenance of All ash handling system in 1x500MW,2X300MW of coal based thermal power plant. Working as engineer & Desk Engineer in AHP Summary of Skills & Experience: Responsible for day to day reporting for all activities ...
- 2018 Sep 24
Raipur, Chhattisgarh, India
... (Power Plant Capacity -: 2 660MW-L&T MHI Turbine,Super creetical PF Boiler) PLANT DETAILS Super critical Boiler (pulverized coal) make L&T Main steam flow 2322 TPH PF boiler at 257 kg/cm2, 568 Celsius . multy cylinder 2nos. LP Turbine, 2 surface ...
- 2018 Sep 24
Raipur, Chhattisgarh, India
... Organisation(4) Imperial fastner Pvt ltd (Power Division) client was coal India ltd (2x10 MW condensing steam turbine,2x53 tph afbc boiler,Both boiler and Turbine make of Bhel) at Kathara in Bokaro(Jharkhand) from Dec2007 to Sep2008. Designation: ...
- 2018 Sep 06
Raipur, Chhattisgarh, India
... Feasible study,detail engineering, Procurment for Conversion of ESP Coal Mill & Raw Mill ESP into bag house. 8. Project planning and scheduling in MS project, 9. For producing Green Clinker project all Engineering & Procurement done to installation ...
- 2018 Aug 21