|
Resume alert |
Resumes 41 - 50 of 229 |
Aurora, IL
... Caterpillar Aurora, IL 2012-2017 Supply Chain MWL Program Leader/New Product Introduction Focus Team Leader: Comprehensive oversight of all Supply Chain/Operations/Engineering/ Procurement functional areas to launch and build 12 new pilot to ...
- 2019 Aug 05
Schaumburg, IL
... Lead the increase sales revenue in the Caterpillar account by $2M a year, starting in 2009 to reach $12M in 2015. Maximize profit margins to meet targets by negotiating and controlling product costs, lead times, freight terms, and purchase quantity ...
- 2018 Oct 18
Aurora, IL, 60506
... North Aurora, IL CNC Lathe Machinist Set up and operated large CNC vertical turret lathes for very close tolerance Caterpillar transmission parts Used numerous different types of tooling with limited instructions 1990-1996 Fox Valley Machining North ...
- 2018 Aug 05
Aurora, IL
... Experience was gained with AT&T, Lucent, Lorain, Power plants as well as Caterpillar, Kohler, Onan and Generac stand-by engines/generators and transfer switches. Experience was also gained with auditing of existing site equipment, cross-connect ...
- 2018 Jul 11
Aurora, IL
... Responsible for set-up machine and tools for milling parts (customers: Caterpillar, US-Locomotive, GE …) FIAT Automotive Research and Development, Bielsko-Biala Poland ‘87 – ‘89 Mechanical Design Engineer Responsible for designing subassemblies such ...
- 2018 Jun 27
Naperville, IL, 60564
... The Morey Corporation was chosen as primary design agent and manufacturer for Caterpillar’s extensive Power Distribution & Control Business Model, worth Billions in new business. I have also increased utilization of our existing Joint Venture with ...
- 2018 Mar 29
Aurora, IL
... Microsoft Office Suite,, C, C++, C#, R-Programming WORK EXPERIENCE Caterpillar Inc., IL, USA January 2017 – Present Lead Manufacturing Engineer • Re-configured and relocated active assembly line while maintaining program cost & schedule objectives. ...
- 2018 Mar 28
Cicero, IL
... dollar annual budget and controlled P&L within two months Reduced labor attrition and turnover from 33% to 5% per quarter Caterpillar Logistics - Aurora, IL Process Engineer (Contractor) 7/2008 – 12/2010 Applied Six Sigma DMAIC methodology to gain ...
- 2018 Feb 13
Elgin, IL
... Customers included Delphi Automotive, Boeing, GM and Caterpillar. Prepared preliminary sales drawings, using AutoCAD software, of custom trailers and followed up with designing and overseeing the manufacture of said trailers. EDUCATION Associate of ...
- 2018 Jan 11
St. Charles, IL
... CUSTOMER LIST Agco Boeing Bombardiar Briggs and Stratton Caterpillar Cessna Chrysler Case New Holland Cummins Detroit Diesel Elgin Sweeper Ford General Electric General Motors Honda John Deere MacDon Mercury Marine Navistar Nissan Rockwell Siemens ...
- 2017 Nov 20