Al Dafna, Qatar
... Practices • Basic Aerodynamics • Human Factors • Aviation Legislation • Aeroplane Aerodynamics, Structures and Systems • Gas Turbine Engines Details AL-Ghrafa, Doha, Qatar, +974******** adfklj@r.postjobfree.com Date / Place of birth 18.05.1996 Doha ...
- 2020 Aug 25
Al Dafna, Qatar
... oHydrogen cooled GE Frame 9FA Gas turbine Generators up to 280 MVA and SIEMENS SGEN5-2000H Gas turbine generators up to 480 MVA, maintenance and major shut down events / breakdown maintenance / Preventive maintenance activities. oFamiliar with Black ...
- 2020 Aug 22
Al Dafna, Qatar
... Design of wall beams, cladding supported beam & staircases for Turbine generator building. Project: KHAPERKEDA THERMAL POWER STATION EXPANSION PROJECT (1 X 500 MW) Client: MAHAGENCO Analysis & design of elevator (lift) and staircase. Analysis and ...
- 2020 Aug 20
Al Dafna, Qatar
... of experience in handling Power Plant Boilers with DCS & Field Operation (Water Tube Boiler, Fire Tube Boiler, Turbine Driven Feed Pumps, Turbine Driven Centrifugal Air Compressors, Water Treatment Plant, Fuel Gas System, De-aerator, LP & HP Dosing, ...
- 2020 Aug 13
Fereej Ibn Dirhem, Qatar
... Checking and replacement of Scanners Checking and Maintenance of Fire Suppression System of Turbine. Control Valves: To remove, dismantle, overhaul/repair install electronic, pneumatic or hydraulic instruments control system such as control valves ...
- 2020 Jul 26
Doha, Qatar
... Assist Solar Turbine vendor in the maintenance and troubleshooting of defective instrument devices to be replaced during operation. HUNDAY HEAVY INDUSTRY (H.H.I) ESCRAVOS, NIGERIA Escravos Gas Project Phase 3: E.G.P 3 April-December 2009. Instrument ...
- 2020 Jul 26
Fereej Ibn Dirhem, Qatar
... carried out by the various Contractors for a complete E&I activity of the following Power Generation Units: 5.1.1 Steam Turbine Generator (STG 1&2) - 136 MW each, Rolls Royce 5.1.2 Combustion Turbine Generator (CTG 1&2) – 58 MW each, Seimens 5.1.3 ...
- 2020 Jul 17
Fereej Ibn Dirhem, Qatar
... Major Modules: PGC Module (1.10 MMSCMD), Compressor Module (0.03 MMSCMD), Separator Module (42000 BLPD Liquid Handling), MOL Pumps, Gas Dehydration Unit, PWC System (30000 BWPD), Gas Sweetening Unit (1.10 MMSCMD), Gas Turbine Generator (3x2.5 MW ...
- 2020 Jul 16
Fereej Ibn Dirhem, Qatar
... system, concrete overflow channel with huge capacity for water discharge, 3000m3 of concrete foundation of gas turbine generators, 3500m3 of reactors foundations and columns and heavy slab, pipe racks, transformers and water filling stations. ...
- 2020 Jul 13
Fereej Ibn Dirhem, Qatar
... Operated Auxillary boiler capacity of 120T/hr at 46 bar and 385 degree Celsius Worked with Steam turbines generator -power generated normal 32MW/64MW Operating Gas turbine (GE MS6001B MARK VI) capacity of 40 MW 3 stage 5162 rpm 10 reverse flow ...