|
Resume alert |
Resumes 31 - 40 of 40 |
Kitchener, ON, N2G 3M4, Canada
... Report), CAR/SCAR (Corrective Action Request), PPQP, FMEA (Failure Mode and Effects Analysis), PPAP, APQP, 5S, 8D, Lean Manufacturing, Green Belt Six Sigma. - Experience of data collection, analysis and reporting using Microsoft Office, Oracle ...
- 2013 Apr 01
Waterloo, ON, N2M 2H2, Canada
... Linamar Gear Quality Engineer 2007-2012 • APQP,QMS,PPAP • Customers and Suppliers relationship, problem analysis, corrective actions implementation and continuous improvement. Vehcom Manufacturing Quality Engineer 2006-2007 • Liaison with customers ...
- 2012 Oct 08
Guelph, ON, N1L 0C8, Canada
... Correspond customer request (such as PPAP, application questions etc.) in a timely manner. 3. Review customer RMA request and disposition the customer returns. 4. Review/follow up corrective action report and assure that all the actions had been ...
- 2012 Aug 07
Elmira, ON, N3B 0A7, Canada
... • Generating and maintaining part qualification requirements(APQP/PPAP); • Generating and maintaining procedure and related documents; ENGINEERING, AUTOMOTIVE INDUSTRY, QUALITY CONTROL AND ASSURANCE KW Leather Products Ltd (2007-2008) Seats and ...
- 2012 Jul 12
Guelph, ON, n1k 1j6, Canada
... 000,000 to 3.4 million highly automated lines Planed cell layout, process flows and estimate line balance Participated in APQP, PPAP, PFMEA, Control Plan, Process Flow and DFMEA meetings Manufacturing support with a “hands-on” approach MANUFACTURING ...
- 2012 Jun 05
Brampton, ON, L7A 3C1, Canada
... ( TS 16949), Brampton ON Mar 2010 – Present Quality Manager • Preparing all PPAP and maintaining Quality documentation (PFMEA, PCP, PFD, Hold log, Non –Conformance log) • Supervising three Metallurgists. • Preparing recipes for heat treatment ...
- 2012 Apr 10
Kitchener, ON, N2N 3R9, Canada
... Expertise in • AIAG Quality System tools - APQP, PPAP, FMEA, CP, SPC and MSA • Implementing and Maintaining ISO 9000:2008, ISO14001 and TS16949 – IRCA Certified Auditor • Root Cause analysis – 8Ds, 5P, A3 and CAR reports • Developing Suppliers for ...
- 2012 Mar 24
Milton, ON, L9T 6A7, Canada
... • Led cross functional teams focused on FMEA’s, PPAP, APOPS, PFD’s, control plans and yield management. • Managed programs through the APQP process achieved a 94% yield and a 90% utilization as per business plan. • Established and conducted quality ...
- 2012 Feb 18
Kitchener, ON, N2E 3K6, Canada
... reciprocators and hand spray • Resistance welding, Mig Tig, automated seam welding Manufacturing Competencies • Conduct business in accordance to: o Ministry Standards, OHSA requirements WHMIS o APQP, PPAP, FMEA, development and implementation. ...
- 2012 Jan 07
Kitchener, ON, N2N 2M7, Canada
... and application • GD&T certified by General Motor/Jiao Tong Technology Institute • AIAG trained and certified in QS9000 quality system, Six Sigma & Lean Manufacturing including QSA, PSA, FMEA, APQP, MSA, SPC, 6 sigma, PPAP, DOE, and 16 STEPS, etc. ...
- 2011 Nov 30