Post Job Free

Resume

Sign in

Electrical Supervisor Construction Clean

Location:
Qibla, Kuwait City, 14, Kuwait
Posted:
March 19, 2023

Contact this candidate

Resume:

ANIL KUMAR.S

Sreeja Bhavan,

Thuvayoor South (P.O),

Thuvayoor, Pathanamthitta

(Dist.) Kerala, India

Ph Kuwait: 00965 – 51643965, wats up 009**-******** advz5u@r.postjobfree.com

POSITION APPLIED FOR ELECTRICAL SUPERVISOR

Career Objective: -

Highly motivated and good oriented professional committed to pursuing long term career in Electrical Engineering, offer 18 year’s track Electrical Supervisor KUWAIT. day today maintenance and major engineering construction oil and gas petrochemical and commercial project…. .

(1) INDUSTRIAL ELECTRICAL PROJECTS CO.(IEPC) Current working 7-12- 2019 started ELECTRICAL SUPERVISOR B&BMANAGE HOTEL COMPANY, SQC INTRNATIONAL CONSALTANCY, MYSK BY SHAZA HOTEL and AGILITY new WARE HOUSE 26K

(2) TECNICAS REUNIDAS (TR) TSHJV, Al Zour Refinery Project (EPC), KIPIC, KUWAIT; Electrical Supervisor and Work permit issuer (AL

ZOUR/EPC-055-A-MAIN PROCESS UNITS 23 AND 25) from 23-12-2018 TO 17-9-2019

(3) Working as ELECTRICAL SUPERVISOR from 10.12.2016 to22.12.2018 KNPC

CLEAN FUEL PROJECT. (MAA REFINERY)

ROLE: WORK PERMIT EXECUTER, ELECTRICAL SUPERVISOR - KNPC CLEAN FUELS PROJECT (JGSK, GS Engineering construction) GS :Engineering Construction

KNPC clean fuel project (10.12.2016) KHARAFI NATIONAL, (12,12,2017) DONG YEONG ROLE: WORK PERMIT EXECUTER, ELECTRICAL SUPERVISOR - KNPC CLEAN FUELS PROJECT (JGSK, GS engineering construction)

(1) Hyundai Engineering and construction with Kharafi national (KOC project)

Installation of low sulfur fuel oil FG and gas oil pipe line from MAA KNPC to Sibiya and Doha Power station, working as Electrical Work site Supervisor and KNPC direct executor from 01/05/2014 to 09/12/2015

(2) Petrofac International with Kharafi national (KOC project) Working as an Electrical work site supervisor with Kharafi national at KNPC and KOC fuel and gas oil pipeline pumping station from min Ahmadi to mina al zour and Shuaiba power station. Project EF 1760 started from 26-03-2012 to 30-04-2014.

(3) M/s ABJ Engineering and Contracting Co.(EPC KNPC project) Worked as an electrical Foreman from 25-04-2009 to 27-04-2010 at KNPC in EPC works of Fire and Gas detection Project

(4) Flour International (EG-1 –EQUATE) with Kharafi national Worked as an Electrical Foreman with Kharafi national in Low Pressure Polyethylene in Kuwait (LPK) plant, Olefins II Project in Shuaiba industrial area, Kuwait from July 2008 to April 2009 with M/s Kharafi National.

(5) World Service Italia- EG 2 (Equate) with Kharafi national Worked with Kharafi national industrial electrician and instrument electrician from 15-02-2007 to 10-06-2008 with Kharafi National.

(6) Daelim Industrial Co. LTD (KOC) with Kharafi national Worked as electrician influent water disposal project from 02-02-2005 to 10-02-2007 with Kharafi National.

(7) JOB RESPONSIBILITIES: -

. KUWAIT NATIONAL PETROLIUM COMPANY (KNPC) Work

Permit Authorized Executor)

. (KUWAIT OIL COMPANY (KOC) work Permit Authorized executor

. (Kerala Government Authorized Electrician – License No: 99237)

. SPECIAL TRAINING ATANTED FOR NEW REFINARY PROJECT(TSHJ)

. WORKING AT HIGHT

. CONFIND SPAICE

. LEADER SHIP TRAING FOR SUPERVISOR

. APPROVID PTW ISSUER

. COMPITAND RESQUE OPERATOR TRAINING FOR THERD PARTY

(confined space and working at Hight emergency’s)

(8) Professional Experience

. TECNICAS REUNIDAS Al zour Refinery project.

Unit 23 &25 electrical supervisor all electrical construction job handling PTO, HANDOVER, SUBSYSTEM PUNCH CLOSING all activity, KIPIC authorized work site permit issuer,

(9) GS engineering construction Kharafinational, dong Yeong engineering construction clean fuel project KNPC This project electrical job first starting my supervision

. cathodic protection, deep well anode installation 50-meter unit 107,137

. unit 25 shutdown activity full job field and m74 a substation electrical full job

(EXISTING SUBSTAION CRITICAL ACTIVICTY)

. clean fuel project main 11kv cable tray unit 107

. unit 144 electrical all activity

. unit 26 shutdown activity full job field and m74b substation electrical full job

. unit 12 substation all electrical activity and EICS (dong Yeong scope) .

. OMCCR control room

. RCR control room

. RMP control room

. unit 39 all electrical activity

. unit 12 all electrical activity

. all tank aria cable pulling glanding mov DB installation

. HV CABLE MV CABLE JOINT. KNPC 107 SUBSTATION TO UNIT 61 SUBSTATION AND UNIT 12 SUBSTATION ALL CABLE

JOINTING ACTIVICTY

. 61/4 substation all ELECTRICAL AND EICS activity, and Feld all installation cathodic protection, lighting, HV and lv mv cable glanding, Termination pree commissioning

(10) KHARAFI NATIONAL, KUWAIT

Position: Electrical Supervisor (KUWAIT NATIONAL PETROLIUM COMPANY) Duration: 25-04-2009

(11) Fire and Gas detection Project (EPC - ABJ ENGINEERING)

. Refinery all unit compressor related installation, Flame detector, Gas detector, Smoke detector, Heat detector, Manual call point, MOV s installation.

. Bitumen area to FUP control room main pipe rack cable trench excavation, cable laying, all compressor area JB, JB frame, cable tray installation, Gland termination etc

(12) Gas Plant

. Drain-1, Drain-2, Drain-3, GPCCR these three compressors delivery side installed new MOV, flame detector, gas detector, manual call point, MOV isolators in each Compressor shelters.

(13) Installation of Fuel and Gas Pipe line Pumping Station MAA to ALZOUR and Shoiba Power station Kuwait (Petrofac International -1760) RM-34 Substation and Pumping Station MFO area Pig Launcher Work co-ordination, Manpower distribution, Material arranging, Material gate pass request making, Equipment safety certificate request making, and arranging KNPC authorized Confined space entrant and attend fire watcher, rigger. Installed Portable Sub stations, Transformer VSD panels, MCC panels and HT panels in RM-34 S/S. Arrangement of Cable trench excavation notification and Sub contractors are the responsibilities. The Project related substations are M71, M71A, M20, RM-35. Other related locations are control room, OMCCR, GPCCR, RMP, PLCR, SLCR, Fire station etc.…

(14) Installation of Low Sulphur fuel oil (LSF) FG and Gas oil pipe line from MAA to Shoiba and Doha power station. (Hyundai Engineering and Construction-Ef-1713)

. RM-35 Substation, FO Pump area, metering skid, Pig Launcher, tank area, Substations and control rooms.

. Major works are Heat racking of pipelines, installation of heating cable in pipelines, power kit isolator JBs, DBs, Cable trays, panel board installations, all earth works, Cad welding, Work co-ordination manpower distribution and controlling etc.…. I participate in tank area (live) tank 758,759,760,761,762 heat racking work without safety issues.

(15) Equate Petro Chemical Co WORLD SERVICE ITALIA EG2 (Low pressure Polyethylene expansion project in Shuaiba Industrial area) Work locations are, EG-2, Equate face -2. I participated lighting work of pipe rack, vessel area, reactor area, tank area. I participated all other works as earth works, cad welding works, cable pulling works, Cable tray installation work etc.

. Instrumentations

a. I participate instrument cable laying glanding termination in all vessels, installations of isolators in all reactors and installation of thermo couples.

(16) EG – 1 Flour International (EG-1 –EQUATE) with Kharafi national o I participate the following works in new substation – EG -1

. All lighting works in vessel areas, reactor areas and Pipe rack

. Installation of cable tray supports JB, JB frame….

(17) OLD REACTORE

. Installation of new instruments.

. Installation of radioactive sources

. Cable pulling, Cable glanding and termination.

(18) INFLUENT WATER DISPOSEL PROJECT – DALEEM

INDUSTRIAL COMPANY (KOC)

. Cable laying, glanding and termination

. Cathodic protection Job

. Plant commissioning and pre-commissioning.

1. Maintenance

● Responsible for operation and maintenance of electrical equipment’s system substation. Electrical trouble shooting as per oil field safety rules and work permit system.

● Maintenance of HT, LT Switchgears, Transformers, Motors and all other Electrical Equipment’s.

● Maintenance and troubleshooting of AC circuit for fire alarm panels.

● Knowledge about the Operation and maintenance of VCB breakers (11 KV).

● Knowledge about the Operation and maintenance of Oil Circuit Breakers, Air Circuit breakers (440V).

● Knowledge about maintenance of Power and Distribution Transformer11KV/3.3KV, 3.3KV/440V and 11 KV/440 V.

● Maintenance of Ingress protection lighting systems.

● Handling the activities like cable Laying, Glanding and Termination of power cables and Control cables.

● Handling the Installation, Wiring, Dressing and Termination of Distribution Boards.

● Handling the Testing and commissioning of Electrical Equipment’s.

● Knowledge of Ups and battery charger.

● Trouble shooting and maintenance of different types of MOV.

● Prepare and implement the maintenance routine schedule and keep the record.

● Maintain the daily maintenance activity record.

2. Construction

● Handling of all site activities related Electrical department and solving all technical problems as per KNPC specifications.

● Supervision of all electrical activities (Installation of Electrical equipment’s like switch gear and transformers).

● Planning and Scheduling of different types of electrical cable laying works. (CFP around 79000 Mtr Cable pulling completed).

● Industrial lighting and small power installation work, Inspection of all the Electrical installations.

● Dealing with QA and QC Dept. for the assurance of good quality of the job as well as closing of pack.

● Cable laying, glanding & termination activity of LV and HV cables and to carry out continuity test and functional test.

Area of Expertise

● In charge of temporary power facilities for all kind of construction activities like Piping, Civil, Mechanical equipment, all the site offices and hydrotest activities. Calculation of the total power requirement of all department, Preparation of material take off, Procurement of electrical cables, Main distribution panels, Submain distribution panels, etc…

● Pre-commissioning activities like solo run and rotational test of the motors, preliminary lighting start up(circuited by circuit) and illumination test with QC.

● Supervising of the facilities at the site from the initial Earthing works to the commissioning stage of the unit.

● Following up for the verification / approval of technical problems as per project specification and drawing.

● Participating in HSE seminars for the site safety requirements and implementing the project HSE procedure and explaining work force for finishing the project without LTI (Lost Time Injury).

● As the part of MEW 11 KV construction activity, managed surveying, excavation, cable laying, backfilling and termination of 11 KV HT cables as per the procedure of Joint Operation Project and KOC.

● Associated work of re-routing the 11 KV inside the area of CFP (KNPC), Removed the 11 KV OHL and installed the HT cable as per KNPC procedure.

● Handling the HT and LT transmission lines.

● To co-ordinate with MEW for commissioning of 11 KV transmission lines and Pole Mounted Transformers.

● To provide entire electrical solution as per requirement.

● To Maintain the daily program report.

● To check the entire work as according to approved drawing.

● Handling of Electrical load sharing as per requirement.

● To provide proper preventive maintenance of Pole Mounted Transformers and Transmission lines (11 KV).

● Supervise the electrician work on round- the clock manufacturing unit.

● Provided all required electrical system technical support.

● Co-ordinate with production department on project progress.

● Identified and resolved causes of equipment malfunction.

● Ensured adherence to all facility safety precautions and procedure.

● Preparing of job safety analysis for the concerned work.

● Preparing, closing and extending work permits for the work.

● Implementation and monitoring of all electrical related works at site.

● Estimates, prepares and assigns the resources such as manpower, materials, consumable, equipment, tools, etc, required for all electrical and related works prior to execution. Updating / weekly status to the project manager.

● Interprets drawings and studies the contract documents and applicable standards or specification prior to execution of any job.

● TECHNICKAL QUALIFICATION

● DIPLOMA IN ELECTRICAL ENGINEERING (KGCE)

● ITES WIREMAN AND ELECTRICIAN.

● SECONDARY SCHOOL LEAVING CERTIFICATE

● PERSONAL DETAILS

● Father Name : Sreenivasan

● Age : 40

● Date of Birth : 31-05-1982

● Nationality : Indian

● Marital Status : Married

● Languages known : English, Arabic, Hindi and Malayalam

● PASSPORT DETAILS

● Passport No : W 4660754

● Place of Issue : Kuwait

● Date of Issue : 4-10-2022

● Date of Expiry : 3-10-2032

Declaration:

I hereby declare that the above furnished details are true to the best of my knowledge and believe.

o Yours Sincerely

● Place: Kuwait

● Date: 7-1-2023

● ANIL KUMAR



Contact this candidate