CURRICULUM VITAE
PERSONAL DATA:
Name : OSIAS P. GOZE
Nickname : Ogie
Address : ** **. ****** **., **** Juana, Holy Spirit, Quezon City
Date of Birth : September 26, 1962
Place of Birth : Buguey, Cagayan, Philippines
Height : 5’ 5”
Weight : 120 lbs.
Civil Status : Married
Cell No.# : 093********
EDUCATIONAL BACKGROUND:
COLLEGE : National University, Manila, Philippines
Date Graduated : April 1983
Course : BS in Civil Engineering
SECONDARY : Cagayan High School
Date Graduatd : 1977
PRIMARY : Buguey Elementary School
Date Graduated : 1973
SEMINARS ATTENDED: PROPONENT YEAR
1. Town Planning & Zoning National Housing Authority 1983
2. Construction Supervision Department of Public Works and
Highways 1984
4. Team Building Workshop- Course on Organizational Change
Excellence & High Performance Consultants 1995
CHARACTER REFERENCES:
Engr. Adriano C. Maglunog Valenzuela City
Contact No#. 292-4719
Dr. Rodolfo Talag Mandaluyong City
Contact No#. 532-0023
Arch. Jesus C. Marcelo Parañaque City
Contact No#. 826-5712
A. CONSTRUCTION WORK EXPERIENCE of OSIAS P. GOZE:
FROM PRESENT BACKWARDS
FROM-TO POSITION COMPANY ADDRESS REASON FOR
LEAVING
August 2016 Project Manager JC Electrofields, Inc. 2129 Lamesa St. N.A.
To the Present Ugong, Valenzuela City Awaiting next
project
April 2014 Project Manager BN Project Technique 8 Cleveland St Finished
May 2016 (Proj.Management Firm) Parkwood Greens assigned
Exec. Village Projects
Pasig Cty
September 2010 Proj Engineer Firstbuilders Const. 1902-A P.S.E. Tower Finished
February 2014 Corporation Ortigas Center assigned
Pasig Cty Projects
November 2007 Building Engineer Hyundai Eng’g & Const. Ras Laffan Ind’l Finished
November 2009 Co., Ltd. City, Qatar Contract
February 2007 – Project Manager Fil-Garte Const. 3rd Floor Quadrillon Project
August 2007 & Dev’t Corp. Mansion, N. Domingo Completion
(24-hrs. operation) cor. M. Paterno Sts. Contract
San Juan, M.M.
September 2003– Const. Manager Mando Winia West Ave. cor. Finished
January 2007 Const. Corp. Martinez St. Projects.
(Local Korean Company) Quezon City
September 1998 – Construction//Craft Flour Daniel Light Industry & Fin. Contract/
December 1999 Superintendent I Pacific, Inc. Science Park, Fin. Project
Cabuyao, Laguna
January 1996 – Steel Structure Samsung Eng’g Mailiao, Taiwan Finished
January 1998 Supervisor & Const. Co.,Ltd. Republic. of China Contract
February1994 – Proj. Engineer Grand Plaza Hotel Corp 10th Flr Heritage Hotel Finished
August 1995 (Owner’s Management Team) Roxas Blvd, Paay Cty Project
February 1991 – Project Manager To Multiwood Inter #14 M.A. Roxas St. Finished
May 1993 Asst. Operations Manager National, Inc. Calumpang, Marikina Projects
City
March 1989 – Project Manager Constant 4th Flr. Heart Bldg. Finished
December 1990 Builders & Bagtikan St., Makati Projects
Dev’t. Corp. City
January 1987 – Construction Alkaldi Riyadh, Saudi Arabia Finished
January 1989 Superintendent Establishment Contract
for Contracting
September 1983 – Estimator/ Von Faberekt 73 San Francisco Resigned to
March 1986 Poj. Engineer Inc. Mandaluyong City Saudi Arabia
B. WORK HISTORY, OTHER FUNCTIONS, DESCRIPTION OF DUTIES & RESPONSIBILITIES
(From most recent backwards)
1.August 2016 to the Present- JC ELECTROFIELD POWER SYTEMS, INC.
Position: Project-manager
DESCRIPTION OF DUTIES & RESPONSIBILITIES
--General Monitoring & management of the project from start to finish
_ Proper delegation of works to site engineers & supervisors
_ Calls weekly coordination meetings & other emergency meetings when necessary
_ Inspects works to conform to established procedures and standards, schedules works, prepares
inspection notification schedules to the Q.C. inspectors and to the Consultants
_ Prepares periodic work progress, see to it that workers comply with standard safety regulations
--Checks proper execution of works, progress of works, sequence & coordination of works, quality work
Check timely completion of Milestones geared towards completion of the whole project in accordance with
the required time table (Time-meeting schedules)
PROJECTS UNDERTAKEN/COMPLETED
5MW Solar Power plant, Brgy. Isla, Valenzuela city, 16MW Solar Power plant, Brgy. Tagalag,
Valenzuela city, Substation Control bldg.., Germosa, Bataan and 120MW Solar Power plant, Brgy. San
Andres, Alaminos, Laguna
2.Aprl 2014 to May 2016- BNP PROJECT TECHNIK (Project Management Firm)
Position : Project Manager
DESCRPTON OF DUTES & RESPONSBLTES
- Presides over weekly coordination meetings and calls for special meetings in between weekly coordination
meetings when necessary
-1nspecton of works to check any mistakes/discrepancies ; re-bars, forms, dimensions etc; 1sssues S.1. (Site
Instruction) to rectify all such mistakes & discrepancies to avoid accumulation of all/any discrepancies; issues
S. 1. for change orders, changes, additive & deductive works; Request the Designers/consultants RFI
(Request For Information) for clarification of design conflict, design changes, redesign, details etc.; Presides
over coordinaton meetings, calls for special meetings with contractors & its subcontractors when necessary;
-Monitors work accomplishments, requires contractors to submit catch-up plan and schedules, reviews such
schedules, evaluates, recommends approach on meeting time schedules and evaluates billing of contractors
PROJECTS UNDERTAKEN/ COMPLETED
5-storey 45 Classrooms school building & 3-storey Student center building
3.September 2010 to February 2014---First Builders Const. Corporation
Position: Project Engineer
DESCRIPTION OF DUTIES & RESPONSIBILITIES:
_ Inspects works to conform to established procedures and standards, schedules works, prepares
Manpower schedule,materials schedules & material requisitions
_ Prepares monthly work progress, see to it that workers comply with standard safety regulations
--Checks proper execution of works, progress of works, coordination of works, quality work check
and general monitoring
PROJECTS UNDERTAKEN/ COMPLETED :
-3-Storey 4-door townhouse w/ attic & High-end Residential house in Ayala Alabang Village, High end
Residential Proj. Valle Verde 5 & Condo Unit, Seibu Tower Global City, Taguig
4.November 2007 to October 2009---Hyundai Eng’g & Const.,Co., Ltd.
Position: Building Engineer
DESCRIPTION OF DUTIES & RESPONSIBILITIES
_ Inspects works to conform to established procedures and standards, schedules works, prepares
inspection notification schedules to the Q.C. inspectors and to the Consultants
_ Prepares monthly work permits, see to it that workers comply with standard safety regulations
--Checks proper execution of works, progress of works, coordination of works, quality work check
and general monitoring
PROJECTS UNDERTAKEN/ COMPLETED:
-400KV GIS Bldg, Steam Turbine Bldg, Main Elect’l Bldg, 2 unitsLocal Elect’l Bldgs and Turbine
foundations
5.February 21 to August 2, 2007 –(24-hr.operation) FIL-GARTE CONST. & DEV’T. CORP.
Position: Project Manager
DUTIES & RESPONSIBILITIES
-Responsible for the general management of the project up to completion period, from planning, implementation/execution, delivery and closing out of the project .
-Represents the project/company to the owner and consultants, attends to coordination meetings, acts on important decision for the project.
-Assigns work areas and schedules to the site engineers, sees to it that work activities and executions are made
on time; calls for periodic coordination meetings with the Project Staff; Acts on technical as well as
administrative concerns in the project.
-Laiase/confers with the Safety manager to ensure safety nets before start, up to the completion of works
-Safeguard the profitability and integrity of the project and deals with Subcontractors.
Assigns Deputy Project Manager to liaise with all concerned Staff to:
-Check/monitor updating of material stocks to ensure materials availability in time of usage,
checks /monitors status of all equipments to ensure usage of equipments at all times needed.
-Checks/ monitors fuel, oil and other incidental needs.
-Checks manpower loadings to conform to target schedules.
PROJECT UNDERTAKEN/COMPLETED: Analog devices Bldg., (American Co.} Gateway
Business Park, Gen.Trias Cavite
6.September 2003 to January 2007 – MANDO WINIA CONST. CORPORATION
Position: Construction Manager
DUTIES & RESPONSIBILITIES
-Work with the management team in sourcing out projects for design, construction and management.
-Participated in bids of significant projects.
-Working on feasibilities and planning of construction projects.
-In-charge of the construction/ infrastructure expansion of the export company, prepares program
of works, schedules manpower to jobsites, quantity take-off of materials.
-Requirements for material purchase and schedule of timely delivery to jobsites.
Assigns Site engineer/ Foreman to project sites & monitors/general supervision of works
PROJECTS UNDERTAKEN/ COMPPLETED:
1. Grain of Wheat Christian Korean church, Taytay, Rizal
2. 1,500 seating capacity Gymnasium owned by Grain of Wheat Christian Korean Church, Taytay, Rizal.
-3. 2,400 m2 RTW warehouse / plant owned by Su-yang Corp. Bauan, Batangas.
- -4. 1,200 m warehouse with offices owned by Su-yang Corp. Bauan, Batangas
-5. 1,800 m2 warehouse and workers areas for Pansy export accessories.
- 6. Repair of another 1,200m2 warehouse, Pancy
- 7. 3-Storey residence for the owner inside compound
- 8. Country home / vacation house of the owner at the highest hill top in Pililla, Rizal- this includes
- Road works from the Highway to the residential compound of over 1 km.concrete road.
- 9. 2-storey expansion office bldg.
*January 2000 – December 2002 – SELF EMPLOYED AS C0ST –PLUS CONTRACTOR
DUTIES & RESPONSIBILITIES
-Organizes personnel and workforce for the construction project.
-Supervises the construction and attends to all requirements, coordination and general management.
PROJECTS UNDERTAKEN/ COMPLETED
1.3-storey Commercial building- Concrete edifice with Roof deck owned by Mrs. Tess Velo
2.2-storey Commercial building- Concrete edifice with long span roofing for Mrs. Tess Velo
3.Residence for DR. & MRS. RODOLFO TALAG
Split level residential renovation located at Ballesteros St., Mandaluyong City: Architectural
& Interior fnishes and façade facelifting and expansion of the residence.
4.Residence of2 storey residence located in Valenzuela City renovation/expansion and
replacement of roof.
7.September 1998 – December 1999 – FLOUR DANIEL PACIFIC, INC.
Position: Const. / Craft Superintendent I
DUTIES & RESPONSIBILITIES
-All supervision, coordination, planning and management involved thereto.
PROJECT UNDERTAKEN/ COMPLETED
-Procter & Gamble Plant – Capuano, Laguna – this is an 11-storey industrial plant building{high
ceiling from floor to flr making it equivalent to 18-storey for an ordinary bldg.} and 5 storey packing
building with adjacent offices. This is made of fabricated structural steel framing, columns and beams
in bolt erection system. Sidings and roofing made of insulated metal panels called “sandwich”insulated
panels screwed to metal purlins. Mechanical piping, insulation, millwright works and all other activities were
involved in this industrial construction. The offices were of gypsum wall panels and ceilings on
metal framing.
8.January 1996 – January 1998 – SAMSUNG ENG’G. & CONST. CO. LTD., Mailiao, Taiwan
Position: Steel Structural Supervisor
DUTIES & RESPONSIBILITIES
-Supervises proper implementation of structural erection works including modification works,
scheduling and monitoring of all activities.
Preparation of periodic progress reports, checks materials preparation, submits priority and
sequence of materials delivery; checks correctness of delivered materials and rejects incorrect
and defective materials for proper rectification before installation.
-Liaison work with client, involvement as quality control inspector and executes punch list works;
recommends schedules, for punch items completion as per clients requirements, prepares documents
for work approvals by clients.
OTHER FUNCTION: AS QUANTITY ESTIMATOR
In-charge of balance of quantity estimates of steel fabrication production.
-In-charge of change order quantity estimates
-Checks unit quantities of fabricated items.
-Confirms, checks, evaluates percentage of accomplishment as against balance of work for updated
status of billing.
PROJECT UNDERTAKEN/ COMPLETED
REFINERY/PETROCHEMICAL PLANT FOR FORMOSA PLASTIC CORP., Maliao Taiwan
-Ethylene plant area – this is an industrial plant structure composed of 1,100 meters long in H-Form plan
layout pipe rack, 5-storey high and 12 meters wide, within which area also the equipment structures
and power building wherein housed the gas turbines. Mechanical piping, insulation millwright works
and all other activities were involved in this industrial construction.
9.February 1994 – August 1995 –Grand Plaza Hotel Corp. (Heritage Hotel)
Position: Project Engineer
DUTIES & RESPONSIBILITIES
-1nspection of works to check any mistakes/discrepancies ; rebars, forms, dimensions etc; Isssues S.1.. to rectify all such mistakes & discrepancies; Issues S. 1.for change orders, changes, additive & deductive works; Request the Designers (RFI) for clarifcation of design conflict, design changes, redesign, details etc.; Presides over coordnation meetings, calls for special meetings with contractors & its subcontractors if necessary; Monitors work accomplishment & evaluates billing of contractors
PROJECT UNDERTAKEN/ COMPLETED
Renovation of Heritage Hotel, Roxas Blvd, Pasay Cty.
10. February 1991– May 1993 – MULTIWOOD INT’L. INC. – Marikina, Philippines
Position: Project Manager to Assistant Operations Manager
DUTIES & RESPONSIBILITIES
-Assist the Operations Manager on the general management of the company’s simultaneous project
operations of over 5 projects sites of about 1500 workers and about 40 project staff.
-Responsible for project negotiation, company representation to clients and consultants.
-Project budgeting, material sourcing, costing, profitability, project safety/ housekeeping, human
and industrial relations.
- Supervises the whole project staff – the field engineers, delegation and distribution of area
assignments. Engineering operations warehousing, security, safety and housekeep administration.
-General implementation, acts on important, decisions for the project, project cost controls, and quality
controls.
Prepares project status reports, contract amendments, change order, variation work and cost claims.
-Responsible for timely project completion.
-Deals with all sub-contractors.
-Works out toward the profitability of the project.
PROJECTS UNDERTAKEN/ COMPLETED
1.EDSA SHANGRI-LA HOTEL – Interior finishing works.
2.MAKATI SHANGRI-LA HOTEL – Interior finishing works.
3. DIAMOND HOTEL – Interior finishing works.
5.WESTIN PHIL., PLAZA HOTEL – Interior renovation
6.PHIL. ANIMATION STUDIO
11.March 1989 –December 1990 – CONSTANT BUILDERS & DEV’T. CORP., Makati City
Position: Project Manager
DUTIES & RESPONSIBILITIES
-Supervises the whole project staff – the field engineers, delegation and distribution of area
assignments, engineering operations, warehousing, security, safety/housekeeping/ utility
administration.
-General implementation, acts on important decisions for the project, project cost controls, and
quality controls.
-Prepares project status reports, contract amendments, change order, variation work and cost claims.
-Responsible for timely project completion.
-Deals with all sub-contractors.
-Works out toward the profitability of the project.
PROJECTS UNDERTAKEN
1.31-UNITS 4-LEVEL TOWNHOUSES VELANTE DRIVE, Quezon City – This is a
first class townhouses project from foundation up to finishing works.
2.METROVILLA HOMES, Valenzuela City – This is a first class subdivision situated in a
rolling plateau in a fresh air vista. Works included road construction, curbs and gutters, drainage
and main water pipe systems.
3. Twenty two (22) units Medium-cost houses, Metrovilla homes
3.CLUBHOUSE AND RECREATIONAL CENTER, Metro villa – Composed of basketball
court, lawn tennis court and swimming pool.
4. High end residential house for the Gen manager of Constant Builders located in Green Meadows, Quezon City
12.January 1987 – January 1989 – AL-KADI EST. FR CONT’NG. Riyadh, Saudi Arabia
Position: Const. Superintendent
DUTIES AND RESPONSIBILITIES
-Supervises, implements, and executes procedures of construction works.
-Checks the work of individual workforce, guides, and executes checking of proper lines, elevations,
set backs, right of ways and the like.
-Organize work force into a team of works and assigns working foreman or lead man per project.
-Coordinate closely the different trades in construction for proper flow of works.
-Prepares, regular projects status reports and checks schedules.
-Prepares billing, checks proper execution of works.
-Confers and represents the company in meeting with the Consultants and owners.
-Decides on contract amendments, change orders, cost additives, variations works, re-measurements
and cost claims; correspondence, administrative and technical.
-Executes construction estimates.
-Prepares PERT / CPM and scheduling.
-Company representation to clients and consultants.
PROJECTS UNDERTAKEN
1.SHEIKH ALRUAITEE PALACE, Riyadh, Saudi Arabia – This from foundation up to
finishing works including the other building in the palace compound.
2.14-STOREY COMMERCIAL OFFICE BUILDING – This is from foundation up to
external finishes. Interiors to be done by tenants.
3.Number of first class / high-end residential units or villas.
13.September 1983 – March 1986 – VON FABREAKT, INC. Mandaluyong City
Position:PROJECT ENGINEER/ESTIMATOR
DUTIES AND RESPONSIBILITIES
-Work includes preparation of PERT / CPM work scheduling. Manpower scheduling.
-Quantity take-off of materials, bidding and construction estimates.
-Site inspection of projects sites that affect project costs.
-Assess, evaluates work of sub-contractors for project reports and billing of sub-cons.
-Evaluate periodic work accomplishments/status for billing to the owner of the project/clien
-Supervises steel erection work which comprise 50% of the company projects.
-Schedules manpower for construction, mobilizes workforce to project sites, directs and
supervise correct implementation of work, prepare status reports.
-Decide materials of construction to maintain balance of quality and economy.
-Institutes cost reduction in the use of materials, cost reducing modifications on actual site
requirements, without adversely affecting structural safety, function and beauty.
PROJECTS UNDERTAKEN/ COMPLETED
1.Two-storey Agora type public market for Alaminos, Pangasinan – concrete edifice with steel
trusses for roof and purlins and G.I. long span roofing construction.
2.Casa Filipina Executive Village Subd. – This is a road network and gutter including pipe
laying for sewerage and drainage, manholes, and leveling (house lot) and all appurtenant works.
3. Forty seven (47) units Low-cost and Medium-cost houses, Filipina Executive Village
3.Administration Bldg., Zamboanga Fishing Port – Zamboanga City concrete Bldg. including
2 units 50,000 and 2 units 100,000 gals elevated wate
PROJECTS UNDERTAKEN/ COMPLETED (ESTIMATED BID AND WON)
4. SAN JUAN CENTRAL POST OFFICE – A concrete two-storey edifice constructed
during the administration of Mayor Joseph Estrada.
5. POWERHOUSE, UDIAWAN MINI HYDRO, UDIAWAN, SOLANO, NUEVA
VISCAYA – This included turbine base and foundations.
6. DPWH BASE SHOP – composed several concrete Bldgs. located in Bauang, La Union.
S.S.S. - 036******* CEL: 091********
T.I.N. - 175-734-860 Email: ******@*****.***
I hereby certify to the correctness of the above data to the best of my knowledge and belief.
OSIAS P. GOZE