`
]
s
YASIR HAMID
Email: **************@*******.***/yahoo.com
Career Summary
Having over Sixteen years of experience as a Piping/ Mechanical /Rigging/Structural Draughtsman. Successfully delivered on multimillion dollars EPC & Construction Projects. I have triumphantly undertaken various Detailed Design Engineering projects within GCC (Piping/Mechanical). I have also seasoned in Structural /Equipment Detailing of Pressure vessels, Columns, platforms, stairs, pipe racks, pipe support clips, Insulation & Fireproofing details, Demister supports, Base Plates, Templates & Economizer etc. I have also played role as Rigging Designer for the installation of Heavy Equipment like Columns, Heat Exchangers, Pressure Vessels, Boilers, Heaters, Fin Fan Coolers, and Compressors.
PROFESSIONAL SUMMARY
PDMS, Piping Design, Layout & Stress Analysis, Spoolgen, Navis Works, Pressure Vessel Design, Auto Plant, Pro-Engineering, Auto Desk Inventor, Auto Cad, Autodesk Revit Mechanical Draughtsman, IT Pack
SKILL SET SUMMARY
Piping Design & Layout, Designing & Detailing of any type of Equipment, Structures, & Rigging Studies using Engineering Tools.
WORK AREA PREFERRED
Mechanical Piping Rigging Designing and Manufacturing Petroleum/Oil &Gas
WORK EXPERIENCE
COMPANY
Date
Company Country
Position
Department
Oct 2018 – Present
Drake & Scull International PJSC (IRAQ)
Piping Designer (PDMS)
(Engineering)
RESPONSIBLITIES
To prepare the Piping Arrangement, Plot Plan, Section Views, ISO Metric from topography survey and site visits following Piping line class & Piping specifications.
Preparing P&ID, PFD, Line List, Valve List, & ISO Metrics as well as preparing the material list as per define material class.
Preparing & Rectifying the M.T.O using right Commodity code, ident code, Size and most importantly Quantity as well as ensuring all components are as per exact Piping Specification & Piping Code at the same time verifying that piping components are sequence and well matched throughout P&ID up to ISO Metrics, eliminating & correcting mismatch if any.
Carrying out site survey activities at field to develop 2D Piping general Arrangement Drawings, Tie-in/Disinvestment isometric drawings under the supervision and following the instructions of Area Piping Engineer according to the established Technical Work Practices.
Preparing Pipeline Approach Drawings.
Prepare Isometric sketches for all Stress critical lines with the possible support locations and assist the stress engineer to carry out stress analysis.
2DBased on the Study Layouts / Model, provide Civil / Structural requirements to Civil / Structural section for all non-critical lines.
Resolve and co-ordinate all clashes within the piping discipline and other discipline.
Preparing comments on drawing and specification related to other discipline which may be affected by Piping activities.
Assist, Remodel and Update the model based on the Internal, Client reviews, latest Supplier information and Isometric checking comments and maintain the clash free model.
Responsible for signing Piping General Arrangement and Isometric drawings in 2D design under the "DESIGN" column.
Providing "Feedback" to the Area Piping Engineer concerning problem arising from application of standard methods and work instruction.
Filing drawings and documents according to the instructions of Area Piping Engineer.
CONSTRUCTION PROJECTS
Project Name:
Zubair Oil Field Development Project
Project Name:
Client:
ENI IRAQ B.V.
Client:
COMPANY
Date
Company Country
Position
Department
Sep 2015 – June 2018
Al-Hassan Engineering Co. L.L.C (Abu Dhabi)
Piping, Mechanical,Rigging Designer
(Design)
RESPONSIBLITIES
To prepare Piping G.A, Plot Plans, GA. of Equipment Layout, and Detail drawings of Pipe Rack, Pipe Support, and Material Take-Off for Piping & Pipe Supports.
To prepare the spool Drawings of piping Using Spoolgen according to client’s given spooling procedures and other specifications on IDF’s provided by client.
To prepare the “AS BUILT PIPING ISOMETRICS” & “GENERAL ARRANGEEMENTS” (GA) as per site modification.
To solve the problems regarding Material
Check Engineering ISO with BOM According to Piping plan.
Check shop Isometric drawings according to engineering ISO.
Site visits and Coordination with site staff on actual site conditions, convenient space, Smooth Track of Equipment route up to its picking point for removing obstruction if any, further noticing their better suggestions and advices based on their experience for safe and sound lifting operation.
To prepare the Rigging Studies (Lifting Plans) using AutoCAD for Heavy Equipment’s like that Columns, Heat Exchangers, Pressure Vessels, Boilers,Heaters, Fin Fan Coolers Compressors, Pumps, and other Heavy Equipment’s and Machinery using selected crane load chart ensuring safe working radius with safe working load capacity of crane.
Submitting Lifting Plan to client for approval along with highlighted used Crane load chart, working radius, Boom Length, mention tools and tackles in lifting plan like spreader bar, Lifting Beam, wire rope slings, webbing slings, Shackles with Third Party certificate as proof for ensuring every item which is used in lifting plan is according to the standard and factor.
Calculating the crane utilization percentage according to load chart and equipment weight.
Calculating the Equal & Proportional share load tension on wire rope using international wire rope tensions factors to avoid any accident at the time of Erection of equipment.
Coordination with Commercial department through technical manager for renting or purchasing items and providing them complete details with standard factor and material specification of those items which will not to be found in house items (store) and necessary to borrow or purchase for lifting of heavy equipment.
To prepare the Calculation of Tandem lifting on lifting plan mentioning weight on Main and tailing crane at different degrees for detail checking and ensuring the load releasing point of tailing crane is also giving safe utilization of crane percentage.
To contemplate on the safety factors, actual drawing scale, presentation of plan, technicalities of plan, and all possibilities for the safe lifting operation while preparing Rigging studies (Lifting Plans).
CONSTRUCTION PROJECTS
Project Name:
Rumaitha/Shanayel Facilities -Phase III
Project Name:
Client:
GS E&C
Client:
COMPANY
Date
Company Country
Position
Department
April 2011 – Aug 2015
Descon Engineering, Abu Dhabi L.L.C (Abu Dhabi)
Mechanical/Piping Designer
(FEDC)
RESPONSIBLITIES
To prepare the spool Drawings of piping Using Spoolgen according to client’s given spooling procedures and other specifications on IDF’s provided by client.
To prepare the “AS BUILT PIPING ISOMETRICS” & “GENERAL ARRANGEEMENTS” (GA) as per site modification.
To prepare revised spool drawings according to given material from client.
Adjustment of spools in ISO drawings as per site instruction and given client materials.
To solve the problems regarding Material.
Rectified the B.O.M according to client requirement from Spoolgen generated ISO.
Clear the Test packs drawings and kills all A & A0 punches related to FEDC department.
Generating of Engineering ISO from piping plan including Bill of Material.
Check Engineering ISO with BOM According to Piping plan.
Check shop Isometric drawings according to engineering ISO.
Prepare control sheet (MTO) of shop Isometric drawings.
Preparation of weld mark-up on Engineering revise ISO Drawings using AutoCAD and finalize for fabrication of spools.
Preparation of spool fabrication drawings on the behalf of weld marked-up Isometrics.
Issue Piping Isometrics drawings for Erection.
Issue revisions as per the requirement of client if there is any design modification etc.
Preparation of hydro test packages report as per Process and Instrumentation Diagrams,
Plot Plans, GA. of Equipment Layout, and Detail drawings of Pipe Rack, Pipe Support, and Material Take-Off for Piping & Pipe Supports.
Assigned for site duties like data collection of Piping and Mechanical as Built, and free hand sketches for site purposes.
CONSTRUCTION PROJECTS
Project Name:
Integrated Gas Development Habshan-5 Process Plant
Project Name:
Polyolefin Recovery Project
Client:
JGC/TECNIMONT
Client:
BOROUGE
COMPANY
Date
Company Country
Position
Department
Sep.2008 – March.2011
Descon Engineering, Qatar L.L.C (Qatar)
Sr. Mechanical Draughtsman
Design (EPIC)
RESPONSIBLITIES
To prepare the Isometric Drawings, Equipment for Oil & Gas sector including the following:
Pressure Vessels as per “ASME Section VIII DIV.1”
Coded Tank As per “ API 650 10TH Edition”
General arrangement drawings, detail fabrication drawings of internals and externals including vortex breaker, demister support, lifting lugs etc.
Platform and piping support clips, Insulation and fire proofing details.
Name plate bracket details.
Base ring and skirt details, Manhole and davit details.
CONSTRUCTION PROJECTS
Project Name:
Shell-Pearl GTL Plant, Ras Laffan, Qatar
Project Name:
Fahahil Main Shutdown
Client:
JGC/KBR
Client:
Qatar Petroleum.
COMPANY
Date
Company Country
Position
Department
Oct 2006 – Sep 2008
Consultant & Designer (CAD) Pvt. Ltd. Pakistan
Sr. Mechanical Designer
Design
RESPONSIBLITIES
To Prepare of General Arrangement Drawings, Fabrication Detail Drawings, Shell development drawings, Platform & Pipe support clips drawings and Insulation support drawings for different types of ASME U-Stamp Pressure Vessels and Storage Tanks used in Petrochemical and Oil & Gas Industries in Autocad software as per “ASME Section VIII DIV.1” standards and client’s specifications based on PV ELITE Compress Software Design Calculations
To Prepare Manhole, Name plates, Ladder & Platform detail with attach clips, Insulation & Fireproofing details, Demister supports, Base Plates Templates Pipe Support clips & Economizer etc.
To Prepare Layouts & Drawing with BOQs For Proposals Department.
To Prepare Data Sheets for Equipment.
To Prepare the Assembly and Detail Fabrication Drawings for Coded Tank As per “ API 650 10TH Edition”
To Prepare the Assembly and Detail fabrication Drawings for Structure.
DESIGN PROJECTS
Project Name:
Hawiyah Gas Plant Expansion, Project.
Project Name:
Yanbu Petrochemical, Complex Project Ethylene Glycol-1
Client:
(Olayan Descon Engineering Co.)
Client:
Client: (Olayan Descon Engineering Co.)
Project Name:
Utilities and Offsite Umbrella Project (UOU)
Project Name:
Yanbu National Petrochemical Company (Yansab) Olefins Plant
Client:
(Olayan Descon Engineering Co.)
Client:
(Olayan Descon Engineering Co.)
Project Name:
Eastern Petrochemical Company Sharq 3rd Expansion Project
Project Name:
Saudi Arabian Oil Company Project.
Client:
(Olayan Descon Engineering Co.)
Client:
Client: (Olayan Descon Engineering Co.)
Project Name:
Saudi kayan Petrochemical Complex
Project Name:
NCP Project Jubail Industrial City, KSA
Client:
(Olayan Descon Engineering Co.)
Client:
(Olayan Descon Engineering Co.)
Project Name:
Metro cash and Carry Store Multan Road Lahore
Project Name:
65 KTPA Soda Ash Expansion
Client:
(Star Engineering)
Client:
(ICI Pakistan Limited Lahore)
Project Name:
OL2K-Ethylene Project-AL-SHUAIBA-Kuwait
Project Name:
Kandhkot Field Gas Compression Station (KFGCS) Project.
Client:
(Zamil Steel Industries)
Client:
(Clough Engineering & Integrated solutions)
COMPANY
Date
Company Country
Position
Department
April 2006 – Oct 2006
Design Engineering (DEL) Pvt. Ltd. Pakistan
Sr. Draughtsman
Design
RESPONSIBLITIES
To Prepare of General Arrangement Drawings, Fabrication Detail Drawings, Shell development drawings, Platform & Pipe support clips drawings and Insulation support drawings for different types of ASME U-Stamp Pressure Vessels and Storage Tanks used in Petrochemical and Oil & Gas Industries in Autocad software as per “ASME Section VIII DIV.1” standards and client’s specifications based on PV ELITE Software Design Calculations
To Prepare Layouts & Drawing with B.O.Qs For Proposals Department.
To Prepare Data Sheets for Equipment.
To Prepare the Assembly and Detail fabrication Drawings for Structure
To Prepare Manhole, Name plates, Ladder & Platform detail with attach clips, Insulation & Fireproofing details, Demister supports, Base Plates Templates Pipe Support clips etc.
DESIGN PROJECTS
Project Name:
Sharq 3rd Expansion, Project KSA
Project Name:
Hawiyah Gas Plant Expansion, Project
Client:
(Olayan Descon Engineering Co.)
Client:
Olayan Descon Engineering Co.)
COMPANY
Date
Company Country
Position
Department
Oct. 2004 – April 2006
Pak Elektron Limited (PEL) Pakistan
Draughtsman
Switch Gear Design
RESPONSIBLITIES
To Prepare the Assembly and Detail Fabrication drawing for Electrical Panels,
To Prepare Layouts & Drawings with BOQs For Proposals Department
CERTIFICATIONS:
Qualification
Year
Institution
Place
Auto Desk Revit
PDMS (Plant Design Management System)
Piping Design, Layout & Stress Analysis
2017
2015
2010
Time Training Centre
Zabeel international Institute of Management
& Technology
National Institute of Design & Analysis
(Abu Dhabi)
(Abu Dhabi)
Lahore, Pakistan
Pressure Vessel Design (Compress)
2010
National Institute of Design & Analysis
Lahore, Pakistan
Auto Plant
2008
Engineering System
Lahore, Pakistan
Pro-Engineering
2007
Engineering System
Lahore, Pakistan
Auto Desk Inventor
2007
Engineering System
Lahore, Pakistan
Auto Cad
2004
Iqra Computer College
Lahore, Pakistan
Mechanical Draughtsman
2004
Technical Training Institute
Lahore, Pakistan
IT Pack
2001
Morning Star Computer College
Lahore, Pakistan
PERSONAL DETAILS
Date of Birth: April-8-1985
Visa Status: Pakistani
Gender: Male
Passport No: AQ6279893
Father Name: Muhammad Hamid Zia
NIC No: 35201-4421989-9
UAE License: Yes
Permanent Address: House#149-A Pak Arab Society Lahore