Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Qibla, 14, Kuwait
Posted:
June 05, 2023

Contact this candidate

Resume:

+965-***-**-***

adxin4@r.postjobfree.com

Kuwait, ***00

S A T I S H P A N U G A N T I

MECHANICAL E N G I N E E R

C O N T A C T S A B O U T M E

Over 25 years’ experience of Project Management, Engineering, Construction, design coordination & Inspection of, Ports, Jetties projects, Power Plants, Heat Exchangers, Pumps, Firefighting, Piping, Boiler for OIL Refineries, Storage Tanks, Aluminum Smelter Plants, Buildings, HVAC, BMS, Firefighting systems & Also, Cathodic Protection. Ability to perform Multi role tasks in Mechanical & Civil Engineering. Familiar with high standards of QA/ QC Inspections, Safety requirements, SAZ certified, CPR trained & certified engineer, Certified ASG-KU Environmental officer training Course. Corps of Engineers and Naval Facility Engineering Command Training course in CQM for Contractors.

P E R S O N A L

D E T A I L S

Date of birth

04.06.1972

Nationality

Indian

Visa status

valid

Marital status

Married

D R I V I N G

L I C E N S E

Driving license category

Light vehicle ( Kuwait)

W E B S I T E S &

S O C I A L L I N K S

S K I L L S

Project organization

Team building

Supervision

W O R K E X P E R I E N C E

CONTRACT REPRESENTATIVE, AGP (KNPC- C/1455), Mina Abdullah. Kuwait Mar 2021- Present

• Responsible for the Construction & Mechanical Maintenance of Marine facilities of KNPC under the contract - C/1455.

• Responsible for maintaining daily liaison with and comply with instructions received from the KNPC Superintendent for all necessary liaison and coordination in connection with the Contract on Contractor’s behalf.

• Manage & control Maintenance activities (SHU- Oil Jetty, Pumps, Loading Arms, Underdeck structure, Pile lines, Piles); (MAB Sea Island- Construction & Maintenance of Boat landing Fender structures at MD1 & MD6, Loading Platform structures, Piles, Rafts, Pumps) & allocation of resources at Sites comprises of more than one refinery/location.

• Attend review meetings with KNPC management, prior to start of each task.

• Coordination with AGP team (QC, Welding inspector, Coating Inspector, TPI, Mechanical/Civil Supervisors) for effective implementation of work procedures.

• Follow-up work assignment towards the performance of the Works, at all times, from start of that assignment until completion and handing over of that assignment to KNPC.

• Prepare activity MS, Survey reports, execution plans, CTRA and share with KNPC and attend review meeting with KNPC representative.

• Attend review meetings with KNPC management, prior to start of each task.

• Prepare CAD drawings & job completion forms & Follow-up for invoicing with KNPC.

• Responsible to implement & strictly adhere to Work Permits & KNPC HSE Regulations and Kuwait Environmental Public Authority Regulations at site. PROJECT MANAGER, Sahraa Al Rolla/Kuwait, Ahmadi, kuwait Jun 2020 – Mar 2021

• Responsible for establishment of Petroleum Industry Company (PIC) lab facility for KNPC

(EQUATE Project).

• Design/ develop HVAC Utilities services, for Lab facility with complete operation controlled by PLC/BAS/SCADA.

• Carry out design review of all mechanical and HVAC services on site and to monitor the activities of the contractors to ensure the work is completed on time and to budget.

• Revising process and engineering changes and other activities within the plant.

• Assessing construction activities and granting them approval if falling under plans specifications.

• Designing other utilities and facilities for construction undertakings.

• Coordinate with client (PIC) and other field staff for effective understanding and execution of project.

• Ensuring the project adhere to all government (MEW) and industry standards and guidelines (ASHRAE).

Excellent communication

Computer Proficient

Proficiency in Site

management and time

management

Results-oriented

L A N G U A G E S

English

Hindi

R E F E R E N C E S

Mr. David V. Schmidt, P.E.

Contracting Officer

Representative

USACE

Chester Rosenbaum, COR

USACE (Kuwait)

• Carry out a detailed assessment of the construction work involved and assess the available resources and possible constraints in its execution. Assistant Manager, TOA CORPORATION

Scope: The scope of work involved refurbishment of Breakwater & demolition of 1no’s Offshore Cargo pier and construction of 2 new Offshore cargo piers for US army. Retrofitting of MEP utilities, ship to shore utility services, firefighting system and construction of Harbor house and associated buildings. Client: US Army Corp of Engineers(USACE)(Refurbishment of Breakwater, Construction of new Jetty & Buildings for US Army, USACE), Kuwait PROJECT VALUE: 48 Million US $

July 2017 - Jun 2020

• Managed the demolition of 1.2km Breakwater wall, concrete deck and 2 no's cargo pier using specialized cold cutting method.

• Retrofitting of MEP utilities on the Breakwater and 2 nos Cargo Piers.

• Coordinate pile load test and conducted Pile driving (932mm dia) using PDI equipment. Preparing of test log and compiling pile test reports.

• Coordinate with civil team for the modification/fabrication of steel Pile toe for resistance. Testing of all pile weld joints & Pile caps prior to concreting.

• Manufactured and produced medium sized steel floating pontoons considering the buoyancy.

• Installation of Pier furniture- Bollards, Pins, Fenders.

• Coordinate with Harbor Master on daily basis for the movement of material barge and ensuring no interruption is caused to the movement of Naval Vessels.

• Coordination with breakwater civil construction team for the utility/MEP services.

• Responsible for the Installation of Anodes. Preparation of Dive plan.

• Coordination with divers on day to day basis for the installation of Anodes as planned

& Testing of Anodes post installation.

• Worked closely with the USACE QA team to ensure definable features of work met contract requirements and managed quality using the three-phase control process and documented preparatory, initial, and follow-up inspections with all stakeholders • Developed an effective QC Program by ensuring construction is performed in accordance to plans, specification, on time, with-in budget and safe work environment.

• Coordination with sub-contractor on Breakwater Mechanical installation ( Plumbing & Fire Fighting) Design and Material submission at Breakwater & Harbor House.

• Ensured site safety operated at the highest levels by implementing the set procedures and method approved by USACE.

• Attending meeting with USACE Engineers to resolve matters related to design review and preparation of response to USACE.

• Hold regular review meetings with the Construction Manager on issues such as HSE conformance and construction progress as well as meetings with the vendors.

• Prepare Preparatory & Initial phase documents for each definable of work activity and conduct meetings with USACE for the activities.

• Perform all daily inspection and test of the scope and character necessary to achieve the quality of construction required in the drawings and specifications for all works under the contract performed ON or OFF site.

• Carry out inspection and checking for all quality related procedures in the site and ensures activity at the site are as per approved method statement and inspection test plan.

• Coordinate with USACE QA team and Site In-charge for inspection and meeting about quality problems including the closure of Non-Compliance Report.

• Report and monitor all activities related to Quality Management System, RMS.

• Taking care of QA/QC documents of the entire project including certificates, calibration, test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other QA/QC documents. Responsible for the closure of Non-conformance, NCR and Site Instruction, SI.

• Responsible for the quality and workmanship of every activity, thorough knowledge of Mr.Mustafa (Project Director),

AGP (Kuwait)

Mr.Haroon, Senior Manager

KNPC, MAB

all phases of engineering construction relating to Civil, Architectural and Structural discipline interfacing the multidisciplinary operations.

• Responsible for all steel fabrication of Breakwater installations. Preparation of Material submittal for approval, inspections & MDS with USACE.

• Develop method statement for the activity including risk assessment and job safety environmental analysis and Inspection Test Plan and Checklist based on specifications of the project.

• Carry out Internal Audit at the site as scheduled in the Project Quality Plan, PQP.

• Establishing ITPs for site activities in line with method statements.

• Identify requirements and scope of work, review specifications, drawings and other documents of the project and establish applicability to the scope of work.

• Carry out a detailed assessment of the construction work involved and assess the available resources and possible constraints in its execution.

• Carry out any other duties as and when required by direct supervisor. Resident Engineer, HPCL (Hindustan Petroleum Corporation Ltd) expansion of refining facility, India

(Expansion of Refinery & Maintenance of Offshore Oil Jetty) Project Value: 200 Million US $

July 2011 - May 2016

• Establish a mechanical/piping design/field engineering working relationship and lines of communication with the Project Manager, including agreement on mechanical engineering deliverables and overall construction & maintenance of utilities application configuration management.

• Responsible for quantity take-off, control, tracking, reporting and forecasting for mechanical discipline.

• Coordinate with the Procurement Organization for field procured materials, material substitution, services and equipment such as tanks and drums, pipe spools, valves, fittings.

• Review material receiving reports and warehousing to assure delivery of correct mechanical materials.

• Coordinate and monitor the interfaces for mechanical data exchange to support the construction automation plan and the project controls program requirements at the jobsite.

• Support the mechanical and piping construction quality program.

• Participate in the preparation of cost estimates for mechanical construction activities and coordinate the preparation of cost reports, forecast and progress reports.

• Coordinate with Field Supervision and Subcontractors to plan/support construction schedules.

• Plan and recommend mechanical and piping procedures to be implemented by Field Supervision to ensure construction operations are within requirements of engineering design and specifications.

• Construction of Power plant, Boilers & Gas Compressor stations, SHELLS, BULLETS.

• Responsible for all the field engineering activities (Planning, Mobilization, Submissions, Approvals, Maintain Records Reports, Welder Qualifications, NCR’s, Attending Progress Meetings, Claims) and assisting Project Manager.

• Coordinate with engineering on constructability and design issues relating to the mechanical discipline and piping discipline such as mechanical equipment installation, piping installation, maintenance, and testing.

Offshore Oil Jetty Maintenance:

• Responsible for planning, directing and supervising maintenance activities of multi- disciplined team personnel in maintaining the Oil Jetty facility to meet all key objectives with a focus on improved maintainability, reliability and availability.

• Set strategies, and standards for Maintenance resources: manpower, spare parts, tools & equipment to increase work productivity and maximize utilization within company standards and strategy framework.

• Review the detailed engineering deliverables from Operations perspective with a particular focus on Performance Standards, Written Scheme of Examination, written scheme of verification and maintainability studies.

• Manage the efforts of the Maintenance disciplines in the review of the detailed engineering deliverables.

• Ensure that the asset is safely maintained in line with all current legislation and practices whist meeting production targets.

• Ensure maximizing the Jetty availability by minimizing asset maintenance downtime in line with safety standards, legislations, integrity standards and industry best practice. Senior Marine Resident Engineer, Worley Parsons, Dubai July 2009 - Jun 2011

Design

• Proposals for identification & FEED of existing and new marine berthing facilities.

• Liaison with client representatives on the Concept Proposals & various stakeholders’ requirements at different sites. •Preparation of preliminary design for CNIA & NAVY harbors facilities.

• Preparation of Quality Assurance documents (PEP, Specification).

• Collate construction rates and Preparation of BOQ.

• Construction of 93 No’s, small and medium size jetties at various locations for CNIA. Maintenance Of offshore Tanker Berth #4

(Development & Enhancement of Fire Fighting, utility pipeline services & Berth Structure)

• Maintain control over the Tanker Berth Maintenance System and associated computer database

• Coordinate periodic maintenance activities with the OIM and other department heads

• Plan the service and maintenance of equipment according to the RMS guidelines

• Ensure that reports for repair and maintenance of equipment are accurate and completed.

• Liaise with the marine department regarding the loading, ordering and use of fuel, potable water, and drill water in consideration of the Berth stability

• Ensure that the permit to work and isolation systems are strictly adhered to in the maintenance department.

• Inform the OIM and other department heads of any technical problems or limitations that may affect the safe operation of the Berth.

• Maintain an adequate supply of spares to fulfil maintenance requirement and facilitate a safe and efficient operation.

• Supply information for maintenance and repair budget.

• Maintain proper communication with offshore-based Field Support group, berth management, and equipment vendors.

• Liaise with the OIM to ensure that all third-party equipment is fit for purpose, certified, correctly installed, and maintained while on the Berth.

• Approve all maintenance department requisition purchase orders

• Supply rig management with maintenance statistics of the vessel.

• Advise on ways of making improvements to the inventory kept on the Berth.

• Document any and all changes to the RMS system and provide reasons for making these changes to Berth Manager via direct supervisor.

• Provide input on the Survey of the vessel and ways to reduce the out of service time of the vessel.

• Exercise fiscal responsibility with regard to maintenance budget.

• Train personnel on the use of RMS system to reduce error in the system.

• Ensure all maintenance personnel receive an annual performance evaluation.

•Recommend promotion or disciplinary action up to and including discharge Other duties as required.

Assistant Resident Engineer, Scott Wilson Kirkpatrick & Co Ltd, Dubai, UAE

(CT-2, Oil Jetty, Tanker berth-4), Dubai, UAE

Project Value: 1.2Billion US $

Jun 2005 - Jun 2011

Container Terminal 2, Jebel Ali Port, Dubai.

• Responsible for the design, specification, material selection and site supervision for the construction of 4 million TEU Container Terminal-2, including building & mechanical services for the new port.

• Preparation, development and review of project quality plans.

• Design & development of the Primary Maintenance Facility for port mechanical plant and cranes.

• Inspection of Fabrication & Construction of Primary Maintenance Facility & 46 no’s Reefer Towers.

• Monitoring the performance of contractors on site.

• Ensuring that work activities have been carried out in accordance with the plans, specifications and industry standards.

• Effect close Liaisons with client reps (DPW & EHS) to resolve matters related to design

& progress on site.

• Coordinate with Gantrex/Gantry for the installation of crane rails for Quay crane & RMG's and Inspection/testing of rail welds.

• Ensuring that tests and inspections are performed.

• Liaising with construction management to remove any hazards associated with work activities.

• Ensuring that delivered materials meet specifications and established quality standards.

• Initiating and maintaining records, back-charge procedures, progress reports, and so on.

• Tracking & response of RFI’s

• Inspecting Installations of HVAC, Fire suppression systems, potable water, utility services, BMS System. And Quay crane & RMG rail.

• Effect close Liaisons with client reps (DPW & EHS) to resolve matters related to design

& progress on site.

• Co-ordination of project audits and initiate post audit actions.

• Compliance with corporate Health & Safety management system. Represented SW on all safety review meetings with client.

• Review of contractor safety & health plans, risk assessment plans.

• Testing & Commissioning of HVAC, Plumbing works, BMS, Fire Fighting System.

• Coordinating with contractor for As-Built Drawings & the preparation of O&M manuals, in a manner suitable to the client.

Oil Jetty - Djibouti, Africa

• Supervision of the construction of a new jetty at ‘Doraleh Oil terminal’ for Dubai Ports International (DPI).

• Supervision of Steel fabrication, driving of steel piles and the construction of trestle, platforms, Connection Bridge, walkways, equipment’s and the dolphin structure.

• Ensuring all the works shall fully comply with all relevant contractual and technical requirements specified in the specification and the relevant standards (ASME, AWS, and ASTM), Drawings and the contract.

• Witness and approve the testing of qualification of welders, welding procedures for the fabrication and installation of pipe piles.

• Supervision of package air-conditioning, Fire suppression, potable water, and utility services installations for Buildings & Jetty area.

• Coordinating with contractor for As- Built Drawings.

• Review of contractor safety & health plans, risk assessment plans. Mechanical Inspector, Dubai Aluminum, (DUBAL), Dubai, U.A.E., Dubai, UAE Project Value: 1Billion US $

May 2002 - Jun 2005

• Supervision of fabrication, construction and commissioning of four Fume Treatment Plants with storage tanks, Pot room structural steel, piping.

• Erection and commissioning of Fans, motors, blowers, and EOT cranes installation/welding of crane rails.

• Supervision of Air Conditioning, Fire suppression systems, MEP WORKS potable water, and utility services installations for DUBAL ‘KESTERL’ plant expansion project.

• Construction of Alumina storage tanks (primary & secondary tanks).

• Construction of in-house STP at DUBAL with a treatment capacity of 35K (m3/h).

• Installation of Mechanical equipment’s, ID, FD fans and their balancing.

• Installation of conveyor, alignment and commissioning.

• Repair and construction of Anode block plant.

• Supervision of welding Aluminum Bus-bars all along the pot rooms.

• Coordinating with contractor for As- Built Drawings & the preparation of O&M manuals, in a manner suitable to dubal.

Project Engineer, Galadari Engineering Works, Dubai, U.A.E., Dubai, UAE May 2000 - Jun 2002

• Review of contract documents.

• Coordination for drawing preparation, Material submissions, Fabrication.

• Coordination with client/consultant for material, drawing approval and attending progress meetings.

• Conduct on-site reviews, control and monitor project cost, prepare & determine avenues for recovery of claims on account of mid- course contractual changes.

• Monitor contract obligations and oversee and coordinate commercial and safety issues.

• Supervision of Mechanical installations.

Projects include:-

• Qatar Vinyl project (Doha).

• Dubai Airport jobs (Concourse building Package air-conditioners, potable water, and utility services).

• Dubai Internet city.

• Sheikh Zayed University (Abu Dhabi). Marina sales pavilion (EMMAR).

• Fabrication & erection of Foot Bridge across SHEIKH ZAYED ROAD between FAIR MONT Hotel & World Trade Centre (Dubai).

• H-Station (DEWA).

• AL-Raha Theatre (Abu Dhabi).

• Civil Aviation Head Quarters (Dubai civil aviation, DCA).

• Dubai Oxford School (Turnkey project).

• Dubai Convention Centre (Erection of roof trusses).

• Construction of HELICOPTER HANGERS for UAE Defense at Abu Dhabi, UMM AL NAR. Site Engineer, Cleveland Bridge & Engineering, Dubai, U.A.E., Dubai, UAE July 1998 - May 2000

• Responsible to project manager.

• Construction of Pot room Buildings for Dubai Aluminum Co.

• Construction of Power Generation Building & Mechanical Installations.

• Fabrication & Installation of Fume Treatment Plant’s, alumina handling system, process piping & Equipment erection.

Resident Engineer, Artson Engineering Ltd, Bombay, India., Bombay, India Apr 1993 - Jun 1998

• Construction of atmospheric above ground storage tanks, shell plate erection on going by jacking method.

• Coordinating fabrication and erection activities for the tanks.

• Coordinating shell course shifting from fabrication yard to tank area.

• Preparation/coordination in getting approval of daily inspections from the client.

• Getting the mechanical clearance for testing, commissioning of all tanks.

• Supervise and manage the subcontractors for the construction of storage tanks and report to engineer.

• Monitoring the tankage job as per required by client.

• Responsible for the tanks hydro test activities.

• Lead and coordinate with the QA/QC in all quality related aspects.

• Review the approval documents about Inspection Test Plan of the project to ensure inspection shall be in accordance with the required quality standard and procedures.

• Execute and submit inspection documentation works for static and rotating equipment’s to assure that the required forms used in testing submitted are approved by client representative as per ITP such as:-Installation checklist for static/rotating equipment’s-Leveling/alignment recording forms for horizontal and vertical package type-Axial/radial, soft foot parallelism forms for pumps and compressors. Construction of Steel tanks for GAIL Oil Refinery, Jamnagar.

• Construction of High Pressure Boilers for BP Refinery Ltd,, Jamnagar.

• Construction of Power plant, Boilers & Gas Compressor stations.

• Installation of various types of Boilers (FBC, CFBC, and WHRSG) for power plants.

• Conversion of boilers.

• Installation of Gas Turbine Compressor and Auxiliaries for Gas Authority of India

& Hindustan Petroleum Corporation.

• Responsible for all the field engineering activities (Planning, Mobilization, Submissions, Approvals, Maintain Records Reports, Welder Qualifications, NCR’s, Attending Progress Meetings, Claims) and assisting Project Manager.

• Coordinate with engineering on constructability and design issues relating to the mechanical discipline and/or the piping discipline such as mechanical equipment installation, piping installation, maintenance, and testing. E D U C A T I O N

Bachelor of Science, Rural Engineering College, Karnataka, India 1992

• Bachelor’s Degree in Mechanical Engineering, Karnataka University, India, C O U R S E S

ASG-KU Environmental Officer (EO) Training Course, US ARMY, Camp Arifjan, Kuwait

July 2019

Quality Control Management for Contractors # 784, USACE Oct 2019

Corrosion Prevention & Control Management, NACE

Oct 2019

International Plumbing Code (IPC) by, International Code Council May 2020

Introduction to HVAC System, ASHRAE

May 2020

Control Valves and Dampers, ASHRAE

May 2020

Ventilation and IAQ, ASHRAE

May 2020

DDC Specification, Installation and Commissioning, ASHRAE May 2020

Load Calculation, ASHRAE

May 2020

FISCHER WEBINARS for MEP installations

Dec 2020

Serious About Zero(SAZ), Worley Parsons

Feb 2010

certilicate Tra

Has successfully completed the ASG-KU Environmental Officer (EO) Training Course in accordance with AR200-1, KFGS, and the OEBGD. Completed on the 28t' day of July, 2019

Ancy Shyno

Environmental Supervisor/Instructor

In Witness Hereof:

Oovi¥2?evir

David Lewis

Environmental Manager

Camp Arifjan, Kuwait

PANUGANTI SATISH

MED0 12000394

has completed the Corps of Engineers and Naval Facility Engineering Command Training Course CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS - #784 Kuwait City, Kuwait

Location

10 13 October 2019

Training Oate(s)

Middle East District Joseph C. Holm

I nstr uctional District/ NAVFAC CQM-C Manager

Joseph C. Holm

Facilitato I / I net ructo r

adxin4@r.postjobfree.com. mil 540-***-****

Email Telephone tacit itator/l nstructor S ignotu re THIS CERTIFICATE EXPIRES FIVE YEARS FROM DATE OF ISSUE NACE International acknowledges that

SATISH PANUGANTI

has successfully completed the

Corrosion Prevention and Control Management e-Course and has earned 2 professional development hours.

10/02/19

Pamela Nicoletti, Education Director

This certificate of Completion denotes successful completion of the NACE course,

•• I N T E & N A T I O N A L

2018 IPC Series: Chapters 1, 2 and 3

at n/a

on 19 April, 2020

0.15 CEU

satish Panuganti

1010-19724

n/a

IC9704

yes

2018 IPC Series: Chapters 4, 5 and 6

at n/a

on 19 April, 2020

0.15 CEU

satish Panuganti

1010-19725

n/a

IC9759

yes

2018 IPC Series: Chapters 7 and 8

at n/a

on 19 April, 2020

0.15 CEU

satish Panuganti

1010-19726

n/a

IC9627

yes

2018 IPC Series: Chapters 9 and 10

at n/a

on 19 April, 2020

0.15 CEU

satish Panuganti

1010-19727

n/a

IC9761

yes

Satish Panuganti

Introduction to HVAC Systems (SI), 3.5 PDHs (AIA), (GBCI) 3.50 May 5, 2020

Satish Panuganti

Control Valves and Dampers (SI), 6.5 PDHs (AIA)

6.50 May 6, 2020

Satish Panuganti

Ventilation and IAQ (I-P), 3.0 PDHs (AIA), (GBCI)

3.00 May 7, 2020

Satish Panuganti

Load Calculations (I-P), 1.5 PDHs (AIA)

1.50 May 8, 2020

Satish Panuganti

DDC Specification, Installation and Commissioning (SI), 4.5 PDHs (AIA) 4.50 May 8, 2020

WorleyParsons

resources & energy

28 September 2009

Mr. Satish Panuganti

P.O. Box: 44169

Abu Dhabi

U.A.E.

Dear Mr. Panuganti,

OFFER OF EMPLOYMENT

WorleyParsons Engineering Pty Limited

PO Box 44169

Abu Dhabi

U.A.E.

Telephone. •971 2 676 643a

Facsimile: •971-*-***-****

Web www.worIeyparsons com

Ref: WAD/LX/903/09/101

File: Personnel & Finance

WorleyParsons has much pleasure in offering you an international assignment with WorleyParsons Dubai. This letter, together with the enclosures, confirms the terms and conditions of this employment offer.

Changes to conditions

The terms and conditions described in this Schedule and attached Employment Contract — General Conditions, are current at the date of the assignment. WorleyParsons reserves the right to modify employment terms as business conditions change. In this event, you will be notified in advance of the changes and how they will affect the current arrangements. Should you be transferred to other projects, the terms and conditions may be reviewed/modified and be mutually agreed to reflect updated WorleyParsons policies. To indicate acceptance of this offer please review, initial and sign the accompanying Employment Schedule and Employment Contract — General Conditions. The Employment Schedule sets out all remuneration and employment details and should be read in conjunction with the Employment Contract — General Conditions and the project specific terms and conditions, as applicable. Please return one signed copy to Human Resources at the above address; the other copy is for your records. Please note that this offer will lapse if not accepted within 7 days. Should you require additional information or clarification, please do not hesitate to contact the undersigned or Rudolf D’souza in the Abu Dhabi office. Yours Sincerely,

WorleyParsons Engineering Pty Limited

”Ge

enc

n

eLal Manager

1. Employment Schedule

2. Employment ontract — General Conditions.

Ref. 903 Offer Lefter for S a fish Panuganti Page 1 E Nomics Jul" reeman.

Scott Wilson Kirkpatrick g Co Ltd j,g t

P.O.Box 11893, Dubai

United Arab Emirates

Tel (04) 3451615, 3453656

Fax (04) 3458872

Email: adxin4@r.postjobfree.com

Website: www.scottwilson-me.com

Your Reference

Our Reference: DO/1655

Date: 20* JulV 2004

Dear Mr Satish,

This has reference to the terms of employment as Site Engineer offered by us and accepted by you on the 17* July 2004.

Further to us receiving approval from the client for your employment as “Site Engineer” on the Djibouti Project, we are pleased to confirm your appointment on this project and you are expected to start on site, in Djibouti, on Saturday 31" July 2004. We confirm receipt of your passport copy and the certificate of vaccination against yellow fever. These documents have been forwarded to our client’s office in Djibouti for processing of your visa. They have informed as that they do not foresee any difficulty with obtaining a visa. We will inform you as soon as the visa is available. We have made a flight booking for you on Thursday the 29" July 2004 from Dubai to Djibouti by Dalo Airlines, departure 0400 hours and arrival in Djibouti 0600 hours. If you have any further queries, please contact Catherine in our office Yours faithfully,

Scott Wilson Kirkpatrick & Co Ltd

Regional Director.

Part of the worldwide Scott Wilsw consultancy group Registered in London: No. 880328 Registered Qffloe: Scob House, Basing View, Basingstoke, Hampshire, RG21 4JG Other Offices: Abu Ofiabi, Al Ain, Bahrain, Oatar and oyer 20 Entries worldwide 14. HOML ENGINEERING LTD.

Ingram House, Al lensway, Thornaby, Stockton-on-Tees, Cleveland, U.IN. TS 17 9HA Telephone: (01 642) 7fi5421 Teletax: ((I1 ñ42) 762809 E mail: enquiry ñ+khe.co.uk

rlease reply to :

c/o Dubai Aluminium Co. Ltd.

M•a jor Pro,jects

P.O. Box 3627, Dubai, U.A.E.

Tel : +971-*-*******

Fax : +971-*-*******

E-mail: khedubai H emirates.net.ae

TO WHOMSOEVER IT MAY CONCERN

THE 0!



Contact this candidate