Post Job Free

Coal resumes in Bengaluru, Karnataka, India

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 41 - 50 of 149

Mechanical Assistant

Vasant Nagar, Karnataka, India
... Sufficient experience to handle LATHE, MILLING machine, Electric furnace, Coal furnace and Gas furnace and other mechanical instruments to a research level. AREAS OF INTEREST Material science Additive Manufacturing Mechanical Design Business ... - 2020 Sep 04

Electrical Plant

Vasant Nagar, Karnataka, India
... Past Responsibility UltraTech Cement Ltd., Rawan Cement Works, Baloda Bazar, Chhattisgarh, from 24th Nov’94 – 29th Sep’17 Job Profile: Maintenance of Electrical equipment in Kiln, Coal mill, Raw mill, Cement mill, Slag grinding & Packing plant as Sr ... - 2020 Aug 18

Engineer Piping

Vasant Nagar, Karnataka, India
... Erection & Hydrotesting 14Years of Experience PROFILE SUMMARY Gained overall experience in refinery and power with hands-on experience in: oFuel Oil System Piping: HFO & LDO Tank, coal Handling System-Piping, Compressor Piping & DG Piping; ... - 2020 Aug 04

Power Plant Engineer

Vasant Nagar, Karnataka, India
... Hands on experience in Thermal Power plant (Coal, Bio Mass and Solar based plant) Exposure to Combined power cycle power plant and BFG boilers. Exposure to ASME/ANSI/ IS, ISO, API, HEI, NFPA and TAC Codes and Standards for Power and Process Piping., ... - 2020 Jul 13

Power Plant Project Coordinator

Karnataka, India
... (Erection of economizer assembly, All Compartment Air nozzle, Coal nozzle & PA Pipeline) ACC Limited, Chaibasa - 1 x 75 TPH Captive Power Plants, CVL make. (Erection of economizer assembly, Boiler flue gas duct) Chettinad Cement Ltd, Kallur works - ... - 2020 Jun 25

Engineer Power Plant

Vasant Nagar, Karnataka, India
... Project name : CIREBON 2, 1x1000MW COAL FIRED POWER PLANTPROJECT, INDONESIA End user : CIREBON POWER Client : TECTON 2. Project name : 0.2MTPA COKE OVEN PLANT ELECTRICAL EQUIPMENTS Client : Kirloskar ferrous industries limited Organization : AL ... - 2020 Jun 12

Manager Engineering

Vasant Nagar, Karnataka, India
... Presented Poster at World Petro Coal Congress, Conference and Exhibition, New Delhi in 2017. Represented University among TOP 13 universities throughout ASIA in Woodside Innovation Challenge 2018. First Position in Technical Group Discussion ... - 2020 Jun 03

Engineer Mechanical

Vasant Nagar, Karnataka, India
... in conducting hydraulic test for water tube boilers Commissioning of package boilers from 500kgs to 4500kgs/hr (husk & coal fired boiler) Erection commissioning of husk, coal/wood fired boiler capacity up to 4000kgs/hr Involved in following ... - 2020 Jun 02

Power Plant Mechanical Engineer

Avaragere, Karnataka, India
... 1st Project: 1.2 MTPA Pellet Plant Pelletisation Plant having a capacity of 1.2 MTPA with Additive Grinding unit, Mixer, ESP, 3 no’s of Balling Unit, Travelling Grate Chain Building, 5*35 mtrs Kiln and 69m2 Annular cooler & Pulverized Coal Injection ... - 2020 Jun 02

Engineer Plant

Vasant Nagar, Karnataka, India
... make, Fuel- Coal fired, Traveling Grate Steam Turbine – 2 MW Triveni make, Back Pressure Turbine. Maintenance of utilities like screw compressors, reciprocating, air compressors, Twin lobe blower, Centrifugal pumps, reciprocating pumps screw pumps, ... - 2020 May 27
Previous 2 3 4 5 6 7 8 Next