Planning Manager

Offer global experience in Saudi Arabia, Qatar, Palau, Federated States of Micronesia, Iraq, Dubai Vietnam, Mongolia, and Taiwan. Participated in more than 50 construction projects. Career reflects several years of experience in industrial processing, energy, commercial and residential construction industries. Proven expertise in planning, estimating, data cost analysis support, cost saving strategies, strategic planning, internal and external customer service, Project management, Project team collaboration, production management, and executive presentations. Leveraged planning expertise in delivering success to major projects ranging from $50 million to $1.5 billion. Diversified projects include a sulfur process manufacturing facility, power generation plants, wastewater treatment plants, medical facilities, airports, hotel and residential high-rise buildings, and more. Personal Data:

Date of Birth 19 March 1956

Place of Birth Manila, Philippines

Height 165 cm

Weight 60 kg

Religion Roman Catholic

T.I.N. 108-292-821

S.S.S. 03-4947955-4

Spouse’s Name Marilou Tiglao Caringal

No. of Dependents Four (4)

Education / Computer Knowledge

Bachelor of Science in Mechanical Engineering - Far Eastern University, Manila, Philippines Primavera P6 v18.3 MSProject MS Office

Personal References:

Paul Furst

Senior Start-up Manager

URS Corporation

Boise, Idaho

Email: adobco@r.postjobfree.com

Sina Moayedi

President- Montage/Icun JV

3636 16th Street, N.W., Suite AG50, Wash. D.C.

E-mail: adobco@r.postjobfree.com

John Wells Ian A. Campbell

Project Director – Beton Bau Phils., Inc President- IACAI Email: adobco@r.postjobfree.com Unit 604 Cattleya Condominium 235 Salcedo St., Legaspi Village,

Makati City, Philippines

E-mail: adobco@r.postjobfree.com

Seminars/Training:

Engineering Expertise Services -18 January 2005

Time Writing for Project Systems-12 Jan 2005

Reporting System -30 November 2004

Financial and Engineering & Project

Management-29 June 2004

Inventory Control-25 May 2004

Primavera User Conference- December 1999

JCG Resume OCT 2020

Page 2 of 8

Career History

BETON BAU PHILIPPINES, INC. (Dec 2020-Current)

Designation: Planning Management Consultant

Salcedo Bldg., Severina Ave., Severina Subd.,

Km. 18 South Superhighway, Paranaque City,

Metro Manila, Philippines

Projects:

2x600MW Atimonan SCCPP Site Development Works

Duties & Responsibilities

• Conceptualization and development of construction planning and scheduling of the 2x600MW Atimonan SCCPP Site Development Works

• Overall responsible for monitoring of daily activities, evaluation and analysis of updates issues and risks.

• Development of Monthly Reports

• Development of Look Ahead Schedules

• Schedule Resource loading and updating and Earned Value Analysis DELTA EARTHMOVING, INC. (Dec 2018-Dec 2019)

14th Floor Cyberone Condominium Eastwood Bagumbayan Quezon City, Philippines Designation: Engineering & Planning Management Consultant Projects:

2x600MW Atimonan SCCPP Site Development Works

Pagbilao Power Plant Site Development Works

Duties & Responsibilities

• Conceptualization and development of construction planning and scheduling of contracted projects.

• Overall responsible for monitoring of on-going projects, evaluation and analysis of updates issues and risks.

• Development of Project Execution Plan, Methodologies, Construction Schedules for Tender projects.

AECOM Philippines, Inc. (Sep 2017-Oct 2018)

14th Floor Bonifacio Stopover Corporate Center, 2nd Ave. cor.31st St., FBGC, Taguig City, Philippines Designation: Senior Planning Manager

Projects:

RCBM Cement Capacity Development-Norzagaray, Bulacan, Iligan City, Batangas City Duties & Responsibilities:

• Conceptualization and development of construction planning and scheduling of contracted projects.

• Overall responsible for monitoring of on-going projects, evaluation and analysis of updates issues and risks.

• Advises concerned construction departments of any risks that affect the timely completion of the project and recommends recovery plans & methods.

• In –charge review of Contractor’s weekly and monthly progress reports

• Delay, Disruption, Time and Cost Impact Analyst

• In-charge in Monthly Planning Report, Progress dashboard presentation, KPI analyses required by Client

• Planning & Control Meeting presider

Meralco lndustrial Engineering Corporation (MIESCOR) (Sep 2016 Aug 2017) 5th Floor Renaissance Tower1000, Meralco Ave., Pasig City, Philippines Designation: Head, Planning and Resource Management Projects:

• 40MW Solar Farm-Naic, Cavite, Philippines

• 115kV Switchyard & Transmission Line

• Power Tech Building—Meralco Compound, Ortigas Ave., Pasig City, Philippines JCG Resume OCT 2020

Page 3 of 8

• Bacolod Overhead Transmission Line—Bacolod City, Philippines

• TVI Magdugo & Bato Switchyard & Substation—Cebu & Panay Island Philippines

• Balingasag 3X55MW CFB Power Plant—Cagayan De Oro City, Philippines

• Hedcor OHTL & Switchyard—Bukidnon, Philippines

• Kirahon Substation & Switchyard,—Mindanao, Philippines Duties & Responsibilities:

• Conceptualization of project execution plan and the development of construction planning and scheduling of contracted projects.

• Overall responsible for monitoring of ongoing projects including EVMS, evaluation and analysis of updates issues and risks.

• Advises concerned construction departments of any risks that affect the timely completion of the project and recommends recovery plans & methods.

• In –charge in the preparation of weekly and monthly progress reports and Project Execution Plan of awarded projects.

• Delay, Disruption, Time and Cost Impact Analyst

First Balfour,Inc. (Sep 15, 2014-Sep 2016) Km 19 West Service Road, Paranaque City Designation: Planning Control Manager

Projects:

• San Gabriel Avion CCGT Power Plant Project-Batangas City, Philippines

• ePLDT Data Center-Makati City & Clark Economic Zone Philippines

• Masinloc Power Plant Employee Housing Facilities-Zambales, Philippines

• ABS-CBN Horizon Project- Bulacan, Philippines

• Yazaki Torres Manufacturing Facility- Sto. Tomas, Batangas, Philippines

• Kirahon Solar Power Project- Misamis Oriental, Philippines

• FPIP RBF Buldings- Sto. Tomas, Batangas, Philippines

• NLEX Widening Project

Duties & Responsibilities:

• Overall responsible for preparation of tender projects schedules and methodologies.

• Overall responsible for monitoring of current projects including EVMS and evaluation and analysis of updates issues and risks.

• Advises concerned construction departments of any risks that affect the timely completion of the project.

• Assist in the preparation of weekly and monthly progress reports and Project Execution Plan of awarded projects.

SAMSUNG C&T (2014)

Ulaan Baatar, Mongolia

Designation: Planning Manager

Projects:

• New Ulaan Baatar International Airport

Duties & Responsibilities:

• Overall responsible for planning of all phases of the contract including preparation and updating and analysis of the master programme.

• Planning related issues of concerned departments. Authorized to instruct Sub- Contractors and Managers on planning related issues as agreed with the Project Director.

• Advises concerned construction departments of any risks that affect the project status and the timely completion of the project.

• Reviews method statements and work executions by Sub-Contractors and agrees on revisions of methodologies relative to timely work completion.

• Overall responsible for developing progress measurement methods and periodic project accomplishments.

• Overall responsible in preparation of Weekly, Monthly and Management Reports. JCG Resume OCT 2020

Page 4 of 8

D. M. CONSUNJI, INC (2012-2014)

Makati City, Philippines

Designation: Planning Manager

Projects:

2x150 MW CFB Coal Fired Power Plant-Calaca, Batangas

1x135 MW CFB Coal Fired Power Plant-Calaca, Batangas

1x15 MW CFB Coal Fired Power Plant-Aklan, Philippines Duties & Responsibilities:

Pre-construction stage:

• Conceptualization of project execution plan and the development of construction planning and scheduling of the main infrastructure (Coal Storage and Bunkers, Pipeline for Water Supply, coal loading and offloading areas as well as conveyor belts, coal yard, waste water treatment facilities, switch yard, offices and maintenance areas and other BOP Systems)

• Creation of the logic network and defining the critical path, WBS framework and activity code structure

• Resource planning

• Development of mechanisms for project cash flow monitoring

• Cost control thru man & equipment hours

• Project budgeting

• Over-all planning for the control yard utilization & facilities planning. Construction Stage

• Preparation of cardinal program charts and detail pert monitoring

• Project progress monitoring

• Project tracking of critical project deliverables

• Recommending workarounds in mitigating impacts and resolution of issues and risk

• Participated in project management meetings to meet project targets on time and within cost

• Active participant in the development of project methodologies and schedule compliance

• Member in the preparation monthly progress report

• Participated in client and senior management periodic project review meetings. I.A. CAMPBELL & ASSOCIATES, INC. (2011-2012)

Development and Project Management Makati City, Philippines Designation: Planning Manager

Projects:

• The Mind Museum

• Metro Gaisano Alabang Mall

• The Capital Towers (36 floors)

• Bay Garden Residences (29 floors)

• Globe Telecom Headquarters(27 floors)

• Marco Polo Plaza (28 floors)

• Four Season’s Riviera (28 floors)

• Every Nation Church(7000 sq.m GFA)

• West Superblock (PSE) (66 floors)

• San Miguel Residences (3 bldgs-38 floors ea)

Duties & Responsibilities:

• Prepare Project Execution Plan of awarded PM/CM projects

• Prepare preliminary summary schedule for the project.

• Prepare design development program and maintain control of the Client's objectives.

• Prepare detail schedules for site analysis and developmental appraisal.

• Formulate project progress measurements and invoicing procedures.

• Construction phase review, evaluation, and analysis of Contractor's construction methodology, Contractor's Quality Control Program and variables and analysis of Construction Budget in relation to construction schedule.

• Oversee the establishment of Monthly Project Progress and Executive Management Report.

• Initiate contract administration procedures, monitor and report program performance. JCG Resume OCT 2020

Page 5 of 8

ARCHETYPE GROUP (2010 – 2011)

Designation: Planning Consultant

Projects:

• An Binh Star CT2 High Rise Apartments- Hanoi, Vietnam

• Everrich II High Rise Apartments- HCM City, Vietnam

• Archetype HCMC & Hanoi design contracts

Duties & Responsibilities:

• Develop Project Execution Plan (PEP)

• Prepare design development program and maintain control of the Client's objectives.

• Review, evaluation, and analysis of Contractor's construction methodology, Contractor's Quality Control Program and variables

• Analyze Construction Budget in relation to construction schedule.

• Formulate project progress measurements and invoicing procedures.

• Prepare cash flow of the entire project duration

• Prepare guidelines of Monthly Project Progress Report and Executive Management Report.

• Formulate contract administration procedures, monitor and report program performance, management meetings, and develop Management Reporting System on Time, Cost, Quality and Safety.

URS CORPORATION (2008 – 2010)

Boise, Idaho

Designation: Planning and Scheduling Analyst IV

Projects:

• Common Sulfur Project-Ras Laffan Industrial City- Qatar

• 490 MW Gas-Fired Combined Cycle GT Starbuck Power Plant Project -Taiwan R.O.C.

(Completed June 2009)

Duties & Responsibilities:

• Reporting project planning analysis and progress on weekly basis to stakeholders and line managers

• Reviewing and analyzing Contractor, Sub-Contractors and Vendors project schedules across different work phases

• Maintaining contacts with external parties such as Contractors, Sub-Contractors, and Vendors regarding work programme and work methodologies

• Managing project planning reviews and approvals

• Introducing and implementing new scheduling and planning tools to Contractors such as Primavera Enterprise 6.0 and web based myPrimavera

• Ensuring adherence to company policies on cost, schedule, and quality management

• Ensuring work delivered by contractors fulfills quality requirements for cost, planning, and scheduling

MONTAGE/ICUN JV (2007)

3636 16th Street, N.W., Suite AG50, Washington D.C. 20010 Designation: Assistant Project Manager

Projects:

• U.S. Embassy Facility Koror, Republic of Palau

• U.S. Embassy Facility Pohnpei, Federated States of Micronesia Duties & Responsibilities:

• Assistant to the project manager for the construction of the U.S. Embassy facility in Koror, Palau and Pohnpei, Federated State of Micronesia.

• Duties encompass all construction management aspects including but not limited to preparation of daily, weekly, monthly progress reports, preparation and updating of the construction schedule QA/QC submittals, progress monitoring and billing, cost control and projection.

• Quantity survey, maintaining as build notes and drawings, sub-contract management, general office file management and document organization. JCG Resume OCT 2020

Page 6 of 8

• Preparation of design and construction queries and conflicts using the U.S. Department of State Overseas Building Operations on line Projnet system AKINISI & EKIN JV (2006-2007)

P.O. Box 22810 Doha, State of Qatar

Designation: Senior Planning Engineer

Projects:

• New Doha International Airport Project, Doha Qatar Duties & Responsibilities:

• Prepare over-all work schedule of the sub-contract package in conformance to the main contract schedule

• Prepare detailed mechanical works schedule derived from the main contract schedule

• Determine resources required as defined in the over-all works schedule

• Tracking of work performed and assess delays affecting the over-all work scope.

• Determine actual person-hours spent and materials used in every activity performed.

• Advice construction group for any deviation in work programme, delays and other reports required by the main contractor.

• Preparation and update of project budget, cost control report, project expenses, progress Invoice

• Review of shop drawing, procurement register, method statement and Inspection Test Package

SAUDI IRON & STEEL COMPANY (2003-2006)

P.O. Box 10053 Madinat, Al-Jubail, Al-Sinaiyah, Kingdom of Saudi Arabia Designation: Project Planner

Projects:

• SAUDI IRON & STEEL COMPANY Expansion

Duties & Responsibilities:

• Drafting organizational structure and team development for Project Management of the 1.5B US$ multi steel manufacturing facility.

• Develop all preliminary schedules of the five (5) mega steel plant facility projects, the Engineering study, Procurement phase, and the Construction up to Final Acceptance.

• Perform thorough analysis of Construction Budget in relation to construction schedule disciplines.

• Formulating project progress measurements and invoicing procedures.

• Prepare cash flow (s-curve) of the entire duration of the project, Monthly Project Progress Report and Executive Management Report.

• Initiate, plan, execute, control, and close all relevant activities, which a project is involved

• Ensure project includes all the work required to complete the project successfully.

• Ensure timely completion of the project consisting of activity definition, activity sequencing, activity duration estimating, schedule development, and schedule control

• Ensure project is completed within the approved budget via resource planning, cost estimating, cost budgeting, and cost control.

I.A. CAMPBELL & ASSOCIATES, INC. (2000-2003)

Development and Project Management Makati City, Philippines Designation: Senior Planner/Programmer

Projects:

• Philippine Bank of Communications Tower

• Roxas Triangle Lobby and Amenities

• Ninoy Aquino International Airport Terminal 3

• The New Medical City

• Fort Bonifacio Medical Center

• DHL Manila Hub

• Sun Life of Canada Philippines and Asia-Pacific Headquarters

• Ayala Corporation Boardroom

Duties & Responsibilities:

JCG Resume OCT 2020

Page 7 of 8

• Prepare schedules for site analysis and developmental appraisal, environmental studies and market surveys as required.

• Prepare design development program and maintain control of the Client's objectives.

• Construction phase review, evaluation, and analysis of Contractor's construction methodology, Contractor's Quality Control Program and variables and analysis of Construction Budget in relation to construction schedule.

• Formulate project progress measurements and invoicing procedures.

• Prepare cash flow for the entire project duration, Monthly Project Progress Report and Executive Management Report.

• Initiate contract administration procedures, monitor and report program performance.

• Initiate management meetings, and maintain Management Reporting System on Time, Cost, Quality and Safety.

• Development of post construction program for all defects list, collate warranties, manuals and as- built drawings, process final certificate and prepare end-of-project report for the Client.

ABDULLAH H. AL-SHUWAYER CO. (1997-2000)

P.O. Box 515 Dammam, Kingdom of Saudi Arabia

P.P. Designation: Planning Engineer

Projects:

• Shedgum Gas Plant Debottlenecking Project, Saudi Aramco Shedgum, KSA

• Yanbu Petrochemical Plant (Yanpet), Yanbu, KSA

• Saudi Aramco Abqaiq Sewer Treatment Plant, Abqaiq, KSA

• Saudi-Bahrain Causeway Office Buildings, Saudi Bahrain Causeway

• Al-Ahmadi Medical Center, Al-Qatif, KSA

Duties & Responsibilities:

• Develop Project’s Master schedule composed of scope, cost, schedule, resources, procurement and negotiation schedules, communications risks, and integration of both.

• Develop Cost and schedules in Primavera Project Planner and project controls in Expedition Contract Control.

• Prepare project cash flows corresponding to agreed time distributed expenditures in conformance to the over-all project schedule.

• Monitor and track daily construction events and analyze construction methodology

• Assess variation proposals and formulate measures to mitigate delays which impact to project completion.

PLUS BUIDERS, INC. (1987-1992)

1725 M. Adriatico St., Malate, Manila, Philippines Designation: Operations Manager

Duties & Responsibilities:

• Manages subdivision and mass housing development from design to contract documentation and construction; Loan Processing Consultant; Waterworks Manager SOCIETE AUXILIAIRE D’ ENTREPRISES (SAE) (1984- 1987) P.O. Box7394Dammam, K.S.A.

Designation: Cost Control Engineer

Projects:

• Al-Qatif & Al-Ahsa General housing Project, Al-Qatif & Al-Ahsa, KSA Duties & Responsibilities:

• Construction direct & indirect cost analysis; subcontract works Progress evaluator

• Contract cost compliance analyst

JCG Resume OCT 2020

Page 8 of 8

KHALID BIN HAMAD AL-DOSSARY TRADE &CONTRACTS (1981-1984) P.O. Box 281, Al-Khobar, K.S.A.

Designation: Cost & Planning Engineer

Projects:

• Aramco ESD Heavy Equipment Repair Facility, Dhahran, KSA

• Aramco ESD Training Facility, Dhahran, KSA

• Aramco Phosphate Injection Plant, Dhahran, KSA

• Aramco Water & Sewer Systems Replacement, Abqaiq, KSA

• Aramco Off-shore Gas Plant, Ras Tanajib, KSA

• Tank foundations for Saudi Petro-Chemical Plant, Jubail, KSA Duties & Responsibilities:

• Develop Project’s Master schedule composed of scope, cost, schedule, resources.

• Cost and schedules Construction &Bid Planner & Scheduler, Construction& Bid Cost Engineer