|
Resume alert |
Resumes 31 - 40 of 132 |
Al Dafna, Qatar
... Umm Al Houl Power Plant (IWPP) – Production capacity of 2,520 MW of power and 136.5 MIGD of potable water Scope of activity – Turbine erection, testing and commissioning 2. 89 substations (400, 220, 132 & 66KV Substations) contain civil building ...
- 2022 Aug 06
Al Dafna, Qatar
... Buggy motors, Conveyor motor, Turbine (blasting) motors, Pump Motors, bridge crane motors, dust collector motors and brush machine motors. 12. Inspect regularly of the active sensors. 13. Adjust the approximate sensor and door limits. 14. Check the ...
- 2022 Jul 24
Al Dafna, Qatar
... oHandling various electrical interface for mechanical packages like Gas Turbine Generator, instrument and air compressor package, Deluge skid, Electric heaters, Electro chlorination package, Flare package etc., oProvide Inputs to other disciplines. ...
- 2022 Apr 23
Al Dafna, Qatar
... Project: 2x630 MW Godavari Gas Power Plant at Kakinada, Andhra Pradesh Position: Site Engineer Client: Spectrum Power Generation Limited Responsibilities: Execution of Bore Piling 2,500 nos and structure of Steam turbine and Electrical Annex ...
- 2022 Apr 04
Doha, Qatar
... Baker Hughes CLIENT: QAFCO – Qatar Fertilizer LOCATION: Mesaeed POSITION: EHS Specialist PROJECT: Ammonia – 6 Compressor & Turbine Major Inspection DURATION: February 2022 – Tll Date EMPLOYER: Brunel Oil & Gas CONSULTANT: Schlumberger, Well Testing ...
- 2022 Mar 19
Al Dafna, Qatar
... Al Issa/Kuljian Int’l Consulting Engineers (Riyadh, K.S.A) Site Electrical Inspector March 2005 – April 2007 Project: (4X600MW Steam Turbine Generator) Oil Fired Power Plant for Stage II Phase 2 under project of Saudi Electricity Company (SEC-WR) ...
- 2022 Mar 02
Ain Khaled, Al Rayyan Municipality, Qatar
... High Rise Building November 7, 2014 – Doha Qatar • Seminar on Overview of Essential Electrical System for Hospitals • Gas Turbine Combined Cycle Power System • Basics of LED and the Application of LED Lighting June 06, 2014 – Doha Qatar • Seminar on ...
- 2022 Feb 28
Al Dafna, Qatar
... For the wind the vertical turbine used when the pass the vehicle near the turbine the rotated to generated the electricity. And the turbine located on the divider. PROJECT: ONE WHEEL BALANCING SCOOTER. Details: This is the project I completed work ...
- 2022 Jan 17
Al Dafna, Qatar
... Supervision & Installation of HVAC, Plumbing [Water Supply, Storm, Sanitary Drainage, Firefighting, Waste Heat Recovery Unit, Compressors, Pumps, Blowers, Turbine & Nozzles. UNIVERSITY PROJECT: B.Sc Project: Design and Fabrication of Demonstration ...
- 2021 Sep 07
Al Dafna, Qatar
... (QEWC), 262 MW Gas Turbine Power Project with GE, RAS ABU FUNTAS, Al wakra, through ABB AG Germany. KHARAMAA 220/132/66/11/0.415KV Substation Projects with ABB, SIEMENS,AREVA,SCHNEIDER ELECTRIC. Hotel, Mall,Hospital and High Rise Building. PERSONEL ...
- 2021 Aug 05