COMPREHENSIVE RESUME
OF
ENGR. CARMELO P. MOSQUEDA
Position Applied for : Planning Manager
Permanent Address
Lot 21-C,Block 14,Road 2 Congress Village 1421 North Caloocan City, Philippines
Tel. No. +63-2-84418582
Cell Phone No.+63-938******* ( Philippines)
Cell Phone No. +966-********* (Saudi Arabia)
E-mail Address
***************@*****.***
YouTube Channel : youtube.com/channel/UCU2c3fQSQ95hclUGOWiVBSw
Degree of Professional Engineer- Saudi Council of Engineer (Reg.No.170618
SPECIAL SKILLED
Supervision, Monitoring and Implementation of Plans for Oil and Gas Project,Civil Works project such as;
High Rise Building, Residential Condominium, Land Development Project, Water Lines, Drainage &
Sanitary, Irrigation System, Roads, Sub-Station and Overhead Transmission Lines
Competent in Primavera Project Management (P6 version 17)
SAP Program-Knowledge in Preparation of WBS Structure in SAP Program
Knowledge in Structural Design and Analysis using STAAD PRO
Knowledge in Designed Drawing and Plans Using AUTO-CAD
Competent Computer Proficiency in MS Word, MS Excel, Powerpoint and Microsoft Project
EMPLOYMENT RECORD
I.Al Osais Contracting Co.Ltd.
King Fahd Road P.O.Box1083,Dammam 31431,Al Faisaliyah,Kingdom of Saudi Arabia
Tel.No.+966 (13)-8196000; Fax No.+966(13)-8113334
www.alosais.com
Name of Employer : Mr. Yousuf Ghurm Al-Ghandi
Board Member
Al-Osais Contracting Co.
Position : PLANNING MANAGER/COST CONTROL MANAGER
Date of Engagement : October,10,2009- December 15,2020
Description of Project
1.Jazan Refinery & Terminal Project Pkg# 12 (SMP: Pkg A+C+D / E&I: Area B+D)
Scope of Work : Structural,Mechanical,Piping,Electrical and Instrumentation Work
Project Cost : S.R. 645,550,956-Project Completed
Owner : Saudi Aramco
Prime Contractor : JGC Arabia Limited
Location : Jazan Industry Area,KSA
2.Site Development of Mutrafiah, Stage 2 Project - 220 Hectare-Jubail K.S.A
Site Development of 220 Hectare commercial and residential area incl. Asphalt Roads,
Electrical Power Lines, Telecommunication System, Irrigation System, Potable
Water System, Storm Drainage, Street Light, Traffic Light & Landscape
Client : Royal Commission for Jubail & Yanbu
Project Cost : S.R. 253,897,298.77-Project Completed
3.Underground Pipe Installation- Jubail II Industrial City K.S.A
Installation of Underground FRP Pipe with Firewater Valves and Chambers, Stainless Steel
riser incl. hydrant, Drainage Culvert and Road Crossing, Electrical and Telecom Ducts.
Client : Sadara Chemical Company - Jubail II Industrial City
Saudi Aramco and Flour Com. Ltd.
Project Cost : S.R. 63,639,448.37-Project Completed
4.Upgrading Hout On-Shore Crude Facilities.- Al-Khafji-Saudi Arabia
Construction of Office Building, Chemical Shelter, Pipe Rack, Steel Structural Works,
Coating System, Electrical &Instrumentation Cable,. Asphalt Road Works
Client : Al-Khafji Joint Operation, Aramco Gulf Operation Com. Ltd
Kuwait Gulf Oil Company. Ltd.
Project Cost : S.R. 50,139,188.50- Project Completed
5.Reinforcement of Community Irrigation System Phase II Project - Jubail K.S.A
Installation of 20 KM Irrigation Pipeline using 1.2m dia. Fiber Glass Reinforce Pipe (FRP)
including installation of Underground Pipe using Boring Mtd. (Pipe Jacking).Construction of
Valve Chambers, Concrete Encasement and Instrumentation.
Client : Royal Commission for Jubail & Yanbu
Project Cost : S.R. 60,174,337.54- Project Completed
6.Construction of a New 132/13.8KV indoor GIS Type Sub Station -Arar, K.S.A
Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double bus-
single breaker configuration in Arar area. The new substation shall be equipped with
Substation Automation System (SAS) and will be remotely controlled from the Company
Power Control Center (PCC) through SCADA system, Communication system and gateway.
Extension of existing 132 kV GIS and addition of protection, metering, annunciation,SCADA
& communication systems at Arar Power Plant
Client : Ministry of Higher Education K.S.A
Project Cost : S.R. 123,227,479.00- Project In-Progress
7.Construction of a New 132/33 kV Substation, in Al-Jowa K.S.A
One (1) no.132kV SF6 Gas Insulated Switchgear (GIS) with twelve (12)nos. 132kV GIS
Circuit Breakers and associated equipment, two (2) nos.132/33kV, 100MVA, Power
Transformers, One (1) 33kV Switchgear with fifteen (15) nos.33kV Switchgear circuit
breaker panels, two (2) nos 33kV, 10 MVAR Capacitor Bank & associated equipment,
Protection, Control, Auxiliary Equipment, Cables and Civil Work .The substation will be with
Substation Automation System (SAS) & will be remotely controlled through SCADA system
through Gateway & fiber optic channels from the Central Regional Control Center (CRCC).
Client : Saudi Electric Company-National Grid Central Operating Area
Project Cost : S.R. 84,240,000.00-Project In-Progress
8.Construction of a new 132/13.8 kV Substation, in Dhahiyah K.S.A.
Area One (1)no.132kV SF6 Gas Insulated Switchgear (GIS) with ten(10) nos.132kV GIS
Circuit Breakers and associated equipment, three (3) nos.132/13.8kV, 67MVA, Power
Transformers, One (1) 13.8kV Switchgear with forty four (44) nos.13.8kV Switchgear circuit
breaker panels, three (3) nos. 13.8kV, 7 MVAR Capacitor Bank & associated equipment,
Protection, Control, Auxiliary Equipment, Cables and Civil Work. The substation will be with
Substation Automation System (SAS) & will be remotely controlled through SCADA system
through Gateway &fiber optic channels from the Central Regional Control Center (CRCC).
Client : Saudi Electric Company-National Grid Central Operating Area
Project Cost : S.R. 91,415,000.00-Project In-Progress
9.115kV Double Circuit OHTL from Jubail to Al-Dhahiyah S/S- Jubail K.S.A.
This project require execution of 115 kV double circuit, three phase, vertical configuration,
approximately 35.0 KM. long, overhead transmission line on company design of
latticed steel towers and specially designed steel monopoles using two (2)-795
KCMIL “DRAKE”, 26/7 ACSR/AW conductor per phase from the proposed
380/230/115kV Jubail residential BSP to Proposed Al-Dhahyiah 115/13.8 kV S/S. The entire
overhead transmission line shall be shielded with two (2) Composite Optical Overhead
Ground Wire (OPGW)
Client : Saudi Electric Company-National Grid Eastern Operating Area
Project Cost : S.R. 65,320,000.00-Project In-Progress
Description of Work
1.Be able to develop construction baseline program for large-scale Construction Projects based on contract agreement, engineering design and scope of works. Using Primavera Project Management (P6).Create Work Breakdown Structure (WBS) in SAP Program
2. Monitor actual project executions and production schedules against the master plan
3.Monitor and Update all Purchase Order and Site Expense of the Project and see to it that the actual cost and expenses are not exceeding the required budgeted cost of the project and issue variance reports to Project Manager on monthly basis
4.Issue Monthly Cost Control Reports to Project Managers and Finance Department regarding Cash Flow (In/Out)
5.Coordinate with other project teams to establish detailed schedules, work plan, critical activities based on key milestone dates as specified in the contract
6.Prepare bi-weekly status report of the project for submission to the client, which shows the present percent actual work completed against the baseline percent target .Highlight critical activities requiring particular attention and discuss with project teams to identify mitigating and recovery measures. Follow-up material & equipment critically needed, manpower status and problem encountered at site.
7.Liaise and coordinate with regulatory bodies, clients, consultants, contractors, and internal stakeholders to meet essential requirements including troubleshooting for all project details and operational issues in order to improve overall planning efficiency
8.Ensure effective delegation and optimum utilization of resources to achieve project milestones and within approved budgets
9.Attend bi-weekly and monthly coordination meeting with the client and higher management.
10.Monitor progress of work on site on a daily basis and also to create weekly, monthly and 90 days look ahead schedule program.
11.Maintain & update all Schedules, collect actual data, evaluate dates to completion and project delays by effective monitoring of actual progress
12.Maintain and monitor the proper distribution of resources such as manpower, materials & equipment during various project execution phases in order to avoid wasted of materials and repetition of work.
13.Maintain records for all significant events relevant to contractual claims/obligations.
II.Ahmed Mansoor Al A’Ali Co (AMA)
PO Box 778, Manama, Kingdom of Bahrain
Tel 009**-**-******; Fax 009**-**-******
www.alaali.com
Name of Employer: Mr. Bryan Jones
General Manager for Construction
Position : PROJECT TECHNICAL AND PLANNING MANAGER,CIVILS
Date of Engagement : June 30,2007- August 30,2009
Description of Project
1.East Riffa Sewerage Project-Kingdom of Bharain
Client : Ministry of Electricity and Water
Planning and Studies Directorate, Kingdom of Bahrain
Project Cost : B.D. 3,300,000.00-Project Completed
2.Construction of Water Transmission Pipeline to Tubli Isa Town & West Riffa
Client : Ministry of Electricity and Water
Planning and Studies Directorate, Kingdom of Bahrain
Project Cost : B.D. 2,567,853.00- Project Completed
Description of Work :
The person will report to the Project Manager and will, amongst other things:
1.Produce the contract programmes and update as required; produce method statements; identify resources and produce resource histograms. Using Primavera Project Planner (P3-P6)
2.Monitor project executions and production schedules against the master plan
3.Highlight critical activities requiring particular attention and discuss with project teams to identify mitigating and recovery measures
4.Coordinate closely with cross functional groups in troubleshooting for all project details and operational issues, and improve overall planning efficiency
5.Compile, analyze and prepare periodic reports for management, owner and relevant departments
6.Liaise with project teams to establish detailed schedules, work plan, critical activities based on key milestone dates as specified in the contract
7.Generate monthly progress S-curve for each section including overall, engineering, procurement, construction and commissioning
8.Produce weekly and monthly progress reports; liaise between estimator, quantity surveyor and cost clerk to build data into the programmes for cost control and output monitoring.
9.Monitor and report the production outputs of labour and equipment.
10.Ensure that contract and company requirements in respect of QA/QC and EHS are met. The QA/QC Engineers will report to the Technical and Planning Manager
11.Ensure that reports are produced on time in respect of progress and production.
12.Identify requisition resources and materials on time and obtain approvals from the project consultant for the materials and sub-contractors.
13.Deal with all technical and engineering matters related to the projects.
III.Ministry Of Agriculture And Water
Al-Hassa Irrigation And Drainage Authority Hofuf, Kingdom of Saudi Arabia
Tel .No. (009**-*-*******
www.hida.gov.sa
Name of Employer : Engr. Khaled Al Sarawi
Director for Operation
Position : Project Engineer/Planning & Scheduling Engr.
Date of Engagement : November 08,2001 to May 26,2007
Award Received : Outstanding Employee for the year 2002-2003
Description of Project
1.Repair and Maintenance of Irrigation Line of the Whole Eastern Province of Al-Hassa K.S.A
2.Design and Installation of FRP Pipe and Fittings of Water Lines for Irrigation System
3.Design and Construction of Government Office Building
4.Design and Construction of Pump Station and Warehouse
Description of Works :
1.Responsible for project management including coordination, supervision & monitor the progress of the Project work on site in all aspect of construction.
2.Supervise and Manage Civil & Structural Projects, make sure that the work progress conforms to the plans and specifications.
3.Report problems occurring at project site; supervise and negotiate changes to resolve structural design
Conflict.
4.Prepares reports and documents of project activities and data.
5.Support the Operation Manager to ensure smooth project implementation, site progress monitoring and management until successfully hand over of projects
6. Involve in site execution of work, site supervision/coordination, conduct site rounds and maintenance reports
7.Responsible for design, installation and commissioning activities
8.Assist in ensuring that the design and installation are completed on time and to the satisfaction in accordance to the contract performance requirement.
9.Conduct site survey/investigation and put up reports whenever required.
10.To put up cost estimation and specification whenever required.
11.Preparation of progress reports, update of project status and attend bi-weekly meeting.
12.Prepare and Design Plans using Structural Design Analysis (Staad Pro) & AutoCad 2007
13.Prepare Work Scheduled using Primavera Project Planner 3.0
IV. Advanced Real Estate Development Corporation
3803 Cuenca cor. Dayap St. Palanan Makati City,Philippines
Tel. No. (006*-*-***-****,834-2855,833-0031
Name of Employer : Mr. Roy Aceja Uy
Executive Vice President
Position : Senior Project Engineer
Date of Engagement : February 15,1996- October 31,2001
Description of Project
1.Days Hotel
A Twelve Storey-Three Star Hotel Building with a Total Floor area of 7,000 sq. m
with a Shopping Complex of 3,000 sq .m-Located at KM 31 Aguinaldo Hi-Way,
,Dasmarinas Cavite, Philippines.
Client/Owner : Advanced Real Estate Dev. Corporation
2.Pine Groove Vacation Homes
A High-End Exclusive Subdivision with a Land Area of 10 Hectare with a 150 units First
Class Vacation Homes-Located at Barangay Dontogan Baguio City, Philippines
Client/Owner : Advanced Real Estate Dev. Corporation
3.City State Tower
Construction of 22 Storey High Rise Office Building
Shaw Boulevard corner Orambo Drive, Pasig City, Philippines
Client/Owner : City State Company
Project Cost : P 898,000,000.00 - Project Completed
Description of Works
1.Prepare Construction Contract & Assist the Executive Vice President on Technical aspect of Construction.
2.Prepare Plan and Specification for land Development Project in Baguio City project
3.Daily Site Inspection of On-Going project
4.Evaluate Contractor Billing and Accomplishment.
5.To monitor, inspect and supervise on-going projects in accordance with approved plans and specification.
6.Prepare Alternative Designs and Solutions for Construction
7.Monitor Engineering, Building, Detailed and Construction Drawings
8.Liaise with Government Authorities on their Requirements for necessary work permits
9.Supervise and Manage Civil & Structural Projects
10.Reads and reviews project blueprints plans and structural specifications.
11.Coordinate to owner and design consultant regarding discrepancy in designed drawing to resolve structural design conflict.
12.Prepares progress reports and documents project activities and data.
13.Make sure that the safety rules and procedure are followed in project site.
V.Extra Ordinary Development Corporation
7th Flr.Metrobank Bldg.,Gil Puyat Avenue,Makati City,Philippines
Tel.No.(006*-*-***-**** to 02/ 815-1128/ 815-1184/ 818-5885/ 818-5874
Name of Employer : Engr Frank Hsieh
E.V.P.for Construction
Date of Engagement : October 14,1991- January 30,1996
Position
1.Project Engineer –Land Development : Augus,.20,1995- January 30,1996
2.Senior Site Inspector-Turn Over Dept. : April 08,1995 – August 19,1995
3.Senior Site Inspector – Housing Dept. : September 02,1992 - April 07,1995
4.Senior Material Engineer : October 14,1991 – September 01,1992
Completed Projects Location Land Are / No.of Units
Golden City Sta.Rosa Sta.Rosa Laguna,Philippines 45 Hectares 3,088 Units
Golden City Dasmarinas I Dasmarinas Cavite,Philippines 14 Hectares 2,461 Units
Diamond Village Dasmarinas Cavite,Philippines 10 Hectares 750 Units
Golden City Dasmarinas III Dasmarinas Cavite,Philippines 11 Hectares 1,800 Units
Mabuhay Homes 2000 Dasmarinas Cavite,Philippines 10 Hectares 1,679 Units
Description of Works
1.Conduct daily site inspection and supervision to check if work done is in accordance with approved plans and specifications of the project such as; housing project, water distribution system, road concreting and base preparation, dredging and excavation,community facilities and recreation.
2.Evaluate Contractor Billing based on actual accomplishment and amount of work done.
3.Prepare Accomplishment Report to be submitted to main office indicating daily activities, manpower & equipment, materials critically needed, problems encounters and proposed solution,weather report which could be used as information in evaluating for the request of extension.
4.Checking if safety measures are observed at construction site.
5.Prepare project estimate, revision of plan, cost cutting and time reduction if needed.
6.Evaluate and recommend contractor based on their performances.
VI.Moor Construction and Industrial Supply Inc.,
Sta. Cruz, Manila, Philippines
Position : Purchaser and Sales Representative
Date of Engagement : May 03,1990 – September 30,1991
Description of Works
1.To purchase construction materials and general hardware required by the customer.
2.Continually seeks opportunities to increase customer satisfaction and deepen client relationship.
PERSONAL DATA
Name
:
Engr. Carmelo P. Mosqueda
Sex
:
Male
Date of Birth
:
August 22,1966
Nationality
:
Filipino
Place of Birth
:
Manila
Weight
:
68 kgs.
Religion
:
Roman Catholic
Height
:
5 ‘ 3”
Civil Status
:
Married
Name of Spouse
:
Imelda L. Mosqueda
Occupation
:
Registered Nurse
Name of Children
:
Camille L. Mosqueda
Date of Birth
:
November 29,1996
:
Mark Lester L. Mosqueda
Date of Birth
:
May 08,1999
EDUCATIONAL BACKGROUND
Degree of Professional Engineer
:
Saudi Council of Engineer (Reg.No.170618)
College
:
Far Eastern University,Manila Philippines
Degree
:
Bachelor of Science in Civil Engineering
Year Graduated
:
March 1988
Examination Taken
:
Civil Engineering Board Examination
Result
:
PASSED
Professional License (PRC)
:
Professional Regulation Commission (Reg. No.0077398)
Secondary Education
:
Quezon City Academy, Quezon City Philippines
Year Graduated
:
March 1983
Primary Education
:
Sto. Cristo Elementary School, Quezon City Philippines
Year Graduated
:
March 1979
SEMINARS / SHORT COURSES ATTENDED
Computer-Aided Engineering in Extended Three Dimentional Analysis of Building System-ETABS 2016
ICAD Training Center – Sampaloc,Manila, Philippines
Construction Project Management – Primavera P6
CAD Vision – C.M. Recto Street,Manila, Philippines
Computer Aided Project Management – Primavera Project Planner P3
CAD Vision – C.M. Recto Street Manila, Philippines
Auto CAD for Professional
Crescent Technology – Sampaloc Manila, Philippines
Computer Aided Structural Analysis and Design using - STAAD Pro.
CAD Vision – C.M. Recto Street Manila, Philippines
Seminar on Earthquake Engineering
Philippine Institute of Civil Engineer- Diliman Quezon City. Philippines
CHARACTER REFERENCES
Engr. Ahmad Abu Rob - Civil Manager for Al Osais Power Division
Al-Osais Contracting Co.Ltd.
P.O Box 1083,Dammam 31431,Kingdom of Saudi Arabia
Tel. No. +966(13)-8196249
Mr. Jamil Katrib - General Manager for Al Osais MCM
Al-Osais MCM Contracting Co. Ltd.
P.O.Box 1083,Dammam 31431,Kingdom of Saudi Arabia
Tel.No. +966(13)-8116372
Engr. Khalid Al Sarawi - Director General for Operation
Al Hassa Irrigation and Drainage Authority
Al Hofuf, Kingdom of Saudi Arabia
Tel. No. +966(13)-530093
Engr. Frank Hsieh - Exec. Vice President for Construction
Extra Ordinary Development Corporation
7th Floor Metrobank Building Gil Puyat Makati City,Philippines
Tel.No. +63(2)-8158301
I hereby certify that the above information is true and correct to the best of my knowledge.
ENGR. CARMELO P. MOSQUEDA