Post Job Free

Resume

Sign in

Power Plant Field Operator

Location:
Basra, Iraq
Posted:
November 17, 2021

Contact this candidate

Resume:

Mohammed B. Al-Khineab

Curriculum Vitae

Dear sir, it’s an honor for me to introduce this CV with my personal information to apply to work in your group as employee in the development of this corporation. Your job discretion for a perfectly matches my qualification, and I am very interested in the opportunity.

CAREER SUMMARY

Work in a challenging environment in company or organization in the oil& gas field, maintenance, power electrical or training where I can utilize my capabilities to advance in my career. I am self- motivated, ambitious and eager to learn. I am a responsible individual with strong communication skills and work ethics besides being creative, focused and highly determined. I am willing to take responsibility and work independently. At the same time, I can work well in teams. Looking for both personal and professional growth makes me capable of working confidently under pressure. Being bilingual gives me the chance to function efficiently in both English and Arabic. My background and growing up experience have given me a deep insight in the culture and society together with a wider scope in the world of business

Skills

10 years’ Experience in General Mechanical & Piping Hands on exposure to Petroleum & Petrochemical Construction Projects In-depth knowledge & Experience in oil& gas, Power Plant & Petrochemical Projects Strength of technical know –how in Mechanical, Piping, Structural Erection, operation and maintenance

Strong Knowledge in international codes & standards Able to monitor and lead a group & assignments entrusted Effective technical skills.

Problem-solving skills and Creativity.

Interpersonal the ability to work under pressure.

Team working skills.

Excellent communication and presentation skills.

The ability to manage projects.

A high level of IT ability.

Commercial and budgeting skills.

PERSONAL DETAILS

Name/Mohammed Basim Abdulmoneer.

D/ Sep. 24, 1987 - (Iraq/Basra), P/ +964 770-***-**** E/ adpdyt@r.postjobfree.com,

Academic Qualification: BSc Degree in Mech. Engineering. Graduated 2009

Language Skills: Arabic: Tongue,

English: Good

Computer Skills: Microsoft Office,

Internet Programs and Other

Applications.

Mohammed B. Al-Khineab

Work experience: 10 Years

WOOD COMPANY / MECHANICAL & PIPING SUPERINTENDENT

Iraq/Basra/WQ1/FOD Projects 2018-current

Responsibility

Supervision on mechanical & piping activities in F.O.D projects a) Participate in reviewing detailed design drawings, method statements, material requisitions, etc. b) Supervise and approve construction activities and co-ordinate various aspects of project construction including inspections, material submissions and working drawings from contractors, c) Carryout daily checks on contractor's staff and work carried out during the previous day to ensure compliance with prescribed contractual

d) Handle all aspects of Mechanical and piping Construction activities including site investigations, site surveys etc.

E) Supervise installation of

- Instrument air compressor project/installation mechanical equipment’s and piping system and shelter

- Mobile Oil Treating Desalting project/installation piping system

- Booster pumps replacement project / replace piping system from underground to aboveground,

- Crude tank vents project /installation new vent piping system instead of old system

- Inlet header replacement project / replace piping system from underground to aboveground

- Effluent pit project/ installed pumps, and piping systems F) Maintain a daily record of progress, noting special comments, Reports to supervisor work anomalies or contractual deviations committed by contractor personnel and recommend corrective

G) Checking &Sign work permits to ensure that contractor’s compliance with conditions fixed on consolidated work permits

H) Participate in development of as-built drawings/documentation. I) Prepare Punch list for finished work prior to hand over to OP by contractor. G) supporting the commissioning and start up activities. Mohammed B. Al-Khineab

GE COMPANY /MECHANICAL & PIPING

Iraq /Basra/ZUBAIR OIL FIELD DEVELOPMENT/ PROJECT-PPG 2017-2018 Responsibility

Erection & preservation of BOP Equipment

Tank erection supervisor, BSDG 4 UNITS, FUEL GAS AREA, WATER TRETMENT PLANT, FLARE SYSTEM, FIRE FIGHTING SYSTEM ABOVE GROUN Vessel & Tanks Erection and Installation a) Check for any transit/handling/storage damage to the external surface of the vessel especially the nozzles. Check if there is any distortion in alignment. b) Check the internal surface for any damage to the lining, for presence of any foreign matters, dust or dirt and remove as necessary.

c) Ensure that the crane available is of sufficient capacity with a boom height capable of lifting and placing the vessels over their foundations.

e) Ensure the availability of required qualified manpower and equipment, shackles and slings. f) Check the dimensions of the respective foundations, elevation, pocket sizes and the distance between the pocket if applicable.

g) Fix the slings to the appropriate lifting lugs. Erection supervisor/ Technician should ensure that slings being used are appropriate to handle the Empty weight of respective Vessel. h) For this specific Job as the Vessels are being placed directly on the plinths, hence before installing the Vessels, pockets in civil should be checked to suit the anchor supplied and as indicated in the Vessel General Arrangement drawing & foundation drawings Installation of Skids

- Check all skid foundation dimensions elevation level and pockets.

- Open packing cases and check equipment for any damage preferably as close to its final location as possible.

- Place the base frames over the bolt pockets and align the blots.

- Grout the foundation bolts and pockets., Tighten the nuts.

- Follow procedures outlined above for grouting

Interconnecting Piping Erection and Installation

- Sort the pipes into individual lots as per the lines they form the respective part of.

- Arrange them as per their numbers in line with their relevant piping drawing.

- Check for any physical damage.

- Stack the required number and sizes of nuts, bolts, washers and gaskets.

- Stack the relevant valves and take care that no damage occurs during handling.

- Check if all supports are installed and are to correct level.

- Stack the respective clamps.

- Using the relevant piping Layout and P & ID’s as a reference the pipe installation can be started. This shall be done in accordance with the guidelines laid down in the general engineering practice for piping erection & pipe supports. Pipework and Support Installation.

- The inside surfaces of all pipe shall be cleaned by air blown before erection.

- All pipe ends shall be capped all a time until the activity for fit-up. Mohammed B. Al-Khineab

Weir Company /Seiner Field Operator

Iraq/Basra/WQ2 /O&M power plant for LOUKIOL Company 2016-2017 Responsibility

- Performance monitoring of compressor & turbine.

-Implemented Standard Operating Procedures, equipment lockout tags out procedures of power plant as per international standardization of organization.

-Performing the functions of troubleshooting and breakdown/preventive/corrective maintenance for reducing downtime to minimum.

-Control and maintain auxiliary equipment, such as pumps, fans, compressors, condensers, heaters, filters, and chlorinators, to supply water, fuel, lubricants, air, and auxiliary power

- Adjust or minor repairs, such as tightening leaking gland and pipe joints; report any needs for major repairs.

- Monitor and inspect power plant equipment and indicators to detect evidence of operating problems.

- isolated the mechanical system to stat maintenance activities and deisolated after finished . Al-Dar Com. / Mechanical & Piping Field Engineer 2015-2016 Iraq/Al-Kut/ Badra oil Field CPF phase-2

Installation Gas Turbine & Auxiliary Equipment Subcontracts with Samsung Engineering Responsibility: Manage, plan, coordinate and supervise construction activities.

- Evaluate and help determine the construction plan and schedule for completing the project

- Prepared the drawings requirement for site activities

- Checked, received and inspected the materials that required.

- Prepared the PTW to start activities and checking the safety requirement.

- Reporting the daily progress activates.

- Installation GT & auxiliary equipment

- Installation pumps & compressors

- Installation culoms & vessles

- Installed the piping systems/ fabrication, fit up, welding,hydrotest,leak test and flashing for piping system.

Mohammed B. Al-Khineab

Baghdad Com. /Mechanical & Piping Field Engineer 2014-2015 Iraq/Basra/Zubair Storage station

Rehabilitation Gas of Pump Station Units NOVO PIGNON (GT Fram5) (Major Inspection) Responsibility: Manage, plan, coordinate and supervise rehabilitation activities. Evaluate and help determine the construction plan and schedule for completing the project.

- Rehabilitation of inlet filter house, (HP, LP) rotors, accessories gearbox bearing and others

- Replacement of journal bearings & thrust bearing, turbine blades (HP, LP), combustion chamber and others

- Disassembly and reassembly of piping system, leak test and flashing activities

- Commissioning and startup

Baghdad Com./New Power Plant (Four Units GE9) Sub-Contracts with ENKA TEKNEK Company 2013-2014

Iraq/ Basra / Njebea Power Plant

Responsibility: Completes construction projects by planning, organizing, and controlling projects; completing quality inspections; supervising sub-contractors and staff

- Manage, plan, coordinate and supervise construction activities.

- Installation of GT and Generators and accessory system

- Installation of pumps.

- Installation of filters house and coolers system and other system.

- Alignment for GT and Generator and alignment for GT and gear box under supervisor of Head of the Department of Mechanics

- Disassembly and reassembly of piping system, leak test and flashing activities

- Commissioning and startup

Mohammed B. Al-Khineab

Baghdad Com. /Rehabilitation gas turbine of gas compressor units NOVO PIGNON (fram5, fram3, fram1) (Major Inspection) 2012-2013

Iraq/Basra/Khour Alzubir (S.G.C)

Responsibility: Manage, plan, coordinate and supervise rehabilitation activities. Evaluate and help determine the construction plan and schedule for completing the project Ensures conformance and compliance with regards to planning of rehabilitation site activities

• Rehabilitation of inlet filter house, (HP, LP) rotors, accessories gearbox bearing.

• Replacement of journal bearings & thrust bearing, turbine blades (HP, LP), combustion chamber

• Disassembly and reassembly of piping system, leak test and flashing activities

• Commissioning and startup

Baghdad Com./New power generator GE10, 2011-2012

Iraq/Basra/North Rumila. (PS 1)

Responsibility: Manage, Plan, coordinate and supervise construction activities. Evaluate and help determine the construction plan and schedule for completing the project. Ensures conformance and compliance with regards to planning of construction site activities

• Installation of GT and Generators and accessory system

• Installation of filters house and coolers system and other system.

• Alignment for GT and Generator and alignment for GT and gear box under supervisor of Head of the Department of Mechanics

• Installation of piping system/ fabrication, fit up, welding, hydrotest and flashing. Hyundai Com. /Mechanical & Piping Site Engineer 2009-2011 Iraq/Basra/Qurna power plant

Responsibility: Completes construction projects by planning, organizing, and controlling projects; completing quality inspections; supervising sub-contractors and staff.

- Checking the drawings requirements for jobs.

- Checking all the material requirement and receive it from whore house

- Reporting daily progress to line manager.

- Install of engines, boilers, air intakes, fans ventilation, cooler units and water pumps

- Fabrication, fit up & welding of piping system, supports, steam tracing, Hydrostatic pressure testing & Flashing for pipeline system

- Supporting the commissioning & start up activities.



Contact this candidate