|
Resume alert |
Resumes 21 - 30 of 149 |
Hosur, Tamil Nadu, India
... Familiarization of Thermal Power Plant: Conducted at : NEYVELI LIGNITE CORPORATION (7 x 210 MW) Exposure: Systematic operation of individual equipment and it uses Schematic flow of Water-Steam cycle, Coal- Ash cycle and Air-Flue gas cycle, ...
- 2021 Jun 28
Vasant Nagar, Karnataka, India
... (Open Cast Coal Mines) Ramakrishnapura Open cast Project as Mining engineer Executive June-July 2019 for the period of 40 days. Area of Interest Drilling and Blasting, Rock Mechanics, Mine Surveying. Projects carried out in B. E: Investigation of ...
- 2021 Jun 25
Bengaluru Nagara, Karnataka, India
... Air cleaner devices that use electrostatic attraction to remove fineparticulate matter such as dust and cigarette smoke from the air and the systesystem works well for wide range of biomass including wood,pieces and lowquality coal. Seminars ...
- 2021 May 28
Vasant Nagar, Karnataka, India
... (Jun 2015 to April 2016) Designation: Assistant Engineer of Electrical Location : Parsa, Sarguja, Chhattisgarh Knowledge of Operation & maintenance of Coal washery (15 MTPA) & Thermal power plant (600MW) . Responsible for operation & maintenance of ...
- 2021 Apr 22
Vasant Nagar, Karnataka, India
... I have well knowledge in Maintenance, operation and Troubleshooting of Lime Stone Crusher, Wagon Tripler, Coal Crusher, Stacker, Reclaimer, Raw mill & Bag House. Maintenance of Material Conveying and Pneumatic Conveying Equipment like Screw ...
- 2021 Apr 04
Vasant Nagar, Karnataka, India
... Online Enrolment • KSRTC, Online Application Process • Rajasthan University- Computer Based Assessment Delivery • Mahanadi Coal Field, Online Application and Recruitment Exam Delivery • Azim Premji Foundation- Computer Based Online Application and ...
- 2021 Apr 04
Bangalore, Karnataka, India
... DESCRIPTION: - Design of Actuation mechanism for controlling emission during coal cake charging into oven battery. RESPONSIBILITY: - • Developed 3d concept model of Charging Emission Control Valve Mechanism. • Developed proposed layout and basic ...
- 2021 Mar 31
Vasant Nagar, Karnataka, India
... Successfully completed conveyor erection for the following units like Coal Re-claimer, Additive Re-claimer, Gypsum and Lignite along with pre-commissioning activities. Erected Blending Silo hopper 40MT capacity at +50.00mtr height and blending Silo ...
- 2021 Feb 17
Vasant Nagar, Karnataka, India
... June 2008 to Jan ‘10 Project: Jetty & Coal Handling Plant and Udupi Thermal Power Plant Implement the Organisation policy & procedures and Reporting to project manager. HSE Engineer Comtech Engineering May’ 2005 to June 06 Project: Construction of ...
- 2021 Jan 28
Vasant Nagar, Karnataka, India
... Drawing for Coal conveying Belt conveyor to 2x135 0MW Power Plant Involved in Design of Dust extraction System for the Blast Furnace Involved in checking of structural and material handling industry Checking fabrication and detail drawings for DRI ...
- 2020 Dec 17