Post Job Free
Sign in

Power Plant Project Coordinator

Location:
Karnataka, India
Posted:
June 25, 2020

Contact this candidate

Resume:

K. VENKATESAN, B.E, BOE, BEE (Energy Manager)

Bachelor in Mechanical Engineering,

Asst. Manager - Captive Power Plant,

ACC LTD, Wadi Cement Works.

Mob: +91-904*******. E – MAIL: **************@*****.*** PROFESSIONAL OBJECTIVE

Skilled professional awarded Bachelor Degree in Mechanical Engineering. Equip myself and contribute to the benefit of the organization, thereby to grow with the organization. ACADEMIC CREDENTIALS

Bachelor in Mechanical Engineering 2011-14

Completed with an Aggregate of 75.6% at "Thanthai Periyar Government Institute of Technology”, Vellore and Tamilnadu.

Diploma in Production Engineering 2007-10

Completed with an Aggregate of 94.6% at "Thiagarajar Polytechnic College”, Salem and Tamilnadu.

PROFESSIONAL EXPERIENCE

Company : Venus Energy Audit System, Pollachi, Tamilnadu. Period : April 2014 to November 2016

The company is mainly focused on boiler trouble shooting & performance study. Nature of work is shutdown inspection, Energy audit and study the performance of the various types of boilers like AFBC, CFBC and Travelling grade.

Joined as an Engineer

Involved in boiler erection, shutdown inspection, performance study and troubleshooting for power and process boilers.

Worked for boiler revamping and detailed engineering drawings were developed.

Generating 2D details boiler layout, general arrangement drawing using AutoCAD (Mechanical) tools.

Worked in following boiler erection, shutdown inspection and troubleshooting activities. Erection Exposure:

ACC Limited, Wadi - 1 x 125 TPH Captive Power Plants, BHEL make.

(Erection of economizer assembly, All Compartment Air nozzle, Coal nozzle & PA Pipeline)

ACC Limited, Chaibasa - 1 x 75 TPH Captive Power Plants, CVL make.

(Erection of economizer assembly, Boiler flue gas duct)

Chettinad Cement Ltd, Kallur works - 1 x 160 TPH Captive Power Plants, CVL make

(Erection of Bed Evaporator coils, Bed Super heater Coils)

Balji Malt Pvt Ltd, KA - 1 x 12 TPH Process Boiler, Micro make

(Erection of Air preheater structure & Air preheater assembly, Modification of exiting flue gas duct arrangement to new air preheter assembly)

BMM ISPAT Ltd, KA - 1 x 95 TPH Captive Power Plants, Thermax make

(Erection of Bed Evaporator coils, bed Super heater Coils, economizer bends, Primary super heater clamping)

ACC Limited, Wadi - 1 x 125 TPH Captive Power Plants, BHEL make

(Erection of Bed Evaporator coils)

Shutdown Exposure:

Ultratech Birla White - RJ - 1 x 75 TPH – AFBC (CVL make)

OCL – Orissa - 2 x 110 TPH – CFBC ( IJT Make)

DCW Ltd - TN - 1 x 75 TPH – AFBC (Thermax make)

DCW Ltd - TN - 2 x 125 TPH – AFBC (Thermax make) Operation and Energy Auditing:

SARDA Energy & Minerals Ltd - 2 x 90 TPH Captive Power Plants, CVL Make.

Hira Powers & Steels Ltd - 90 TPH Captive Power Plants, CVL Make.

Hira Ferro Alloys Ltd - 90 TPH Captive Power plant, Thermax Make.

ARS Metals - 60 MW Power plant, CVL Make.

Company : ACC Ltd, Wadi Cement Work.

Designation : Senior Engineer – Captive Power Plant Experience from : November 2016 to till date

JOB RESPONSIBILITIES

Primarily managing the daily operation and maintenance of 125 MW thermal power plants. Evaluating daily maintenance and implementing improvements.

Planning and ensuring required manpower as per job requirements.

Monitoring plant performance and initiating proactive actions for any unfavorable variance.

Planning and arranging stores spares and service from OEM for the critical equipment.

Planning and execution of routine, preventive and other plant shutdowns activities.

Implementation of innovative and cost effective methods to control the maintenance cost.

To analyze the reasons for Plant tripping, Forced outages and to take corrective measures to eliminate the same.

To execute any assignment after risk assessment and hazard identification. Establishing methods of statement and safe work procedure for project works. PROJECTS

CAPEX Project coordinator for 2 X 110 CFBC boiler water wall panel, super heater and economizer pressure part.

CAPEX Project coordinator 4 X 6 TPH CFBC rotary bed ash cooler. Cooling water pipeline layout and drawing and engineering done by myself.

CAPEX Project coordinator 2 X 110 TPH AFBC pressure and non pressure part project.

CAPEX Project coordinator 2 X 75 TPH AFBC pressure and non pressure part project.

CAPEX Project coordinator conversion of ESP to Hybrid ESP (Bag Filter).

CAPEX Project coordinator for plant fire fighting system.

Project coordinator for flue gas temperature reduction in boiler exit temperature. ACHIVEMENTS

Got three times “Gaurav Award” for CAPEX project completion and improving boiler availability.

Involved in plant stabilization activities.

PERSONAL PROFILE

Father’s Name : Mr. Krishnaraj R

Date of birth : 30-06-1992

Languages Known : English, Tamil, Kannada & Hindi (Beginner). Gender : Male.

Marital Status : Single

Permanent Address : 78/4, Nethaji Street, Gandhi Nagar, Salem-636010, Tamilnadu. DECLARATION

I hereby declare that above mentioned information is correct up to my knowledge and I bear the responsibility for the correctness above mentioned particulars. Truly Yours

VENKATESAN



Contact this candidate