Erbil, Iraq
... Supervise the assembly of pressure vessel internals Ie. Sieves, Weirs, Coalescers, Electrostatic Coalescers, Hydro Cyclones, Electrostatic Transformer installation etc… Expedite bought out items in conjunction with relevant Project Engineer, ...
- 2023 Jul 29
Erbil, Iraq
... 12.Sizing and PDS preparation of Vessel, Heat Exchangers, Control Valve & Flow Meter etc. 13.Preparation of Control philosophy & Cause and Effect Diagram. 14.Preparation of utility consumption chart, line list & equipment list. 15.Preparation of ...
- 2023 Jun 29
Iraq Sakri al Falih, Iraq
... Air Blowing,Punch List, Loop Check, Pressure Test, Hydro Test, Purging, Vessel Test, Entry, Cleaning, Water Flushing, Line Tracing, Rotary Equipments, Function Test, Mechanical Run Test. Experience in project, Erection, connection, installation also ...
- 2023 Jan 28
Basra, Iraq
... pre pouring and pouring for cast in situ and precast elements for pipe sleepers, pipe support with embed items, drain vessel, cable tray support, flowline culverts lines, drilling cellars and also for earth works backfilling and compaction and ...
- 2022 Dec 07
Basra, Iraq
... 108190) API 570 - PIPING INSPECTOR (NO.66901) API-510 - PRESSURE VESSEL INSPECTOR (NO. 68269) API-653 - STORAGE TANK INSPECTOR (NO.67338) CSWIP/BGAS GRADE 2 - PAINTING INSPECTOR - (694716) ASNT-NDT LEVEL II: RT, MT, PT, UT, VT, RTI PROJECT ...
- 2022 Aug 31
Basra, Iraq
... PROFESSIONAL SUMMARY PDMS, Piping Design, Layout & Stress Analysis, Spoolgen, Navis Works, Pressure Vessel Design, Auto Plant, Pro-Engineering, Auto Desk Inventor, Auto Cad, Autodesk Revit Mechanical Draughtsman, IT Pack SKILL SET SUMMARY Piping ...
- 2022 May 19
Qatar Jiyan, Erbil, Iraq
... • Nondestructive Evaluation ASME Boiler and Pressure Vessel code section 5 – Sudan university 2015. • RPO Radiation Protection in industrial radiography – Sudan university 2013. Experience: • Forum Petroleum Services & Construction safety officer ...
- 2021 Dec 14
Basra, Iraq
... BSDG 4 UNITS, FUEL GAS AREA, WATER TRETMENT PLANT, FLARE SYSTEM, FIRE FIGHTING SYSTEM ABOVE GROUN Vessel & Tanks Erection and Installation a) Check for any transit/handling/storage damage to the external surface of the vessel especially the nozzles. ...
- 2021 Nov 17
Iraq
... Perform and manage project activity scheduling and monitoring Perform technical and commercial review of EPCI long time tenders for the preparation of Service agreements Prepare monthly vessel movement report for the monitoring of the vessel ...
- 2021 Mar 26
Sulaymaniyah, Iraq
... TECHNICAL SKILLS • Familiar with Process engineering calculations for piping, vessel, heat exchanger design. • Familiar to use AutoCAD to transform engineering design to produce drawing. • Heat and Material Balance for Process Unit. • Heat transfer ...
- 2021 Feb 02