NOLIBERT B. ELIGAN
** ********* ***. ******* ********
adxnc8@r.postjobfree.com
Position Applied: Pre and Startup Electrical Commissioning
PROFESSIONAL SUMMARY
Proficient in Control and Instrumentation P&IDs, Schematic Diagram, Loop checking, Experience of Alstom Alspa P320 (DCS) RS-Logic, Allen Bradley PLC’ Motorized Actuators (MOV) Limitorque & Bernard, Auma, Pneumatic actuators, Siemens Sipart PS2, Pressure Transmitters, Flow Transmitters, Level Transmitters, Voltage Transducer, Current Transducer, Addressable Fire Alarm System, Temperature Sensors, RTD, PTC, TE, pH and Conductivity Analyzers, Land flow gas monitoring, I am capable of executing Electrical System, Three Phase and Single Phase, AEG DC-DC/AC-DC converters, UPS System, Variable Frequency Drive, Varispeed E7, Industrial Motor Controller, Electric Motors Rewinding, ABB Switchgear, Schneider Switchgear, LS Switchgear, Siemens Switchgear, Schneider MV/LV switchgear, PI (polarity index) test of 6.6KV electric motor Preventive and Corrective Maintenance, Being a primary experience, Start-up, Pre Commissioning and Commissioning, Water Treatment & Coal Handling Control Room Operator, Work experience mainly in Power Plant Industry.
PERSONAL DATA
Period : 15 May 2017 to 31 May 2020
Position : Start-up and Pre Commissioning Electrical
Company : Black and Veatch International Company
Address : Duyen Hai 3 Tra Vinh Province Vietnam
Project : Extension Project 688 MW, Supercritical Coal Fired Power Plant Project
Perform Pre Commissioning, Start-up Commissioning and Commissioning. Gather all documents Check list, P&IDs Single Line Diagram, Wiring Diagram, Schematic Diagram, Commissioning Procedure (CP), Internal Commissioning Procedures (ITP),
Perform Pre Commissioning, Commissioning, Start-up Commissioning. Balance of Plant (BOP), Water Treatment Plant and Waste Water Plant, Coal Handling System, Coal Ship Unloader, Coal Stacker Reclaimer.
Perform Site Acceptance Test (SAT), Factory Acceptance Test (FAT) cold loop check point to point check to confirm that all cables are terminated. All wiring errors must be corrected.
Perform Cubicles Energization, LV/MV switchgear and Motor Control Cabinet. Before the energization confirm all the cables terminated. Power is not supply. Megger test all the Cables and Bus Bur individually. Execute Rotation test after the energization to confirm all the 3Phases are correct.
Perform Hot Loop Checks, after the Mechanical Construction Completion and the following energization. Hot Loop Check must be confirm the control loop of the system from HMI/PLC, to the end device.
Perform Transformer checks and energization. Oil sample must be taken before and after energization. Take winding resistance test. Ratio Test Primary winding to secondary winding.
Perform Protection Relay testing. To monitor Voltage and Current provide rapid response to safe the system if there be any fault detected. PTs and CTs transformer measure/monitor voltage and current. The relays sense fault/disturbances of the system and react accordingly.
Perform Interlocking Test of Two line up switchgear and Bus tie to prevent damage the equipment. Interlocks to be confirm, Function test must be execute prior to energization.
Perform Induction Motor Test. Test Sheet are intact initial checks include Visual Checks, Gathered all the data of the Motor name plate, Manual rotation check of the shaft to confirm is there is damage, Proper Termination of the cable must be check, Motor winding continuity and resistance test, Winding Insulation Resistance test, PI test for large Motor, Phase to ground insulation resistance test. Motors ready to energized, Rotation checks, Motor Uncouple Run no load, Motor Couple Run with load.
Perform AC/DC hi pot test and Battery Discharge Tests. Hi pot test to insure the dielectric to withstand rated transient voltage. Battery Discharge test. check battery voltage individually, cycle testing and load testing,
Perform Electrical Turn over Package, Start-up and Commissioning of the system. Adheres safety and quality standards as applicable to duties and accountabilities. Assist the Commissioning Manager for the implementation of Lockout/Tag out (LOTO) program.
Execute Coal handling CCR operator and Coal Stacker Recamier operator.
Period : 29 January 2014 to 26 July 2015
Position : Start-up and Pre Commissioning Electrical
Company : Black and Veatch International Company
Address : Binugao Toril, Davao City 8000 Philippines
Project : 2x150 MW Coal Fired Power Plant Therma South Energy Project
Perform Pre Commissioning, Start-up Commissioning and Commissioning. Gather all documents Check list, P&IDs Single Line Diagram, Wiring Diagram, Schematic Diagram, Commissioning Procedure (CP), Internal Commissioning Procedures (ITP),
Perform Pre Commissioning, Commissioning, Start-up Commissioning. Balance of Plant (BOP), Water Treatment Plant and Waste Water Plant, Coal Handling System, Coal Ship Unloader, Coal Stacker Reclaimer.
Perform Site Acceptance Test (SAT), Factory Acceptance Test (FAT) cold loop check point to point check to confirm that all cables are terminated. All wiring errors must be corrected.
Perform Cubicles Energization, LV/MV switchgear and Motor Control Cabinet. Before the energization confirm all the cables terminated. Power is not supply. Megger test all the Cables and Bus Bur individually. Execute Rotation test after the energization to confirm all the 3Phases are correct.
Perform Hot Loop Checks, after the Mechanical Construction Completion and the following energization. Hot Loop Check must be confirm the control loop of the system from HMI/PLC, to the end device.
Perform Transformer checks and energization. Oil sample must be taken before and after energization. Take winding resistance test. Ratio Test Primary winding to secondary winding.
Perform Protection Relay testing. To monitor Voltage and Current provide rapid response to safe the system if there be any fault detected. PTs and CTs transformer measure/monitor voltage and current. The relays sense fault/disturbances of the system and react accordingly.
Perform Interlocking Test of Two line up switchgear and Bus tie to prevent damage the equipment. Interlocks to be confirm, Function test must be execute prior to energization.
Perform Induction Motor Test. Test Sheet are intact initial checks include Visual Checks, Gathered all the data of the Motor name plate, Manual rotation check of the shaft to confirm is there is damage, Proper Termination of the cable must be check, Motor winding continuity and resistance test, Winding Insulation Resistance test, PI test for large Motor, Phase to ground insulation resistance test. Motors ready to energized, Rotation checks, Motor Uncouple Run no load, Motor Couple Run with load.
Perform AC/DC hi pot test and Battery Discharge Tests. Hi pot test to insure the dielectric to withstand rated transient voltage. Battery Discharge test. check battery voltage individually, cycle testing and load testing,
Perform Electrical Turn over Package, Start-up and Commissioning of the system. Adheres safety and quality standards as applicable to duties and accountabilities. Assist the Commissioning Manager for the implementation of Lockout/Tag out (LOTO) program.
Execute Coal handling CCR operator and Coal Stacker Recamier operator.
Period : 06 October 2013 to 20 November 2013
Position : Electrical Commissioning
Company : YTL Power Services Sdn Bhd / Siemens
Address : Kerteh Malaysia
Project : Petronas Gas Berhad UENICS CUF Kerteh Project
Performs Commissioning and protection relay retrofitting.
Period : 26 April 2013 to 24 June 2013
Position : Electrical Commissioning
Company : YTL Power Services Sdn Bhd / Samsung C&T
Address : Jurong Island Singapore
Project : GMR Energy 2x400 MW Combined Cycle Power Plant (CCPP) Project
Perform Pre Commissioning, Start-up Commissioning and Commissioning. Gather all documents Check list, P&IDs Single Line Diagram, Wiring Diagram, Schematic Diagram, Commissioning Procedure (CP), Internal Commissioning Procedures (ITP),
Perform Pre Commissioning, Commissioning, Start-up Commissioning. Balance of Plant (BOP), Water Treatment Plant and Waste Water Plant, Coal Handling System,
Perform Site Acceptance Test (SAT), Factory Acceptance Test (FAT) cold loop check point to point check to confirm that all cables are terminated. All wiring errors must be corrected.
Perform Cubicles Energization, LV/MV switchgear and Motor Control Cabinet. Before the energization confirm all the cables terminated. Power is not supply. Megger test all the Cables and Bus Bur individually. Execute Rotation test after the energization to confirm all the 3Phases are correct.
Perform Hot Loop Checks, after the Mechanical Construction Completion and the following energization. Hot Loop Check must be confirm the control loop of the system from HMI/PLC, to the end device.
Perform Transformer checks and energization. Oil sample must be taken before and after energization. Take winding resistance test. Ratio Test Primary winding to secondary winding.
Perform Protection Relay testing. To monitor Voltage and Current provide rapid response to safe the system if there be any fault detected. PTs and CTs transformer measure/monitor voltage and current. The relays sense fault/disturbances of the system and react accordingly.
Perform Interlocking Test of Two line up switchgear and Bus tie to prevent damage the equipment. Interlocks to be confirm, Function test must be execute prior to energization.
Perform Induction Motor Test. Test Sheet are intact initial checks include Visual Checks, Gathered all the data of the Motor name plate, Manual rotation check of the shaft to confirm is there is damage, Proper Termination of the cable must be check, Motor winding continuity and resistance test, Winding Insulation Resistance test, PI test for large Motor, Phase to ground insulation resistance test. Motors ready to energized, Rotation checks, Bump test, Motor Uncouple Run no load, Motor Couple Run with load.
Perform AC/DC hi pot test and Battery Discharge Tests. Hi pot test to insure the dielectric to withstand rated transient voltage. Battery Discharge test. check battery voltage individually, cycle testing and load testing,
Perform Electrical Turn over Package, Start-up and Commissioning of the system. Adheres safety and quality standards as applicable to duties and accountabilities. Assist the Commissioning Manager for the implementation of Lockout/Tag out (LOTO) program.
Period : 22 February 2012 to 30 April 2013
Position : Start-up and Pre Commissioning Electrical / EBNI
Company : Areva Nuclear Power
Address : Finland -27160 Olkiluoto
Project : OL3 1600 MW European Pressurized Reactor (EPR) Nuclear Power Plant Project
Startup Pre Commissioning and Commissioning in Nuclear Island Division 1, 2, 3&4 Electrical Systems.
Perform Pre Commissioning, Start-up Commissioning and Commissioning. Gather all documents Check list, P&IDs Single Line Diagram, Wiring Diagram, Schematic Diagram, Commissioning Procedure (CP), Internal Commissioning Procedures (ITP),
Perform Cold loop check point to point check to confirm that all cables are terminated. All wiring errors must be corrected.
Perform Cubicles Energization, LV/MV switchgear and Motor Control Cabinet. Before the energization confirm all the cables terminated. Power is not supply. Megger test all the Cables and Bus Bur individually. Execute Rotation test after the energization to confirm all the 3Phases are correct.
Perform Protection Relay testing. To monitor Voltage and Current provide rapid response to safe the system if there be any fault detected. PTs and CTs transformer measure/monitor voltage and current. The relays sense fault/disturbances of the system and react accordingly.
Perform Interlocking Test of Two line up switchgear and Bus tie to prevent damage the equipment. Interlocks to be confirm, Function test must be execute prior to energization.
Perform Induction Motor Test. Test Sheet are intact initial checks include Visual Checks, Gathered all the data of the Motor name plate, Manual rotation check of the shaft to confirm is there is damage, Proper Termination of the cable must be check, Motor winding continuity and resistance test, Winding Insulation Resistance test, PI test for large Motor, Phase to ground insulation resistance test. Motors ready to energized, Rotation checks, Motor Uncouple Run no load, Motor Couple Run with load.
Perform AC/DC hi pot test and Battery Discharge Tests. Hi pot test to insure the dielectric to withstand rated transient voltage. Battery Discharge test. check battery voltage individually, cycle testing and load testing,
Perform Adheres safety and quality standards as applicable to duties and accountabilities. Assist the Commissioning Manager for the implementation of Lockout/Tag out (LOTO) program.
Period : 07 February 2011 to 22 June 2011
Position : Electrical & Control Instrument Commissioning Technician
Company : Black and Veatch International Company
Address : Tanjung Jati Jepara Indonesia
Project : 2x660 MW Coal Fired Power Plant Unit 3&4 Project
Commissioning through to start-up & system handover units 3 & 4 a Coal Fired Power Plant of PLN (Perusahaan Listrik Negara) under Black & Veatch in Tanjung Jati Jepara, Indonesia Includes Fly Ash Disposal System, FGD (Fuel Gas Desulfurization), EP (Electrostatic Precipitator), System
Performs testing and calibration of Electrical and Instrument devices, Loop checking, Insulation test, Continuity test, Micro Ohm Test, Field calibration, Verifies set points per design of Instrument devices, function test, interlock test, loops checking, Electric motors no-load test and load run test, functional testing of equipment and system, Perform test records sheet, documentation of equipment and subsystem turnover to the client, Supports plant operation during startup and initial operations, Adheres safety and quality standards as applicable to duties and accountabilities. Assist the Commissioning Manager in the implementation of Lockout/Tag out (LOTO) program
Period : 04 January 2010 to 15 May 210
Position : Electrical & Control Instrument Commissioning Technician
Company : Doosan Heavy Industries
Address : Cebu Philippines
Project : 2x103 MW Coal Fired Power Plant Project
Performed Loop checking, Continuity check, Pre-Commissioning/Commissioning 2x103megawatts coal fired power plant, GIS 13.8kv Gas Insulated Switchgear Hyosung, 6.9MV, Switchgear 48LV Switchgear LS, GCB Generator Circuit Breaker Areva, UPS system Borri, LS MCC 100MVA main transformer 31.5MVA Aux Transformer Fortune Electric, Logic test from field to system cabinet for DCS, Equipment and subsystem turnover documentation, Electric motor test, Solo test, Load test, Electric Motor Insulation test Resistance test, Execute Control and Instrumentation, Siemen Electronic/pneumatic PS2 Calibration, Start-up Pre Commissioning / Commissioning of Water Treatment Plant, corrective/preventive maintenance, instrument calibration of SMART pressure transmitters, SEGNET flow transmitters, Seojin Instech level transmitters, Temperature sensor test RTD,TC PTC, Vibration test. Interfacing with Allen Bradley PLC Rslogix 5000, HMI, Varispeed E7 frequency inverter, UF, SWRO, BWRO, CDI system Ion pure, Endress+Hauser pH and conductivity analyzer. Full understanding of the equipment, P & ID, manuals, technical data and spare part specifications.
Period : 12 March 2008 to 30 January 2009
Position : Chief Electrician
Company : WJ Ground Water Limited
Address : Duabai, UAE
Project : Dewatering Project
Perform Commissioning and Installation of Electrical Control Panels Instrument device, Loop checking, Insulation test, Continuity test, Control level switch, DOL and Soft start STAR DELTA, Grundfos MP204 CU3 motor controller, Grundfos pump, Franklin Submersible Electric motor, Automatic Transfer Switch(ATS ) Motor control alarm system, Check and Test Electrical Equipment before putting into service, Routine Maintenances Troubleshooting and Repair of Generators 300 KVA 430 VOLTS PERKINS Diesel Generator, SDMO Diesel Generator, Disassembles Electrical and Mechanical equipment and perform test using measuring equipment, Demonstrates knowledge of Electrical and Instrumentation system functions including maintenance work practices and divisional safe work practices. Full understanding of the equipment, P & IDs, manuals, technical data and spare part specifications Assist in the training and development of new technicians, emergency response activities as required, general housekeeping functions as necessary Implement basic guidelines for working safely with electricity.
Period : July 2007 to October 2007
Position : Electrical Supervisor
Company : Alstom Japan KK
Address : Villanueva Cagayan de Oro City, Philippines
Project : 2x205 MW Coal fired Plant, Power Shutdown Project
In Charge in all Modification, Commissioning troubleshooting and repair work as per required by Alstom designers handling manpower tools equipment, PTW to execute daily schedules and progress to meet the deadline before the plant re- started, replacements of bearings for mixers and hydrators, initiate installations of additional machine and process line troubleshooting and implement corrective action to avoid recurrence of the problem, Practice of working safely in carry out his duties and responsibilities.
Period : 02 February 2003 to May 2006
Position : Cellphone Technician / Trainor
Company : Celtecs Cellphone Repair Training Center
Address : Lingayen, Philippines
Sole Owner
Engage of mobile phone repair through software and hardware troubleshooting Conduct proper hands on training and develop new skills.
Period : 10 May 2001 to 14 December 2002
Position : Control & Instrument Commissioning Technician (BOPM)
Company : Alstom Power Plants Services Ltd.
Address : Hoping Taiwan R.O.C.
Project : 2x660 MW Coal Fired Power Plant Project
Perform Start-Up Pre-Commissioning / Commissioning and Maintenance Balance of plant (BOPM) Execute Control and Instrumentation, loop checking, Logic test from field to DCS, Field Calibration and sitting of Pneumatic valve, Motorized Actuator Limitorque, Bernard, Auma, Level Transmitters, Flow Transmitters, Pressure Transmitters, Temperature monitoring sensors like RTD, TE, UV detector, IR detector, UV-IR detector, Smoke detector, Ionization, How Fire System, BENTLY NAVADA 3500 series condition monitoring system for field equipment measuring axial, radial speed and temperature system, Alstom ALSPA 320 Distributed Control System (DCS) ALLEN BRADLEY PLC 5/30 to PC’S Man machine interfaces with Citic Graphic Software for water treatment plant, Sensors to Controllers interfacing, Performance testing and reliability trials prior to client takeover of the 2x660MV Coal Fired Power Station, Full understanding of the equipment, P&ID, Schematic diagram and manuals, technical data and spare parts specifications, Demonstrate knowledge of the purpose and function of plant electrical equipment and control systems.
Period : 15 June 1998 to 09 May 2001
Position : Control & Instrument Commissioning Technician (BOPM)
Company : Alstom Power Plants Services Ltd.
Address : Sual Power Station Brgy. Pangascasan Sual Pangasinan Philippines
Project : 2x609 MW Coal Fired Power Plant Project
Perform Start-Up Pre-Commissioning / Commissioning and Maintenance Balance of plant (BOPM) Execute Control and Instrumentation, loop checking, Logic test from field to DCS, Field Calibration and sitting of Pneumatic valve, Motorized Actuator Limitorque, Bernard, Auma, Level Transmitters, Flow Transmitters, Pressure Transmitters, Temperature monitoring sensors like RTD, TE, UV detector, IR detector, UV-IR detector, Smoke detector, Ionization, How Fire System, BENTLY NAVADA 3500 series condition monitoring system for field equipment measuring axial, radial speed and temperature system, Alstom ALSPA 320 Distributed Control System (DCS) ALLEN BRADLEY PLC 5/30 to PC’S Man machine interfaces with Citic Graphic Software for water treatment plant, Sensors to Controllers interfacing, Performance testing and reliability trials prior to client takeover of the 2x660MV Coal Fired Power Station, Full understanding of the equipment, P&ID, Schematic diagram and manuals, technical data and spare parts specifications, Demonstrate knowledge of the purpose and function of plant electrical equipment and control systems.
Period : 21 July 1997 to 26 May 1998
Position : Electrical Lead Man / Sub Con
Company : Ecco Asia
Address : Sual Power Station Brgy. Pangascasan Sual Pangasinan Philippines
Project : 2x609 MW Coal Fired Power Plant Project
Performed Layout and Installation of Panel, Cable Trays, termination of Instrument cable low voltage cable
Period : 08 April 1997 to 21 July 1997
Position : Electrician 3
Company : GEC Alstom
Address : Sual Power Station Brgy. Pangascasan Sual Pangasinan Philippines
Project : 2x609 MW Coal Fired Power Plant Project
Performed Layout and Installation of Panel, Cable Trays, termination Instrument cable low voltage cable.
Period : 01 October 1996 to 07 April 1997
Position : Electrical Technician
Company : Southern Company & Construction
Address : Sual Power Station Brgy. Pangascasan Sual Pangasinan Philippines
Project : 2x609 MW Coal Fired Power Plant Project
Perform Preventive and Corrective Maintenance Electrical of all process machines in a safe manner and procedure troubleshooting repair overhead cranes which consist of Three Phase Motors 480VAC, Routine Maintenance activities Industrial Motor Control, Electric Motor Rewinding Single Phase Three Phase Induction Motor 230/430volts.
Period : 01 July 1994 to 16 September 1994
Position : Industrial Electrician
Company : MCEI Asphalt Plant and Crusher
Address : Binalonan, Pangasinan Philippines
Perform Preventive Corrective maintenance of Control and Instrument/Electrical System, Asphalt plant and Crusher, Electric Motor Rewinding Single Phase Three Phase Induction Motor 230/430volts, Routine troubleshooting activities Industrial Motor Controls.
Period : 25 January 1994 to 25 June 1994
Position : Production Operator
Company : Star Light Company
Address : Quezon City Philippines
Perform vacuum fluorescent tube Viking, charging argon gas and mercury.
Period : 23 January 1992 to 08 December 1993
Position : Industrial Electrician / OJT
Company : MCEI Asphalt Plant and Crusher
Address : Binalonan, Pangasinan Philippines
Perform Preventive Corrective maintenance of Control and Instrument/Electrical System, Asphalt plant and Crusher, Electric Motor Rewinding Single Phase Three Phase Induction Motor 230/430volts, Routine troubleshooting activities Industrial Motor Controls.
EDUCATION
Electrical Technology Two Years Course Apr 1990 - Mar 1992
Pangasinan School of Arts and Trade Specialized Lingayen, Philippines
Specialized in Electrical Technology
SKILLS
Knowledge in Induction Motor Rewinder, Variable Frequency Drives,
Trouble shooting and Repair wiring circuit
Knowledge Single line Diagram, Schematic Diagram, Ladder.
Knowledge of safety standards and procedures OSHA Certificate, Safety at Electrical work SFS6002, G3 NFPA 70E for Manager and Electricians 2015
Installing electrical conduits, cables, tubing, and cable termination.
Knowledge of National Electric Code and local electric codes
Knowledge of Programmable Logic Controllers (MHI PLC SCADA)
Installing and maintaining electrical systems, equipment and devices
Power plant experience, construction experience and industrial experience
Knowledge of LV/MV switchgear, Motor Control Cabinet, Distribution Box.
Using and maintaining hand and power tools, such as screwdrivers, pliers and drills
Testing equipment, instruments and systems basic (Multi Meter, Insulation Tester, 4-20ma injector)
Knowledge and experience in Commissioning, Startup Commissioning Pre Commissioning
PERSONAL DATA
Date of Birth November 22, 1967
Place of Birth Guihulngan Negros Oriental
Nationality Filipino
Sex Male
Civil Status Married
SSS No 02-0991849-8
Tin 198-760-344
Passport No. P2429749A Date issue 17 December 2021 Expired 16 December 2031
Driver’s License A079315700
PROFESSIONAL CREDENTIALS
•Pangasinan School of Arts and Trade Specialized In Electrical Technology
AWARDS AND HONOURS
National Manpower Youth Council 1991
•Third Class Building Electrician
•Electrician Trade Skills Examination
•Pass Certificate No. 013*******
National Manpower Youth Council - San Fernando, La Union 1991
•Outstanding Electrician Award
•School Year 1990 - 1991
•Pangasinan School of Arts and Trade
Youth Skills Olympics Building Wiring 1991
•School Representative
•Third Regional Skills Olympics
EDUCATION AND TRAINING RECORDS
Zeversolar Training
Jiangsu Zeversolar Solar New Energy Co., Ltd
Quezon City, Philippines August 2015
Basic Technology of PV system and PV inverter
Introduction of Zeversolar string inverters
Monitoring solution for residential and commercial application
Inverter selection and PV system design
Inverter installation, commissioning, daily maintenance and troubleshooting
Click Safety
G3 NFPA 70E for Managers and Electricians 2015
Serial Number: 13722467 Completed: June 3, 2015
Safety at Electrical Work SFS6002 Training
Winnova Electrical and Automation Technology
Pori Finland, Ulasoorinatie February 2012
Occupational Safety Card Training
Hotel Cumulus Rauma, Finland March 2012
Construction OSHA 10 Hour Outreach Program
2X660 Megawatts Coal Fired Power Plant
Coal Fired Power Plant Unit 3&4 Tanjung Jati Jepara, Indonesia 17-23-24, March 2011
2008 Submersible Motor Workshop
Franklin Electric’s Practical and Theoretical Submersible Motor Workshop and Application, Installation and Maintenance
Franklin Tech training Center Wittlich Germany November 3-7, 2008
R3 Fire Detection System Network
Sual Power Plant, Philippines September 1, 1999
Land Combustion Flue Gas Monitoring
Sual Power Plant October 1999
Pangasinan National High School
Lingayen, Pangasinan S.Y. April 1, 1990-1992
CHARACTER REFERENCE:
Gaudencio Flores
Electrical Instructor
Pangasinan School of Arts and Trade Lingayen
Pangasinan, Philippines
Halt Whull
Deputy Commissioning Manager
Black and Veatch International
Email address: adxnc8@r.postjobfree.com
Stuart Miles
Startup Commissioning Manager
Black and Veatch International
Email address: adxnc8@r.postjobfree.com
Nolibert B. Eligan
Applicant