Post Job Free
Sign in

Power Plant Engineer

Location:
Vasant Nagar, Karnataka, India
Posted:
July 13, 2020

Contact this candidate

Resume:

G.KEERTHI VASAN

No ***, Vasavi Rainbow Apartment,

Dotta Thoguru, Electronic city,

Electronic City, Bangalore

500100

Email: ********@*****.***

Mob: +91-959*******

CAREER OBJECTIVE

To seek a challenging position in a growth-oriented and dynamic organization, where by flexibly channelizing all my potentials and strong enough to prove ability and knowledge in my workplace.

Targeting challenging assignments in Power Process Engineering/BOP/Fire fighting systems /WTP/ STP/ Static and Rotating equipments, piping Layout with an organization of high repute preferably in the Power sector

SUMMARY

Total experience of about 16 years in Basic and Detail engineering of Power plant and its Auxiliaries equipment, Balance of Plant (BOP) Packages Comprising of Cooling Tower, cooling water pumps, Surface condenser, Heat exchanger, Air compressed system Tanks, Piping Layout, Fire fighting systems, material handling systems, Fuel Handling system, WTP, STP and Detailing of supports for Power projects and Utility systems.

Having good design concept and exposure in vendor management in packages like cooling Tower and Pumps, Heat exchangers, Condensers, Fuel tanks, Water tanks and layout, and water treatment plant, pre-treatment plant, DM plant and its RO system, Effluent treatment plant.

Hands on experience in Thermal Power plant (Coal, Bio Mass and Solar based plant)

Exposure to Combined power cycle power plant and BFG boilers.

Exposure to ASME/ANSI/ IS, ISO, API, HEI, NFPA and TAC Codes and Standards for Power and Process Piping.,

Good and well exposure in power plant process. (P&ids, PFD, HMBD)

Good knowledge of Engineering, vendor management and project management methods.

PRESENT EXPERIENCE SUMMARY

M/s TCE at Bangalore (Contract Role - Dec 19 – till Date)

As a Lead Engineer in Mechanical BOP and KKS Tagging Philosophy and coding for Hybrid Solar Power Project 600 MW.

Technical Engineer in WTP and its WBD calculation for ADEN combined cycle power Plant, PESCO Abhudhabi.

Preparation of Pre bid Engineeering Documents, WBD, Water requirement calculations for combined cycle power plant.

Preparation of Technical specification of water system and condenser tube cleaning system and Line sizing of PIDs.

Review of Vendor offer and finalize the WTP package for the budgetary offer.

Involve in Fire fighting package and Losses calculation for combined cycle power plant.

Previous Experience

M/s Sobha Ltd (From Sep 2018 till Nov 2019)

Worked in Infosys Project as a Sr MEP, responsible for PHE, FHS and STP co-ordination.

Have exposure in erection and commissioning of 2 x 300 KLD MBR plant.

Have knowledge of Geberit and George fisher piping for water line and surface drainage pipes.

Material Follow up with supplier and get the same in time to complete the project.

Execution and Billing of Entire PHE, FHS and STP Equipments for the entire project.

Exposure in fire and HPS Pump installation and WTP equipments.

Well exposure in ERP for sub contractor billing.

Responsible for Executed items taking measurement at site and supply of items, prepare the bill and get certify from PMC/Client.

Co-ordination with civil team for necessary clearance for PHE works.

M/s Thermax Limited, Pune May 10 – Aug 16

M/s Cethar Consulting Engineers Ltd, Chennai Nov 09 - Jan 10

M/s Utility Power Tech Ltd., NTPC, Kawas Surat Jun 06 – Sep 08

Contract Engineer

Eversendai Ltd, Dubai Oct 08 -- Sep 09

Hexagon Engineers Ltd., Bangalore Sep’02-Nov’05

Project Engineer

SKILL SET:

Proposal Engineering

Balance of Plant, Cooling tower and pumps, surface condensers, De-aerator, Feed water pumps Fuel oil system, Heat exchangers, static equipments like oil and water storage tanks, WTP, STP, ETP Packages.

Project management/ vendor management / sub contractor co-ordination at site.

Fire fighting systems

Air conditioning and ventilation systems

Thermal Power Plant Operations

Estimation & Cost Optimization

Operations & Maintenance

Design & Detailed Engineering

Equipment and Piping Layout

Team Building & Management

KEY RESPONSIBILITIES:

Understanding Tender document and preparation of power plant layout.

Evaluation of Pre order bids and comparison of Technical offer/ bids based on budget cost, Review, approval of suitable vendors and management of vendor documents after post order.

After post order, Review of vendor drawings and documents as per the contract award, making deviations if any, Approval of drawings and documents with interface the Electrical, C&I, and civil departments and release for site.

Selection of right boiler, turbine and other equipments.

Calculation of auxiliary unit sizing (DM plant, CHP, AHP, ESP, Effluent water treatment).

Understanding boiler concept, familiar with usage of codes and Standards (ASME,TEMA,ISI,NEMA,API, BS)

Design co-ordination with client and manufacturer till the completion of contract.

Preparation of P & Id, HMBD, WBD Diagrams as per contractual requirements.

Interaction with other design team for solving Technical issues and interface.

Preparation of Design Basis Report for the entire project.

Preparation of Preliminary Layout and plot plan.

Preparation of TG hall layout, water treatment plant layout, cooling water piping layout.

Preparation of Specification for ash handling system, air compressor system, fire fighting system,DM plant, dosing systems, cooling tower and fuel handling system, Fuel oil pumps, Miscellaneous pumps, Pipes and specialties.

Specification for AFBC, CFBC, WHRB, HRSG boilers and specification for all BOP equipments.

Specification for pumps, compressors and heat Exchangers for power plants and offshore projects (Knowledge in API 610, API672, TEMA, ASME standards)

Preparation of design basis report for the project.

Preparation of chimney and cooling tower layouts, specification

Specification for firefighting systems.

Scheduling and planning of project execution.

Review of fabrication drawings, preparation of Fabrication drawings of boiler support structure.

Making power plant commissioning plan and arrange resources.

Preparation of Purchase specification (Technical) for EPC contracts.

Well versed knowledge in ERP/ SAP and Indenting materials for projects.

Co-ordination with Procurement for the materials / equipments to delivered the same in Target date.

Approval of manufacturer design and layout drawings from vendor.

PROJECT SUMMARY:

Project

Scope

Responsibility

Project: IMFA project, 2X60MW

Client: Indian metals and ferrous

alloy Ltd

Location: Cuttack, Orissa

Engineering Manager

Preparation of preliminary General Arrangement drawing

Preparation of functional specification and vendor management for the packages for cooling towers and pumps, condensers, heat exchangers, Miscellaneous centrifugal pumps, Reciprocating pumps, fuel oil pumps, fire fighting system, compressed air system, EOT crane, Hoist and Pipes and specialties.

Handling of entire packages Cooling Towers, Pumps, Fuel handling systems, Fuel oil pumps, Storage tanks, Elevators, Hoist, ETP, Valves, control valves and Pipes and specialties, Fire Fighting systems, EOT Crane, Hoist, Air Compressed systems, Misc pumps and Fuel oil pumps.

Preparation and planning of (BOM) Materials take off for the entire project like Pipes and fittings, valves and specialties and indenting the same Through ERP (oracle) and close Co –ordination with Procurement to delivery of the materials with in Target date.

Review of Process P&IDs, HMBD for the Boiler, STG and WTP packages.

Review of GA drawings of all equipments Data sheet for dual media filter, sand filter, ultra filter, dosing pumps, chlorination system and DM plant.

Preparation of Design Basis Report, P&ID, and Basic Engineering documents as per process parameter requirement.

Preparation of other process data sheets, Line List, Utility List, Auxilairy consumption, Valve list, Equipment List as per process Requirements.

Tank Volume calculations, Fabrication drawings

Meenakshi Energy Limited, 2X 135 MW

Client : Meenakshi Energy Limited

Location : Nellore, Andhra paradesh

Lead Engineer

Preparation of Plot plan and, preliminary General Arrangement drawing,.

Functional specification and managing vendor documents and drawings and ensure the approval for the entire package for cooling towers, pumps, Miscellaneous centrifugal pumps, Reciprocating pumps, fuel oil pumps, Air compressors, firefighting system, compressed air system, EOT crane, Hoist and Pipes and specialties.

Preparation of Design Basis Report, P&ID, and Basic Engineering documents as per process parameter requirement.

Preparation of other process data sheets, Line List, Utility List, Auxilairy consumption, Valve list, Equipment List as per process Requirements.

Managing entire packages of Boilers and STG (P&ID, HMBD review ) CHP, AHP, Elevators, Cooling Tower, Hoist, ETP, IBR and NIBR Valves, Control Valves and Pipes and Specialties, Fire-fighting Systems, EOT Crane, Hoist, Air Compressed Systems, Misc pumps and Fuel Oil Pumps

Planning of (BOM) Materials take off for the entire project like Pipes and fittings, valves and specialties and indenting the same Through ERP (Oracle) and close coordination with Procurement to delivery of the materials within target date.

Coordinating with contractors / builders and providing them with all the detailed construction documents at site.

Design of Fire fighting systems for entire plant. (Hydrant and spray)

Co-ordination with Project management to complete the major packages in scheduled time and avoid miss outs and delays at site.

Project: Abhinav Steels Limited, 1X

60 MW Thermal Power

Plant.

Client: ASL- India

Location: Uttar Pradesh, saithara

Engineering Manager

Preparation of General Arrangement drawing, P&ID, water balance scheme.

Calculations of chimney stack height and diameter, boiler performance, Heat rate, Bunker volume, Fuel Analysis calculation

Coordination with other design teams and client.

Review of Process P&IDs, HMBD for the Boiler, STG and WTP packages.

Review of GA drawings of all equipments Data sheet for dual media filter, sand filter, and ultra filter, dosing pumps, chlorination system and DM plant.

Project: Sudharshan Chemicals Limited

Roha, Maharashtra 1 X 8 MW, Coal based Power Plant

Client: SCL- Roha

Location: Roha, Maharashtra

Engineering Manager

Design / Preparation & Review of P&IDs, Flow diagrams, Plot Plan, Equipment layouts, Piping layouts, piping isometric drawings BOMs etc.

Preparation of technical specification and technical evaluation of vendor pre-bid and Post-bid offer for rotating equipment’s such as Cooling tower, Pump, Compressor, other balance of plant packages like AHP, Water treatment plant, Storage tanks.

Layout checking, Plot plan checking, checking of civil drawings and release for constructions.

Preparation of water treatment plant layout

Preparation of TG Deck Drawing in co-ordination with Civil & Electrical.

Specification for firefighting systems

Preparation of design basis report for the project.

Preparation and planning of (BOM) Materials take off for the entire project like Pipes and fittings, valves and specialties and indenting the same Through ERP (oracle) and close Co –ordination with Procurement to delivery of the material with in Target date.

Project: Lamson Power corporation 1 x 15 MW, Bio Gas Based power plant

Client: Lamson Power corporation

Location: Philippines

Lead Engineer

Preparation of technical purchase specification for Cooling tower, pumps, Aircompressors, Fuel oil systems, Ash handling system (Dense phase),WCC, fuel handling system and Handling of packages for execution.

Vendor drawing, Layout & Plot plan review

Preparation of General Arrangement drawing, P&ID, water balance scheme.

Preparation and checking of chimney and cooling tower layout.

Project: Lamson Power corporation 1 X 5.5 MW

Client: Lamson power corporation

Location: Philippines

Lead Engineer

Design / Preparation & Review of P&IDs, Flow diagrams, Plot Plan, Equipment layouts, Piping layouts, piping isometric drawings BOMs etc.

Preparation of technical specification and technical evaluation of vendor pre-bid and Post-bid offer for rotating equipment’s such as Cooling tower, condenser, Pump, Compressor, other balance of plant packages like Fuel oil system, static equipment,

Preparation of engineering project schedules, drawing/ document submission schedules, Planning, monitoring & coordinating the engineering activities, drawing/ document flow in line with the target dates.

Layout checking, Plot plan checking/ Review

Project: 1 X 500 MW, Singareni Collieries Ltd, A.P.

Client: Singareni collieries ltd

Location: Kurnool

Lead Engineer

Preparation of Detailed Project Report for various power plant systems.

Project: 1X 125 MW Reliance Solar Power Project

Lead Engineer

Preparation of P&ID Diagram for Steam, feed water, ACW systems, Central Lube oil system.

Preparation of calculations for All the entire Static equipments and Tanks for the Auxiliary of Turbines, Atm flash tank, Lube oil over head tank, Air receivers, Dirty and Clean oil tanks and Condensate storage tank.

Preparation of specification of Power cycle pumps, BFP, CEP and Review Vendor offer, data sheet evaluation, and finalize the order.

Preparation of Specification of Heaters and Review of Vendor offer and order finalization.

Indenting the Materials Pipes, valves, all equipments through ERP and co-ordination with Procurement to deliver the same in target time.

Project: 2 X 40 MW Blast Furnace

gas Based Power plant,

Client: NMDC

Location: Chhattisgarh.

Lead Engineer

Go through of Tender documents of entire package and mention Deviations if any.

Preparation of Technical specifications of BFG Boiler, Steam turbine, Misc Pumps, BOP P&ID.

ERP, Pre planning for materials for project.

Company: Utility Power Tech Limited (From Oct 2006 to Nov 2007)

Involving in Mechanical

Maintenance, Shut down

of boiler and turbine

Client: NTPC

Location: Kawas Surat

Project Engineer

Coordinating Tendering and site activities.

Preparation of Material Specification for Pipe, Valve &Fittings

Preparation of BOM.

Company: Hexagon Engineers Ltd (From Sep 2002 to Sep 2006)

Client: Jindal Aluminum Ltd, Bangalore

Location: Bangalore

Project Engineer

Checking of GA drawings for receivers &Tanks.

Preparation of As-built drawings

Coordinating, planning site erection and commissioning activities.

Preparation of engineering project schedules, drawing/ document submission schedules, Planning, monitoring & coordinating the engineering activities, drawing/ document flow in line with the target dates.

Preparation of MTO and fabrication drawings.

Company: Cethar Consulting Engineers Ltd (From Dec 2007 to Apr 2010)

Location: Chennai

Lead Engineer

Preparation of general arrangement drawing, P&ID, Water Balance Scheme.

Handling entire packages of Boilers and STG (P&ID, HMBD review ) CHP, AHP, Elevators, Cooling Tower, Hoist, ETP, IBR and NIBR Valves, Control Valves and Pipes and Specialties, Fire-fighting Systems, EOT Crane, Hoist, Air Compressed Systems, Misc pumps and Fuel Oil Pumps.

Design of Fire fighting systems for entire plant.

Planning of (BOM) Materials take off for the entire project like Pipes and fittings, valves and specialties and indenting the same Through ERP (Oracle) and close coordination with Procurement to delivery of the materials within target date.

Site Co-ordination with Vendors and sub contractor to execute the major packages like Coal Handling, ash handling, cooling towers and WTP areas at site within scheduled period.

SOFTWARE KNOWLEDGE

MS Office Package and other Internal applications

AutoCAD,

MS Office

SP 3D

Navis works

ERP Oracle 12

ACHIEVEMENTS & ACOMPLISHMNETS

Implementation of Cooling tower and pumps, Fuel oil system, storage tanks, WTP, Fire fighting system for power plant for IMFA & successfully commissioned system for two units.

Timely completion of All the BOP Packages, Cooling tower and its auxiliary, Fuel oil system, Air compressed system, Water storage equipment and layout, Fire water distribution, Pipes and specialties and commissioned the same for IMFA and RIL Project within target date.

Coordinated team members with Procurement department for a scheduled delivery of fabrication Items, bought out items, for the power plant with in a Target date.

ACADEMICS

B.E. (Mechanical Engineering) – Bharatidasan University – May 2002. (72 %)

XII – Padma sarangapani – Chennai- State Board – 1998. (81%)

10th from National Vidyalaya, Chennai, Central Board of Secondary Education in 1996 with 72%

I hereby declare that the above-mentioned information is true to the best of my knowledge.

(G KEERTHI VASAN)

Bangalore



Contact this candidate