... 17, 2019 QA/QC Communication Inspector (PID) – Saudi Aramco General Inspection Services (GIS) National Inspection & Technical Testing Co., Ltd. Jubail 31961 KSA SAUDI ARAMCO – PROJECT INSPECTION DIVISION / GENERAL INSPECTION SERVICES (FAHSS – TUV ...
- 2023 Jun 25
Caloocan, Philippines
... Project Performed Loop checking, Continuity check, Pre-Commissioning/Commissioning 2x103megawatts coal fired power plant, GIS 13.8kv Gas Insulated Switchgear Hyosung, 6.9MV, Switchgear 48LV Switchgear LS, GCB Generator Circuit Breaker Areva, UPS ...
- 2023 Jun 11
Manila, Philippines
... materials resource investigation and estimation • Soil profiling and borehole logging • Factual reporting • Performing GIS works and analysis (ArcMap, QGIS, Global Mapper) PROFESSIONAL EXPERIENCE Engineering and Development Corporation of the ...
- 2023 Apr 11
Quezon City, Philippines
... Usage of tools such as : Manual Parcel, Microsoft Excel, Arc Map, and Arc Gis. Concentrix Bridgetowne Quezon City Customer Service Representative October 2021 - April 2022 Provide data regarding the health insurance policy of a certain member to a ...
- 2023 Mar 12
Philippines
... (2007) ●Seminar/Workshop on 3D Laser Scanning, Computer-Aided Earthwork Volume Computation & GIS Standard for As-built Survey (Doha Qatar) ●Seminar training for Cadastral Survey & Geographical Information System (GIS) Doha Qatar CAREER PROFILE: ...
- 2023 Feb 08
Manila, Philippines
... September 26, 2011- December 7, 2011 -ENHANCED CLUP PREPARATION TRAINING WITH INTRODUCTION TO GIS MAPPING SEPTEMBER 12-16 AT HAVEN OF FUN BEACH RESORT -TRAINING ON DRR/CCA ENHANCED CLUP PREPARATION November 21-25 2016 Mondejares Puertes Resort Brgy. ...
- 2022 Dec 05
San Rafael, Bulacan, Philippines
... with conveying system Condensing turbine generator system Black start generator system Effluent water treatment system Cooling tower 3.Ras Al Khair Power Plant – 2012- 2018 380KV GIS Substation and Gantry structure 2400 Combined Cycle Power plant ; ...
- 2022 Nov 29
Quezon City, Philippines
... (ECA), inclusive of baseline studies & geographic information systems/global positioning system (GIS/GPS)-anchored thematic & topographic mapping inputs, culminating in approval/issuance of corresponding environmental compliance certificate (ECC); ...
- 2022 Jun 20
Bagbaguin, Caloocan, Philippines
... 60,174,337.54- Project Completed 6.Construction of a New 132/13.8KV indoor GIS Type Sub Station -Arar, K.S.A Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double bus- single breaker configuration in Arar area. The new ...
- 2021 Dec 09
Quezon City, Philippines
... quality work check and general monitoring PROJECTS UNDERTAKEN/ COMPLETED: -400KV GIS Bldg, Steam Turbine Bldg, Main Elect’l Bldg, 2 unitsLocal Elect’l Bldgs and Turbine foundations 5.February 21 to August 2, 2007 –(24-hr.operation) FIL-GARTE CONST. ...