Alex M. Vengua
Contact No.: TNT:+63-927-***-****
Email address: admt72@r.postjobfree.com
Career Summary
Over 15 years’ experience in structural steel detailing and 10 years’ experience in oil gas platform detailing.
Experience
CAD Operator / Detailer
PHESCO, INC. - Quezon City
January 2018 to December 2019
Duties and Responsibilities:
- Prepares shop drawings and detailing of various works at site using CAD.
- Coordinates with and consults Department Head regarding design, layout or detail components and resolves design issues in case of problems.
- Performs site measurements, data gathering, and verification among others as required to prepare drawings/details.
- Reviews and analyzes specifications, sketches, drawings, details and related data to assess factors affecting designs and the procedures and instructions to be followed.
- Modifies and revises designs/drawings to correct deficiencies, positions, inclusions and comments unto drawings.
- Inspects, coordinates and monitors actual works as instructed.
- Plots coordinates geometry (COGO) from survey data points by surveyor at site.
- Prepare topo map using AutoCAD Civil 3D from survey data points of surveyor at site.
- Performs other duties that may be assigned from time to time. Projects involved:
1. El Nido Sewage and Solid Waste Treatment Plant Project - El Nido, Palawan. 2. Borbon Heights Phase 1 & 2 Project - Borbon, Cebu 3. Bulkwater Project – Borbon, Cebu
4. PHESCO Crusher Plant and Batching Plant
Mechanical Designer (Dubai Petroleum Projects):
Dubai Petroleum Establishment, Dubai
December 2013 – March 2016
Duties and Responsibilities (Project CAD Coordinator):
- Prepare engineering drawings (mechanical/structural) both in design and shop drawings for topsides and jackets.
- Prepare Anomaly drawings for oil rig platforms.
- Prepare as-built drawings for piping/P&ID/structural plans.
- Prepare rig move and approach drawings.
- Provide AutoCAD Autolisp programs to enhanced and streamlined production.
- Responsible for all CAD related coordination (customization). Projects involved:
- All Dubai oil rig platforms.
Alex M. Vengua - Page 2 of 8
Senior Draftsman (Aramco, Ras Gas and Qatar Gas Projects): J. Ray McDermott Middle East, Inc., Dubai.
February 2004 – December 2013
Duties and Responsibilities (Team Lead: Nesting):
- Supervise nesting group in the preparation of nesting layout and compilation of plate N.C. programs to be used in plate cutting
- Provide technical support in troubleshooting AutoCAD problems.
- Help developed AutoCAD’s Autolisp and VBA programs to streamlined tasks.
- Help developed/troubleshoot Excel Macro/VBA programs to streamlined tasks.
- Prepare lofting for structural steel members such as plate girders for riser guides, platforms and other miscellaneous members (handrails, gratings and stiffeners) relevant to offshore steel structures.
- Prepare cutting list for every members lofted.
- Checked every lofted and detailed cutting lists. Projects involved:
ONGC Cluster-7 Well Platform Project, India
Saudi Aramco-Karan Gas Field Development Offshore Platforms and Subsea Pipelines Project Saudi Aramco-Fabrication, Transportation and Installation of Manifa Decks/Jackets Saudi Aramco- Fabrication, Transportation and Installation of LTA Decks/Jackets Saudi Aramco-Fabrication, Transportation and Installation of LTA BI-10-3008 Maintain Potential Facilities Safaniya and Berri
Aramco MPOT–WELLHEAD JACKET (16 Jackets)
Aramco MPOT–WELLHEAD JACKET (5 Jackets, 5 Decks & 3 Tie-In Platform) Qatar Gas 3 & 4 Offshore Facility Project (WHP7, WHP8 & WHP9) A.I.O.C. ACG Full Field Dev. Phase-2 & 3 (EA, CA, WA & DUQ Platform) Qatar Liquefied Gas Co., Ltd (II) (WH4, WH5 & WH6 Jackets & Temp. Deck) Dolphin Project Upstream Offshore Facilities (Bridge/Flare Platforms) Qatar Petroleum Living Quarters & Power Upgrade Project (Jackets & Bridges) Ras Laffan Liquefied Natural Gas Co. Ltd. (II) Offshore Expansion Project
(WH4, WH5, WH6, WH9 & WH10)
Al-Khafji Joint Operations, Installation of Integrated Well Jackets (IWJ-2 & IWJ-3) Aramco MPOT–WELLHEAD JACKET (16 Jackets)
Aramco MPOT–WELLHEAD JACKET (5 Jackets, 5 Decks & 3 Tie-In Platform) Qatar Gas 3 & 4 Offshore Facility Project (WHP7, WHP8 & WHP9) A.I.O.C. ACG Full Field Devt. Phase-2 & 3 (EA, CA, WA & DUQ Platform) Qatar Liquefied Gas Co., Ltd (II) (WH4, WH5 & WH6 Jackets & Temp. Deck) Dolphin Project Upstream Offshore Facilities (Bridge/Flare Platforms) Qatar Petroleum Living Quarters & Power Upgrade Project (Jackets & Bridges) Ras Laffan Liquefied Natural Gas Co. Ltd. (II) Offshore Expansion Project Al-Khafji Joint Operations, Installation of Integrated Well Jackets (IWJ-2 & IWJ-3) Senior Structural Draughtsman (Azerbaijan Int’l Oil Company Projects): J. Ray McDermott Caspian Contractors, Inc. Baku
June 2003 – October 2003
Duties and Responsibilities:
- Provide trainings to local Azeri in preparation of engineering shop and design drawings.
- Provide Autolisp programs to streamlined task.
- Checked every lofted and detailed cutting lists. Projects involved:
A.I.O.C. Phase I and II CA & WA Topsides
Alex M. Vengua - Page 3 of 8
Structural Detailer/Xsteel/ACAD Detailer (Aramco, Saudi Arabia Projects): Gulf Steel Works, Jubail, Kingdom Of Saudi Arabia
April 2001 – July 2002
Duties and Responsibilities:
- Provide shop drawings in AutoCAD and/or Xsteel format to be used in fabrication of steel elements particularly columns, beams, trusses, girts, purlins, etc. for structural steel structures such as pipe bridges/racks, platforms and other industrial steel bldgs.
- Provide erection drawings to be used as guides in erecting structural members by erectors/contractors.
- Prepare preliminary /final material take off, production progress report, cutting lists and MTO for quotation to be used for bidding.
Projects involved:
Polyethylene Plant, Jubail K.S.A. - Saudi Toyo Eng'g Co. Haradh Gas Plant Industrial Support Facilities, Haradh K.S.A-Saudi Constructioneer Est. Haradh Gas Plant Utilities/Offsite S.A., Haradh K.S.A. -Technip Fire station Additional Support, K.S.A. - Saudi Consolidated Electric Co. I & M Bldg. Communication Facilities, K.S.A. – Saudi ARAMCO Jubail United Petrochemicals Company Main Substation Sub.82MS - Fluor Daniel Intercontinental- Nesma Eng'g
ARASCO Feedmill Dammam, Dammam K.S.A. – Arabian Agri. Services Company (ARASCO) Structural Steel Detailer
Steel Centre Philippines., Inc.
March 1998 – January 2001
Duties and Responsibilities:
- Provide shop drawings consist structural details of structural steel elements such as trusses, columns, beams, braces, girts purlins, etc.
- Prepare erection drawings to be used as guide in erecting structural members for erectors
/engineers.
- Prepare bill of materials for every detailed sheet.
- Follow specifications, grade of material, etc.
Projects involved:
Makro Store 5, Harboure Centre, Tondo, Manila – Filipinas Makro, Inc. Pacific Plaza Towers, Fort Bonifacio Global City – Pacific Plaza Towers, Inc. Rockwell Center Retail and Hotel Project, Makati City - Rockwell Land Corporation Futaba Co. of the Phils. Project (Phase- 3), Manila – Futaba Company
TIP Phase-2 Construction Works, Laguna Techno. Park, Laguna, Phils. – Toshiba Structural Detailer/CADD Operator
Samsung Design Philippines, Inc.
March 1996 – February 1998
Duties and Responsibilities:
- Provide shop drawings particularly foundation plans, foundation details, structural floor framing plan of high rise reinforced concrete buildings.
- Prepare schedule of reinforcements for columns, shearwalls, beams, link beams, footing tie beams and post-tensioned beams.
- Prepare bill of materials for every detailed sheet. Alex M. Vengua - Page 4 of 8
Projects involved:
PBCom Tower, Ayala Ave., Makati City- Filinvest Land, Inc. ICEC Tower, Ayala Ave., Makati City-ICEC Land Corp. Senior CADD Operator
Aromin & Sy + Associates, Inc., Philippines
April 1995 – February 1996
Duties and Responsibilities:
- Provide design drawings particularly foundation plan, foundation details and
- Prepare drawings relevant to the design of reinforced concrete high rise buildings.
- Prepare schedule of reinforcements for columns’, shearwalls, beams, link beams, footing tie beams and post- tensioned beams and other structural elements relevant to the design of reinforced concrete high rise buildings.
Projects involved:
PBCom Tower, Ayala Ave., Makati City-Filinvest Land, Inc. JAKA Tower I, Ayala Ave., Makati City-JAKA Properties Inc. ICEC Tower, Ayala Ave., Makati City-ICEC Land Corp. Rockwell Center Retail and Hotel Project, Makati City - Rockwell Land Corporation Bellevue Condominium, Tagaytay - Belle Corporation Roxas Triangle, Makati City - Ayala Land, Inc.
Days Inn Tagaytay Volcano Lake View Hotel, Tagaytay - Days Inn Phils., Inc. Days Inn Cebu, Lapu-Lapu City, Cebu, Mactan Island - Days Inn Phil., Inc. 6811 Ayala Avenue, Ayala Ave., Makati City – Ayala Land, Inc. 6790 Ayala Avenue, Ayala Ave., Makati City – Ayala Land, Inc. West Tower I, South Superhighway – Skycity Properties, Inc. Madrigal Business Park Office Building, Alabang Muntilnlupa, M.M. - Ayala Land, Inc. Wynsum Tower, Emerald Ave.,Ortigas Center,Pasig City-Wynsum Realty Developer, Inc. URBANBANK Plaza, cor. Gil Puyat & Chino Roces, Makati City - URBANBANK Inc. KINGSWOOD Tower, Makati City - AMANU Realty Corp.
Structural Steel Detailer
Steel Centre Phils., Inc.
June 1994 – March 1995
Duties and Responsibilities:
- Provide shop drawings consist of structural details of structural steel elements such as trusses, columns, beams, braces, girts purlins, etc.
- Prepare erection drawings to be used as guide in erecting structural members for erectors/engineers.
- Prepare bill of materials for every detailed sheet.
- Follow specifications, grade of material, etc.
Projects involved:
Ten Storey Office Building, EDSA, Quezon City - A.Francisco Realty and Dev't Corp. Quezon City Quality Control and Quezon Seed Storage, Quezon City - Asiakonstruct Makati Supermart Bridgeway Makati City Makati Supermart
Philips Semiconductors Manila (PSM) Plant, Cabuyao, Laguna - Light Ind. and Science Park (LISP) Alex M. Vengua - Page 5 of 8
Civil Engineer/AutoCAD Operato
Dar-Al-Taawon Engineering Consultants
March 1993 – May 1994
Duties and Responsibilities:
- Provide architectural, structural, mechanical and electrical design drawings for vertical structures.
- Provide road layouts, road profiles and sections. Projects involved:
Al-Bilad Catalyst Co. Ltd. Plant, Al-Jubail K.S.A. - Al-Bilad Catalyst Co. Draftsman/CADD Operator
Asia-America Technological Industries Corporation
September 1992 – March 1993
Duties and Responsibilities:
- Provide structural plans namely foundation plan, details and sections, roof plan, roof framing plan and other relevant structural plans for warehouse, substation and other industrial buildings.
- Prepare cost estimate and bill of materials of every project.
- Prepare employees' payroll.
Projects involved:
Twisting Plant, Bo. Tanong, Marikina, Metro Manila – Manila Bay Spinning Mills, Inc. Extension Warehouse, Lipa, Batangas - Sunflower-Agro Industrial Office Roof Framing Renovation, P. Medina St., Makati City - ELTA Industries, Inc. Gymnasium, 11th St., New Manila, Q.C. - Mr. Michael Tan
Structural Steel Detailer
South Pacific Detailing, Inc.
April 1998 – August 1992
Duties and Responsibilities:
- Provide shop drawings consist of structural details of structural steel elements particularly trusses, columns, beams, braces, girts purlins, etc.
- Prepare erection drawings to be used as guide in erecting structural members for erectors/engineers.
- Prepare bill of materials for every detailed sheet.
- Follow specifications supplied particularly bolt specification, paint specification, grade of material, etc.
Projects involved:
Paiton Steam Power Plant, Republic of Indonesia
Refuse Steam Power Plant, U.S.A. - Island Creek Coal Company Alpine Preparation Plant, Bayard West Virginia, U.S.A. State Compensation Insurance Fund, Oxnard California, U.S.A. Alex M. Vengua - Page 6 of 8
Firms
Jan 2018 - Present PHESCO, Inc., Q.C., Philippines Dec 2013 - Mar 2016 Dubai Petroleum Establishment, Dubai Feb 2004 - Dec 2013 Dermott Middle East, Inc. Dubai Jun 2003 - Oct 2003 J. Ray McDermott Caspian Contractors, Inc., Baku Aug 2002 - May 2003 J. Ray McDermott Middle East, Inc. Dubai Apr 2001 - Jul 2002 Gulf Steel Works, Jubail, Kingdom Of Saudi Arabia Mar 1998 - Jan 2001 Steel Centre Phils., Inc.
Mar 1996 - Feb 1998 Samsung Design Philippines, Inc. Apr 1995 - Feb 1996 Aromin & Sy + Associates, Inc. Jun 1994 - Mar 1995 Steel Centre Phils., Inc.
Mar 1993 - May 1994 Dar-Al-Taawon Engineering Consultants Sep 1992 - Mar 1993 Asia-America Technological Industries Corporation Apr 1988 - Aug 1992 South Pacific Detailing, Inc.
Education
B.S. in Civil Engineering
University of Santo Tomas, 1988
Passed Government Licensure Board Exam, 1989
Seminars and Workshops Attended
" CAU Express 2015 CADWorx Seminar"
held at Shangri La Hotel, Sh. Zayed Road
on April, 2015
“Microsoft Access 2007 Basic/Intermediate/Advanced” Training Course held at ExecuTrain, Dubai.
on 8th to 10th October, 2012
“AutoCAD 2007 & Autodesk Architectural Desktop 2007 Software Seminar” held at Shangri La Hotel, Sh. Zayed Road
on 2nd May 2006
“Quality Awareness Training – Level 2
held at JRM Training Room
on 21st September 2005
"Primary and Advanced Xsteel v6.1 Training"
held at Gulf Steel Works
on 14th to 24th October, 2001
"Xsteel-The 3D Steel Work Solution Seminar"
held at the Daungan Restaurant, South Triangle, Q.C. on November 20, 2000
Alex M. Vengua - Page 7 of 8
"Project and Construction Management Seminar"
held at the Continuing Medical Education Auditorium University of Santo Tomas, Espana, Manila
on October 30-31, 1997
"Highway and Bridges Seminar"
held at the Continuing Medical Education Auditorium University of Santo Tomas, Espana, Manila
on June 21-22, 1996
"Seminar on the Design of a Four-Storey Reinforced Concrete Building, A Case Study" held at the Architectural Centre Club Palma St., Makati City on February 26-27, 1993
Proficiency in Computer-Aided Structural Analysis Course conducted at the Ateneo Computer Technology Center, Makati City on February 24-March 27, 1990
Proficiency in Computer-Aided Drafting and Design Course conducted at the Ateneo Computer Technology Center, Makati City on February 22-March 27, 1990
Proficiency in Logic Formulation Course
conducted at the IMPACT Center, De La Salle University, Manila on January 21- March 11, 1989
Personal Details
Address: 14D. Cabotage St., Barangay Paltok, San Francisco Del Monte Quezon City
Date of Birth: March 6, 1966
Age: 53 years old
Nationality: Filipino
Gender: Male
Marital Status: Married
Special Skills
Proficient in Autolisp/Visual Lisp/Visual Basic Programming/Menu Customization for AutoCAD 2015 and higher version. Familiar with Visual C# programming, AutoCAD Civil 3D, Microstation and Xsteel/Tekla Structure software.
Alex M. Vengua - Page 8 of 8
Reference
Phillip Owen Crighton Engr. Myla Jane C. Flores
Design Office Lead Project-In-Charge, Borbon Projects, Cebu Dubai Petroleum PHESCO, Inc.
Office: +971-*-***-**** Mobile No.: +63-092*-***-**** e-Mail: admt72@r.postjobfree.com
Ruel R. Alcantara Ms. Ria Tatlonghari
Drafting Supervisor HR/Admin., Borbon Projects
McDermott Middle East, Inc. Office PHESCO, Inc.
Tel. No.: +974*-******* Mobile No.: +63-977-***-**** AVAILABLE UPON REQUEST
I hereby certify that the above information is true and correct to the best of my knowledge. ALEX M. VENGUA