|
Resume alert |
Resumes 31 - 40 of 123 |
Quezon City, Philippines
... Piping Engineer Project Involved: EPC for Pagbilao 420 MW Unit-3 Coal Fired Power Plant (Pagbilao, Quezon Philippines) Team Energy Corporation / Aboitez Group Company Duties & Responsibilities: Responsible to reviewing design contractor ...
- 2021 Sep 27
Antipolo, Rizal, Philippines
... Point Load Test, and Schmidt Hammer Project: Standard and Seismic CPT Testing for Pipeline and Foundation Extension of Semirara Coal Plant at Calaca Batangas · Supervised and performed standard and seismic CPT (Cone Penetrator Test) operation in the ...
- 2021 Sep 10
Quezon City, Philippines
... CONSUNJI, INC (2012-2014) Makati City, Philippines Designation: Planning Manager Projects: 2x150 MW CFB Coal Fired Power Plant-Calaca, Batangas 1x135 MW CFB Coal Fired Power Plant-Calaca, Batangas 1x15 MW CFB Coal Fired Power Plant-Aklan, ...
- 2021 Aug 22
Quezon City, Philippines
... - Island Creek Coal Company Alpine Preparation Plant, Bayard West Virginia, U.S.A. State Compensation Insurance Fund, Oxnard California, U.S.A. Alex M. Vengua - Page 6 of 8 Firms Jan 2018 - Present PHESCO, Inc., Q.C., Philippines Dec 2013 - Mar 2016 ...
- 2021 May 31
Quezon City, Philippines
... steel, flour, feeds etc.), Energy Development Sectors (Coal-Fired Power Plants), Industrial Sectors, Transport/Heavy Equipment, Construction Companies. Maintained supplier-client relationships - Update clients regarding current status of their ...
- 2021 May 17
Barangay 176, Manila, Philippines
... Consunji Inc.Project 1 x 135 Coal Fired Power Plant-Ph2 (21M Gantry Column) Structural Project AG & P Project Lycopodium-Otjikoto Mine Project B2 Gold Namibia (Pty) Ltd. Painting: Area 500 (pipe tracks) United Power System Phil.,Inc. Project 365 ...
- 2021 Apr 06
Quezon City, Philippines
... September 1, 2020 Mechanical Engineer at PNOC Dockyard and Engineering Corporation September 1988 to October 1992 (4 years 2 months): Major Projects: NPC Gas Turbine Power Barges (John Brown Engineering), PNOC Coal Carrier Conversion of Lake ...
- 2021 Apr 01
Teresa, Rizal, Philippines
... 2017 Project Undertaken GN POWER 600X2 MW SUPERCRITICAL COAL FIRED POWER PLANTPROJECT Company: Position: 21TH CONSTRUCTION DEVELOPMENT CORP SAFETY OFFICER Company Address: #28 Blk. 94 Lot 12 R. Papa Ave. Cor. P. Garcia St., AFPOVAI Village Taguig ...
- 2021 Mar 28
Quezon City, Philippines
... • Ensure compliance on the conditions set forth in the Environmental Compliance Certificate issued for the Coal Mining and Development Project. • Works closely with the Environmental Consultants and promptly provide all necessary required documents ...
- 2021 Mar 10
Quezon City, Philippines
... Industry: Construction of Coal Powerplant Address: Mauban, Quezon Province, Philippines Position: Project Tube Welder Dates: December 14, 2017 – March 8, 2018 Duties and Responsibilities: •Weld pipes using TIG and plates, beams, and bars using SMAW ...
- 2021 Feb 28