|
Resume alert |
Resumes 1 - 10 of 80 |
Qibla, 14, Kuwait
... Equipment Installation/Erection and alignment in Oil Section, GTU, SRU, Utility and Flare area ( 300 Major Equipment’s like Compressors, GTG, Steam Boiler, Stabilizer, vessel, Columns, incinerator, KOD and HP/LP Flare Stacks. Responsible for Piping ...
- Apr 21
Qibla, Kuwait
... 2, Operate a 210-ton all terrain crane to installed and align a 33-tons incinerator vessel. 3, Erect and installed 7-tons communication radars, accessories and other vital parts. 4, Lift a 12-tons navy security boat, load and unload navy materials ...
- Jan 29
Qibla, 14, Kuwait
... & piping From Sep 2011 to Laggan Tormore Project, Vessel fabrication Projects, Tecnimont Project & Fisia project at ABJ. Feb 2010 to Sep 2011- Job-Petrofac Algerian project client store (KN). July 200909 to Jan 2010 K.P.P.C PIC Aromatics Complex ...
- 2023 Aug 21
Qibla, 14, Kuwait
... Vessel: Open the man ways. Cleaning, buffing as per marked area. Demister pad removal. Cleaning (air and water) the demister pads. Buffing the t joint area, nozzle, and vertex breaker. Install the demister pad. After completion of final inspection ...
- 2023 Aug 07
Qibla, 14, Kuwait
... WLL (Kuwait, Iraq) From: 01/2004 Till 06/2012 • Instrumental in Liner Vessel Operations & Customer Relation management. • Preparing PDA. Discharge Plan, Loading Plan of vessel in coordination with Port • Act as Primary Contact for vessel arrival and ...
- 2023 Jul 16
Qibla, 14, Kuwait
... Knout out Drum, Dedicated Drain Sump Vessel and Pumps, Fuel Gas Knock out Drum, Chemical Injection Systems-required for one new desalter train each at the GCs noted above along with all associated equipment, Piping,Valves,Subsystems and Utilities. ...
- 2023 Jul 08
Qibla, 14, Kuwait
... • Approve all maintenance department requisition purchase orders • Supply rig management with maintenance statistics of the vessel. • Advise on ways of making improvements to the inventory kept on the Berth. • Document any and all changes to the RMS ...
- 2023 Jun 05
Qibla, 14, Kuwait
... for Construction of Piping and Pipe support, Valve support, Platform support, Air Vessel Storage support, LCP, DBs foundations works inside GCs. Work Experience in India: Company Name Duration Designation Project Handled Global Erectors Tamil Nadu ...
- 2023 Mar 24
Qibla, 14, Kuwait
... operations with trade groups instructing vessels, agents, contractors and stevedores on a daily basis Plan the voyage of the vessel in association with the vessel operations manager Arrange payment of proforma DA’s and cash to Master’s requests and ...
- 2023 Mar 24
Qibla, Kuwait City, 14, Kuwait
... I participated lighting work of pipe rack, vessel area, reactor area, tank area. I participated all other works as earth works, cad welding works, cable pulling works, Cable tray installation work etc. . Instrumentations a. I participate instrument ...
- 2023 Mar 19