|
Resume alert |
Resumes 1 - 10 of 12 |
Dover, NH
... weekly basis Page 2 ELECTRICAL PROJECT MANAGER NORTHERN ELECTRIC INC (NEI) JAN 2022- MARCH 2023 · Material and equipment procurement · Submittal preparation and review · BIM Coordination drawings prior to construction to avoid clash with MEP trades. ...
- Jan 20
Andover, MA
... (US), RightsFlow (US), Zagat (US) Postini (US and CH), Simplify Media (CA) •Oversaw $3.1M budget, construction, MEP, and project team comprised of internal and external resources to design and build two on-campus Chromelabs in Mountain View. ...
- 2022 May 25
Exeter, NH
... Applied for and received $80K Grant from State of Florida for worker training through Florida MEP. Blackmer, a Dover Company, Grand Rapids MI April 2003 to May 2008 Plant Manager Responsible for all aspects of operation of $60MM per year sales in ...
- 2019 Mar 11
Portsmouth, NH, 03801
Maryellen Powers Rye Beach, NH ***** 603-***-**** ac3rss@r.postjobfree.com www.linkedin.com/in/powersmaryellen SR. EXECUTIVE ASSISTANT Professional Profile ●Versatile and seasoned 6-year administrative professional for C-level executives and...
- 2017 Dec 20
Durham, NH
... My work in various companies has garnered local awards from Mass MEP and national awards from the Association of Manufacturing Excellence (AME) for work with Lean Processes and ERP system. Led implementation or worked with SAP, Oracle, ASK ManMan, ...
- 2017 Oct 09
Salem, NH
... 2008 to present) Reporting to CFO/Managing Principal, responsibilities include: Managing corporate human resources function for 200 person MEP Consulting Engineering Firm (5 offices and 12 business units based in MA and NC); day-to-day generalist ...
- 2017 May 23
Lawrence, MA
... Collaborated with structural engineer to conceptualize completion, analyzed MEP, parking and permit requirements and presented budget proposal to corporate. Obtained green light; $3M in approved contingency funds ensured profitability. VALUE ...
- 2016 Jul 12
Epping, NH, 03042
... Groveland, MA Facilities Drafter II 2/2011-12/2012 • Updated facility drawings in CAD LT 2005 and converted them to Solidworks • Created a floor plan, MEP, Fire, Roof, and a plan that detailed over a hundred different machines • Worked with 5S team ...
- 2013 Jan 23
Epping, NH, 03042
... Groveland, MA Facilities Drafter II 2/2011-1/2012 • Updating facility drawings in Auto CAD LT and converted them to Solidworks • Created a floor plan, MEP, Fire, Roof, and a plan that detailed over a hundred different machines • Establishing company ...
- 2012 Aug 01
NH, 03036
... Extensive Managerial Experience in Tunnel and Bridge Construction, Logistics, Contractors, MEP coordination, Equipment, Trucking and Crane Utilization, Precast, Structural Concrete and Post tensioning. Slip form Concrete and Asphalt Paving, Milling ...
- 2011 May 15