CURRICULUM VITAE
ADDRESS
ANAND KUMAR BURMAN
BalalJi Residency 1, Dhar Road
Manawar Distt. Dhar (M.P.)454446
Email:-*************@*****.*** (Contact No-090********/888-***-****)
CAREER OBJECTIVE:-
To accept challenging work and prove it with my ability and hardwork. Always ready to build up opportunity to upgrade my knowledge and skill.
Total Experience:- 10 Years
Currently Associated with Aditya Birla Group’s UltraTech Cement Ltd since 8.2 years, and presently working as Asst. Manager (Mechanical) in new Green Field plant of Ultratech Dhar Cement Works, Distt Dhar (M.P.)
Summary Of Major Activites:-
Sl. NO
Major Activities
Unit/Group
Job Activities
Duration
1.
Green Field Project 7200TPD
Dhar Cement works
1.Assigned job responsibility from post circuit from Clinker Silo extraction to Cement mill feeding circuit all equipment erection & commissioning.
2.Erection and commissioning of Loesche clinker mill 56.3+3,
3. Mahendra supplied Reject circuit and cement silo bucket elevator Erection and commissioning,
4.ement silo & flyash silo Top Roof girder erection and structural work.
5.Flyash silo extraction system to bulk loading
6.Preheater Top floor Structural and LH & RH Twin cyclone Erection.
7.Kiln feed & silo feed bucket elevator Erection & commissioning.
8.Thermax supplied Cement Mill baghouse erection & commissioned.
9.Cooler outlet duct erection & connectivity to WHRS
10.Project Material PR, PO Follow-up to supplier delivery status.
11.Contracor bill & supplier bill verification and certification.
12.Capex project closure as per guideline of short closing PR & PO.
4-Aug-2017 to till date
2.
Capex Project Execution & Commissinoing and
Modification work
UltraTech Cement Ltd, Unit of Rawan Cement Works, Rawan Distt Bhatapara-BalodaBazaar (C.G).
1.Planning & Budgeting for new capex project proposal through karomi software,
2. Capex Job monitoring,Review of capex PR & PO.
3.Involved in Cost reduction & energy saving capex, return based capex proposal and ensure for timely commissioned and timely captilisation of running capex.
4.KHD supplied Line 2 10000 TPD Girth Gear replacement in 15days.
5.FLS Ventomatic supplied drawing Wagon loading
6.machine 8 nos Up-gradation.
7. Feasible study,detail engineering, Procurment for Conversion of ESP Coal Mill & Raw Mill ESP into bag house.
8. Project planning and scheduling in MS project,
9. For producing Green Clinker project all Engineering & Procurement done to installation slag feeding system in calciner.
10.Used Scrap bucket elevator from capacity 250tph to 20 tph converted and commissioned successfully.
11. Hydraulic Grab bucket system installation in line 2.
12.18MT Raw mill Fan impellar replacement done
13.Modiifcation of raw mill outlet duct.
14.Bowser feeding and unloading feeding system installed for transfer raw meal from raw mill 1 to line I silo.
15.Ball Mill Shell Liner and Diphram Replacement work in 14days.
16.Hirmi cement preheater Cyclone upgradation, & IKN cooler kids area & CFO modification work and Burner upgradation completed.
17. Engineering and procurement of AFR feeding system through bucket elevator and Grab bucket.
18.Modification as per power saving and cost saving project.
19.Reclaimer Overhauling work.
20.Roller Press, cement Mill and Slagmill roller replacement.
21. Rawmill Airslide replaced by installation of pipe.
22.Fresh feed Belt conveyor inclination work, 250tph PSC silo Bucket elevator Erection,
23. Telescopic Truck Tailor erection,
24.Upgradation of Wagon Loading m/c, Belt conveyor Takeup Modification from HGTU to VGTU.
25.Line I Peb Coal shed Erection.
26. Coal fine transfer project from Line 2 to Line I.
27.Truck Trippler Erection & Commissioning,
28.UV plant Erection, HAG Burner replaced in slag mill.
25 July 2013- 3-Aug-2017
3.
Brown Field Project 10000TPD
UltraTech Cement Rawan
For optimization of plant Modification in Chutes & venting pipe bagfilter suction line, pipe Line dedusting system changed, for maintenance point of view required platform installation in preheater raw mill for Equipment protection Shed Erection Expansion of belt tph, Girth gear replacement.
25 July 2013- 3-Aug-2017
4.
Capex Project Execution & Commissinoing
UltraTech Cement Ltd, Unit of VikramCement Works, Khor (M.P.)
1.Capex Project Monitoring, estimation of new project, enquiry and Feasible Study of upcoming project. Coordination with consultant and supplier.
2.ESP Modification, Cyclone Modification work
3. Material Lift/passenger lift installation, Wood shredding machine installation
4. Additive & Gypsum Belt conveyor Installation.
5.250tph Stacker & 350 tphReclaimer installation.
8.Kiln shell & Tyre replacement.
9.VRM Refurbishment.
19 July 2010 - 24 July 2013
5.
Green Field
Project 6000TPD
KJS CEMENT LTD
MAIHAR (M.P.)
1.Structural,Duct Fabrication & Erection
2.Equipment Installation & Commissinoing
3.Billing & Reconcilation BOQ of steel
1 Oct 2009 –
23 June 2010
6.
Expansion of Project RK-4 Kiln & Maintenance work.
M/s Katni Minerals Pvt.Ltd Purena (M.P)
1.Kiln & cooler Erection & commissioning
2.Imapct mill maintenance
3.Cement Mill Erection, fixing of liner, Duct fabrication & structural erection.
3 Nov 2008 - 30 Sep 2009
ACADEMIC QUALIFICATION
SLNO
Qualification Details
Subject
Board/University
Marks Obtained
1.
Graduation
B.E (Mechanical)
Rajeev Gandhi University Bhopal (M.P) in 2004-2008
1st Division 72.78%
2
Intermediate
Higher-Secondary Maths
A.C.C H.S.S.E. Kymore (MP) 2003-2004
1st Division, 83.4%
3.
Matriculation
High School (All Subject)
A.C.C H.S.S.E. Kymore (MP) 2001-2002
1st Division, 83.5%
COMPUTER SKILL
Drawing work:- :- AUTO-CAD(2005-2010) (for General Drawing modification, editing, views)
Professional Work:-SAP-Technology :-( MM Module, PS Module, Issue pass, Gatepass, Material Indent Service PR, Service Entry sheet, Service PO Notification, Report-generation,)
MS Project 2010:-(Prepared bar chart, Tracking Project, Update Project, Project planning schedule, time period, Monitoring Work etc.)
Operating System :- (Windows Vista Home Basic, Windows 2000, Windows XP)
Office Suit:- (Microsoft office World 2007&2003, Microsoft office Excel 2007&2003, Microsoft office power Point 2007&2003)
Training in Plant
“Operation & Maintenance of Gearboxes and Alignment “from Regional Training Center JK Cement Works Nimbahera Rajasthan.(2010-2011)
“FIRST AID” Through Jaipur Hospital in VCW Khor (M.P.) (2010-2011)
All Safety training with Du-Pont Standard has been successfully completed. (2010-2011)
Plant Training
Have successfully completed an Industrial training with ACC Kymore Cement Works, Kymore (M.P) - 30 days (2006-07)
The Diesel Traction Training Center (Diesel Loco Shed), N.K.J, Katni (M.P) - 15 days (2006-07)
ACHIEVEMENT:
1.NDT Certified Level 1
2.AUTO-CAD with “A”CERTIFICATE (AutoCAD 2000, AutoCAD 2004, AutoCAD2I)
3.N.C.C. “B” CERTIFICATE (2006)
PERSONAL DETAILS:
Name
Anand Kumar Burman
Father’s Name
Shri Beni Prasad Burman
Father’s Occupation
Employee of A.C.C. Kymore Cement Works, (Hospital Deptt.)
Mother’s Name
Smt. Shakuntala Devi
Mother’s Occupation
House Wife
Marital Status
Married
Date of Birth
1st July 1986
Sex
Male
Languages Known
English and Hindi
Nationality
Indian
Passport No
J2419409
Notice Period -3 Months
DECLARATION
I hereby declare that all the above-furnished information is true to best of my knowledge and belief.
DATE: 17.08.2018
(Anand Kumar Burman) PLACE: Manawar (Project & Development)