Rhannie M. Garcia
Email Add: adlghw@r.postjobfree.com
Mobile number: +63-945-***-****
WhatsApp number: +639**-***-****
Linkedin Account: rhannie garcia
Instagram Account: garciarhannie
Puting Bato West, Calaca Batangas
Passport No.: P7968090A
Objective:
To work in a company where requires greater individual responsibility for self-advancement and development towards the realization and attainment of company’s vision and mission statement in an attempt to complement and meet the demands of our society.
Work Experience:
MECHATRENDS CONTRACTORS CORPORATION
SITE PROJECT MANAGER
Project Handled:
MCMAI CEBU TRADING CORPORATION
CHEMICAL BULK DEPOT
Fabrication and Installation of Two (2) Receiving Line (from Plant to Jetty) Underground Pipe (Methanol)
Calaca Industrial Seaport Corporation, CISC
Calaca Batangas, Philippines
On-going Project
MCMAI CEBU TRADING CORPORATION
CHEMICAL BULK DEPOT
CAUSTIC SODA STORAGE TANK (1 Unit)
RECEIVING LINE AND SERVICE LINE
Calaca Industrial Seaport Corporation, CISC
Calaca Batangas, Philippines
Responsibilities:
Preparation and implementation of Project Execution Plan (PEP).
Attends the Weekly Project Meetings (Internal as well as with Client) and assist in preparation of Minutes of Meetings.
Monitors work in progress and progress and prepares weekly report of the status of each assignment.
Ensuring all procedures and calculations are submitted to the client for review and approval.
Coordinates materials and assists in the logistics, its shipment and receipt at construction site.
Coordinates with all project related personnel on day-to-day progress pf work activities, procurement and operations to ensure timely completion of the project.
Provide full support as required by the Management and PMT for all projects.
SR.QA/QC ENGINEER
Manggahan Street, Binakayan Kawit Cavite
December 2, 2019 up to February 2020
Project Handled:
MCMAI CEBU TRADING CORPORATION
CHEMICAL BULK DEPOT
CAUSTIC SODA STORAGE TANK (1 Units);
RECEIVING LINE AND SERVICE LINE
Responsibilities:
Responsible for ensuring that the quality management system (QMS) is fully implemented in an organized and efficient manner. The QA/QC Manager is responsible for delegating and assigning tasks to QA/QC Supervisors and working closely with related engineering, construction, fabrication, and repair departments.
Manage and oversee project quality to ensure compliance to codes, standards, regulations, equipment specific specifications, and QMS requirements.
Advancing quality achievement and performance improvement throughout the organization.
Managing the development and implementation of the QMS for planning, fabrication, inspection, documentation, and operations activities including:
Planning duties within the QA/QC staff and related work schedules;
Establishing service standards for end users (i.e., internal department or external customer);
Identifying and developing QA/QC personnel certification requirements and continuing education/training needs;
Providing leadership, mentorship, and direction of all QA/QC personnel.
Taking full responsibility for hold-point releases once all QMS functions have been completed and the equipment is ready to go into the next work stage.
Developing and implementing risk-based inspection (RBI) activities and processes, using API 580 and other similar programs to develop internal standard practices.
Managing plant integrity through a failure analysis reporting system and following up on recommendations.
Oversee supervision of all visual inspections and NDE, including 3rd party subcontractors.
Managing inspection, NDE, and testing plans for new construction, repair work, and alterations.
Identify and develop solutions to correct inspection function deficiencies.
Manage construction processes, plant equipment, inspection and NDE personnel certification and QMS internal audits.
OPERATION MANAGER
Ingenieria Construccion Corp.
Balagtas Centro Batangas City
March 25, 2019 up to November 20, 2019
Responsibilities:
Provide inspired leadership for the organization.
Make important policy, planning, and strategy decisions.
Develop, implement and review operational policies and procedures.
Assist HR with recruiting when necessary.
Help promote a company culture that encourages top performance and high morale.
Oversee budgeting, reporting, planning and auditing.
Work with senior stakeholders.
Ensure all legal and regulatory documents are filled and monitor compliance with laws and regulations.
Work with the board of directors to determine values and mission, and plan for short and long term goals.
Identify and address problems and opportunities for the company.
Build alliances and partnerships with other organizations.
Support worker communication with the management team. Other Various Projects Handled: Completed Project
Repair and Replacement of Slag Cooler (SLTEC)
Internal Repair of Chimney Fuel Liner (Ilijan Power Plant)
Repair and Restoration of Smoke Stack (Ilijan Power Plant)
Maintenance Inspection of Boiler (2 units) (PASAR,Leyte)
Repair and Replacement of Pipe(WWTP)-Steel Asia Phil.-Calaca
PROJECT MANAGER (Owner Representative)
PASAR, LEYTE
Boiler Integrity Assessment
Boiler Inspection and NDT Testing
TW Power Services Pty.Ltd.
Responsibilities:
Recruit, select, train, assign, schedule, coach, counsel and discipline employees
Communicate job expectations; planning, monitoring, appraising and reviewing job contributions
Plan and review compensation actions; enforcing policies and procedures
Contribute operations information and recommendations to strategic plans and reviews; prepare and complete action plans; implement production, productivity, quality and customer-service standards; resolve problems; complete audits; identify trends
Forecast requirements; prepare an annual budget; schedule expenditures; analyze variances; initiating corrective actions
Develop operations systems by determining product handling and storage requirements; develop, implement, enforce and evaluate policies and procedures; develop processes for receiving product, equipment utilization, inventory management and shipping
Analyze process workflow, employee and space requirements and equipment layout; implement changes.
Maintain safe and healthy work environment by establishing, following and enforcing standards and procedures; complying with legal regulations.
Update job knowledge by participating in educational opportunities; reading professional publications; maintaining personal networks; participating in professional organizations
Accomplish operations and organization mission by completing related results as needed
Meet or exceed operations labor budget expectations
Manage staff levels, wages, hours, contract labor to revenues
Responsible for all department managers and supervisors, with review/approval responsibility for all operations employees
Run a safe, injury/accident free workplace
Responsible for all aspects of vehicle and heavy equipment rentals
Establish contracts and pricing and ensuring proper maintenance and serving as primary liaison with utilities and local government agencies, such as fire, police, health and safety agencies
Manage relationships with key operations vendors
Track vendor pricing, rebates and service levels
Review and approve all operational invoices and ensure they are submitted for payment
Serve as primary point of contact when there are customer issues related to equipment quality, customer service, or accidents and mishaps on-site. In particular, this includes any issues on-site at client facilities, such as breaking a fence or tape residue on flooring
Communicate customer issues with operations team and devise ways of improving the customer experience, including resolving problems and complaints
Work closely with GM and management team to set and/or implement policies, procedures and systems and to follow through with implementation.
Communicate all operating policies and/or issues at department meetings
Work closely with the inventory manager and team to perform analysis of our inventory and ensure we are utilizing our inventory effectively, purchasing the right equipment, maintaining solid inventory data and reduce sub-rental expenses
Communicate with legal counsel and safety department to ensure all processes remain compliant with OSHA and other governmental regulations
PROJECT MANAGER
MLD Dynamics Construction Corp.
San Pascual, Batangas
March 5, 2018 up to March 16, 2019
Project Handled:
MABUHAY VINYL CORPORATION
NaOH Tank (Caustic Tank);
Scope: Foundation, Erection and Installation of Tank, and Pipe Line 2000 cu. m. 13.6 ID (2 units)
MVC- BBTI Depot. San Miguel Bauan, Batangas
Responsibilities:
Preparation and implementation of Project Execution Plan (PEP).
Attends the Weekly Project Meetings (Internal as well as with Client) and assist in preparation of Minutes of Meetings.
Monitors work in progress and progress and prepares weekly report of the status of each assignment.
Ensuring all procedures and calculations are submitted to the client for review and approval.
Coordinates materials and assists in the logistics, its shipment and receipt at construction site.
Coordinates with all project related personnel on day-to-day progress pf work activities, procurement and operations to ensure timely completion of the project.
Provide full support as required by the Management and PMT for all projects. SOUTH LUZON THERMAL ENERGY CORPORATION
Construction of Ash Pond Storage A2
CISC Phase 2, Brgy. Putting Bato West, Calaca Batangas Responsibilities:
Prepare, schedule, coordinate and monitor the assigned engineering projects
Monitor compliance to applicable codes, practices, QA/QC policies, performance standards and specifications.
Interact daily with the clients to interpret their needs and requirements and represent them in the field.
Perform overall quality control of the work (budget, schedule, plans, and personnel’s performance) and report regularly on project status.
Assign responsibilities and mentor project team.
Cooperate and communicate effectively with project manager and other project participants to provide assistance and technical support.
Review engineering deliverables and initiate appropriate corrective actions. Other Various Projects Involved:
Relocation of Eye Wash Station (8 units)
Repair of Sampling Port, Including Modification of Railings and Platform
Dust Collector Modification
Fabrication and Installation of Valves and Piping
Installation of Slag Cooler Support
Slag Cooler Inlet Chute Modification 1
Slag Cooler Inlet Chute Modification 2
Installation of Slag Cooler Vacuum Dust Piping
Provision of Manhole for Air Damper Unit 2
PROJECT QUALITY MANAGER
BSTECH ENG. CONSTRUCTION CORP.
Blasting and Painting Department Head
New Lube Oil Blending Project,
14 units of Storage Tank
Petron Corporation, JGC Project
Tondo, Manila
November 20 2017 up to January 20 2018
Responsibilities:
Coordinate project management activities, resources, equipment and information.
Liaise with clients to identify and define requirements, scope and objectives.
Assign tasks to internal team and assist schedule management.
Make sure that the clients’ needs are meet as project evolve.
Oversee project procurement management.
Monitor project progress and handle any issues arise.
Create and maintain comprehensive project documentation, plans and reports.
Ensure standards and requirements are met through conducting quality assurance tests.
PROJECT MANAGER
BSTECH ENG. CONSTRUCTION CORP.
April 2015 up to Nov. 15, 2017
Project Handled:
Erection and Installation of VCM SPHERICAL TANK
GENERAL CHEMICALS & RESINS CONSORTIUM INC.,
SHI-ASIA THAILAND CO., LTD.
Rosario Cavite
Project Engineer / Project in charge
BSTECH ENG. CONSTRUCTION CORP.
Fabrication and Installation of Methane, Biogas and Flare Piping Japan Gas Corp. Phils., Inc
ASEAGAS ABOITIZ Company
Bo. Malaruhatan, Lian Batangas
Fire Fighting System
(Including underground pipe-HDPE and Alarm System) Japan Gas Corp. Phils., Inc
ASEAGAS ABOITIZ Company
Bo. Malaruhatan, Lian Batangas
ECSB Settler Installation
HydroThane STP
ASEAGAS ABOITIZ Company
8.8 MW Biogas Power Plant Project
Bo. Malaruhatan, Lian Batangas
Binary 1 Brine Pipeline Rehabilitation
Aboitiz Power Renewables
Aboitiz Geothermal Plant
Makban, Laguna
San Gabriel Avion 97-115 MW POWER PLANT OCGT
Tank Construction-(include painting works)
EPC Project
Environ Servis- Slovakian company
First Gas power plant
Brgy.Bolbok, Batangas City
ATM TANKS (DOOM TYPE ROOF TANK)
Raw Oil Storage Tank (CO. 08.1)
22 M (ID) x 9.93 M (H)
Max. Capacity : 1870 cu.m
Treated Oil Storage Tank (CO.08.2)
Max. Capacity : 17 M (ID) x 7.5 M (H)
1700 cu.m
Raw Water Storage Tank (CO.05.1)
16.5 M (ID) x 7.4 M (H)
Max. Capacity : 1580 cu.m
Raw Water Storage Tank (CO.05.2)
16.5 M (ID) x 7.4 M (H)
Max. Capacity : 1580 cu.m
Demineralised Water Storage Tank (CO.05.3)
17.5 M (ID) x 7.8 M (H)
Max. Capacity : 1870 cu.m
Cooling Water Storage Tank (CO.05.1)
6 M (ID) x 2.9 M (H)
Max. Capacity : 81 cu.m
Responsibilities:
Recruit, select, train, assign, schedule, coach, counsel and discipline employees
Communicate job expectations; planning, monitoring, appraising and reviewing job contributions
Plan and review compensation actions; enforcing policies and procedures
Contribute operations information and recommendations to strategic plans and reviews; prepare and complete action plans; implement production, productivity, quality and customer-service standards; resolve problems; complete audits; identify trends.
Forecast requirements; prepare an annual budget; schedule expenditures; analyze variances; initiating corrective actions.
Develop operations systems by determining product handling and storage requirements; develop, implement, enforce and evaluate policies and procedures; develop processes for receiving product, equipment utilization, inventory management and shipping
Analyze process workflow, employee and space requirements and equipment layout; implement changes.
Maintain safe and healthy work environment by establishing, following and enforcing standards and procedures; complying with legal regulations
Update job knowledge by participating in educational opportunities; reading professional publications; maintaining personal networks; participating in professional organizations
Accomplish operations and organization mission by completing related results as needed
Meet or exceed operations labor budget expectations
Manage staff levels, wages, hours, contract labor to revenues
Responsible for all department managers and supervisors, with review/approval responsibility for all operations employees
Run a safe, injury/accident free workplace
Responsible for all aspects of vehicle and heavy equipment rentals
Establish contracts and pricing and ensuring proper maintenance and serving as primary liaison with utilities and local government agencies, such as fire, police, health and safety agencies
Manage relationships with key operations vendors
Track vendor pricing, rebates and service levels
Review and approve all operational invoices and ensure they are submitted for payment
Serve as primary point of contact when there are customer issues related to equipment quality, customer service, or accidents and mishaps on-site. In particular, this includes any issues on-site at client facilities, such as breaking a fence or tape residue on flooring
Communicate customer issues with operations team and devise ways of improving the customer experience, including resolving problems and complaints
Work closely with GM and management team to set and/or implement policies, procedures and systems and to follow through with implementation.
Communicate all operating policies and/or issues at department meetings
Work closely with the inventory manager and team to perform analysis of our inventory and ensure we are utilizing our inventory effectively, purchasing the right equipment, maintaining solid inventory data and reduce sub-rental expenses
Communicate with legal counsel and safety department to ensure all processes remain compliant with OSHA and other governmental regulations
QA/QC ASSISTANT MANAGER
BSTECH ENG.CONSTRUCTION CORP.
May 2014 up to April 2015
Project Involved:
52 M FeedMill Tower Building 2
Gerona Tarlac
Structural Fabrication
San Pablo Apostol Church
Velasquez, Tondo Manila
Structural Fabrication
SMART Tower Base Frame
SMART Communication Inc.
Client: SMART
Structural Fabrication
CB&I Project
North Mindanao Import and Facility Project
Client: JGC Phils.,Inc.
Job Code: 2-0359-15
P.O. Code: G-1015-P-2154-101-A
Painting Project
D.M. Consunji Inc.Project
1 x 135 Coal Fired Power Plant-Ph2
(21M Gantry Column)
Structural Project
AG & P Project
Lycopodium-Otjikoto Mine Project
B2 Gold Namibia (Pty) Ltd.
Painting: Area 500 (pipe tracks)
United Power System Phil.,Inc. Project
365 Street Lighting Poles
INC Project
Structural Project
Responsibilities:
Develop and determine all standards to perform inspection and test on all procedures and oversee all testing methods and maintain high standards of quality for all process.
Review quality of all materials at site and ensure compliance to all project specifications and quality and collaborate with department for all material procurement and maintain quality of materials.
Supervise effective implementation of all test and inspection schedule and ensure adherence to all procedures and coordinate with various teams to perform quality audits on process.
Assist with employees to ensure knowledge of all standards and ensure compliance to all quality manual and procedures and collaborate with contractors and suppliers to maintain quality of all system.
Manage lifting of all equipment’s handle efficient storage of all hazardous materials and performs quality audits as per required schedule.
Analyze all products and nonconformance process and evaluate all documents to ensure maintenance of optimal quality and prepare monthly reports to evaluate performance.
Monitor an efficient system and record for all project activities and analyze all process to ensure all work according to quality requirements.
Review IFC, P&ID,ISO’s & vessel drawings to ensure appropriate WPS are referenced with weld details and overall accuracy.
Ensure Piping and Mechanical ITP stages are followed and complied.
Manage all work methods and maintain knowledge on all quality assurance standards and monitor continuous application for all quality assurance processes and recommend corrective actions for all processes.
QA/QC ENGINEER
QA/QC PAINTING & INSULATION LEAD (Polyurethane-Cold Tank) Samsung Tank Engineering, Phils; Inc. (STE., Phils. Inc.) JGSummit Naptha Cracker Project
Client: DEALIM, Phils.,
Simlong, Batangas
May 22, 2012 up to April 3, 2014
ATM TANKS (CONE ROOF TANK)
D-407 ( Flux Oil Storage Tank )
5.5 M (ID) x 6.5 M (H)
D-516( Wash Oil Storage Tank )
8.3 M (ID) x 7.6 M (H)
D-3031( Pyrolysis Fuel Oil Storage Tank )
9.0 M (ID) x 7.4 M (H)
D-3051( Fresh Caustic Dilution Storage Tank )
5.85 M (ID) x 7.4 M (H)
D-3052 ( 20WT% Caustic Storage Tank )
2.95 M (ID) x 4.9 M (H)
D-3151 ( Demineralised Water Storage Tank )
16 M (ID) x 14.62 M (H)
D-3141 ( Desalinated Water Storage Tank )
20 M (ID) x 17.06 M (H)
D-3021 ( Raw Pyrolysis Gasoline Storage Tank )
26.16 M (ID) x 19.75 M (H)
D-3022 ( Pyrolysis Gasoline Storage Tank )
( Aluminum internal floating roof)
32 M (ID) x 19.75 M (H)
D-407 ( Flux Oil Storage Tank )
5.5 M (ID) x 6.5 M (H)
SHERICAL TANKS
C-3011 ( Ethylene Off Spec. Storage Tank )
( Ployurethane Spray Insulation)
22 M (ID); thickness 73 mm
C-3012 ( C3/ LPG Storage Tank )
( Ployurethane Spray Insulation)
8.4 M (ID); thickness 56 mm
MOTHER TANKS
D-3001 A / B / C
( 3 Units Single Deck Floating Roof Tank )
( FRN Storage Tank )
55.12 M (ID) x 19.6 M (H)
Responsibilities:
Direct audit activities commensurate to production schedules.
Establish priorities and ensure maximum usage of assigned resources.
Develop monthly reports showing inspection and audit performance and improvement opportunities.
Evaluate and recommend alternative auditing procedures for continuous improvement.
Support production leads and operators for interpretation and method following set standards.
Maintain working production component’s knowledge and associates next tier applications.
Conduct meetings regularly with inspection and audit team to help consistency in teamwork.
Monitoring and administering the QA/QC Plan or Programme and ensuring incorporated materials on construction projects are in compliance with the plans and specifications.
Assuring that the work is performed as required by the contract and meets and exceeds the required qualities.
Assuring the acceptable quality of materials, process, and workmanship in the project work.
Assisting Quality Assurance and Quality Control Engineer such as steel reinforcement checking same as in construction drawing.
Issue materials receiving report for the delivered materials.
Review IFC, P&ID, ISO’s & vessel drawings to ensure appropriate WPS are referenced with weld details and overall accuracy.
Ensure Piping and Mechanical ITP stages are followed and complied.
Responsible in direct monitoring, inspection of all site works in structural.
Responsible for conducting visual and dimensional inspection on all activities from layout and cutting, forming, fit-up, full welding and generates the corresponding inspection reports.
Coordinates fabricated items/materials requiring NDT and witness if required.
Coordinates with Client Representative regarding with quality matters.
Following up the concreting works in a presence of the Engineer or Consultant, slump test and cubes preparation for the compressive test (civil works).
Maintain standards of Safety and comply with Company Health, Safety and Environment Management System requirements.
Follow and maintain Company standards of Quality in accordance with Company Quality System requirements.
QC ENGINEER
ExxonMobil
EEI Corporation
Heavy Fabrication
EEI – SWAI, SPT Olefins Recovery Project
Sta. Maria, Bauan, Batangas
March 5,2010 up to Jan.15,2011
QC Representative
Jurong Island, Singapore
Piping Tie-in Inspection including NDT monitoring
Responsibilities:
Monitoring and administering the QA/QC Plan or Programme and ensuring incorporated materials on construction projects are in compliance with the plans and specifications.
Assuring that the work is performed as required by the contract and meets and exceeds the required qualities.
Assuring the acceptable quality of materials, process, and workmanship in the project work.
Assisting Quality Assurance and Quality Control Engineer such as steel reinforcement checking same as in construction drawing.
Issue materials receiving report for the delivered materials.
Responsible in direct monitoring, inspection of all site works in structural.
Responsible for conducting visual and dimensional inspection on all activities from layout and cutting, forming, fit-up, full welding and generates the corresponding inspection reports.
Coordinates fabricated items/materials requiring NDT and witness if required.
Coordinates with Client Representative regarding with quality matters.
Review IFC, P&ID,ISO’s & vessel drawings to ensure appropriate WPS are referenced with weld details and overall accuracy.
Ensure Piping and Mechanical ITP stages are followed and complied.
Following up the concreting works in a presence of the Engineer or Consultant, slump test and cubes preparation for the compressive test (civil works).
Maintain standards of Safety and comply with Company Health, Safety and Environment Management System requirements.
Follow and maintain Company standards of Quality in accordance with Company Quality System requirements.
QC ENGINEER
SHI-ASIA COMPANY LTD.
SCG-DOW HPPO PROJECT
MAPTHTAPUT, RAYONG, THAILAND
September 2008 up to January 2010
Project Involved:
Construction of 15 units stainless cone roof tanks of different sizes (10m to 20 m Ø) for chemical storage. Construction of 2 units 16m Ø LPG sphere tanks and miscellaneous ATM storage tanks (10m to 30 m Ø). Responsibilities:
Monitoring and administering the QA/QC Plan or Programme and ensuring incorporated materials on construction projects are in compliance with the plans and specifications.
Assuring that the work is performed as required by the contract and meets and exceeds the required qualities.
Assuring the acceptable quality of materials, process, and workmanship in the project work.
Assisting Quality Assurance and Quality Control Engineer such as steel reinforcement checking same as in construction drawing.
Issue materials receiving report for the delivered materials.
Review IFC, P&ID, ISO’s & vessel drawings to ensure appropriate WPS are referenced with weld details and overall accuracy.
Ensure Piping and Mechanical ITP stages are followed and complied.
Responsible in direct monitoring, inspection of all site works in structural.
Responsible for conducting visual and dimensional inspection on all activities from layout and cutting, forming, fit-up, full welding and generates the corresponding inspection reports.
Coordinates fabricated items/materials requiring NDT and witness if required.
Coordinates with Client Representative regarding with quality matters.
Following up the concreting works in a presence of the Engineer or Consultant, slump test and cubes preparation for the compressive test (civil works).
Maintain standards of Safety and comply with Company Health, Safety and Environment Management System requirements.
Follow and maintain Company standards of Quality in accordance with Company Quality System requirements.
NDT LEVEL I/Assistant (RT, UT) QA/QCDEPT
NDT LEVEL II (MT/PT Level II)-QA/QC DEPT
Welders Testing Laboratories Philippines Inc.
Sunvar Plaza, Pasay Road Corner Amorsolo St. Makati City May 18, 2008 up to August.15, 2008
Responsibilities:
Assist Level II technician at all inspection (RT, UT, LPT, MPT)-when I was NDT Assistant.
Responsible to assist NDT Level II in all inspection.
Responsible to conduct Magnetic Particle Test (MPT) and Liquid Penetrant Test (LPT).
Responsible in performing required test and interpreting the results.
Responsible in evaluating the results to determine acceptability.
Responsible in verifying results and organize initial and final reports.
SR.QA/QC ENGINEER
TOYO KANETSU K.K./ TPC
TECHNIP CONSORTIUM
DUNG QUAT REFINERY PROJECT
DUNG QUAT, QUANG NGAI, VIETNAM
October 2006 up to May 2008
Project Involved:
Construction of 6 units 23m Ø Butane and Propane sphere tanks,
4 units 70m Ø ATM single deck condensate floating roof storage tanks and
Miscellaneous ATM cone roof storage tanks (25m to 42m Ø). Responsibilities:
Monitoring and administering the QA/QC Plan or Programme and ensuring incorporated materials on construction projects are in compliance with the plans and specifications.
Assuring that the work is performed as required by the contract and meets and exceeds the required qualities.
Assuring the acceptable quality of materials, process, and workmanship in the project work.
Assisting Quality Assurance and Quality Control Engineer such as steel reinforcement checking same as in construction drawing.
Issue materials receiving report for the delivered materials.
Responsible in direct monitoring, inspection of all site works in structural.
Responsible for conducting visual and dimensional inspection on all activities from layout and cutting, forming, fit-up, full welding and generates the corresponding inspection reports.
Review IFC, P&ID, ISO’s & vessel drawings to ensure appropriate WPS are referenced with weld details and overall accuracy.
Ensure Piping and Mechanical ITP stages are followed and complied.
Coordinates fabricated items/materials requiring NDT and witness if required.
Coordinates with Client Representative regarding with quality matters.
Following up the concreting works in a presence of the Engineer or Consultant, slump test and cubes preparation for the compressive test (civil works).
Maintain standards of Safety and comply with Company Health, Safety and Environment Management System requirements.
Follow and maintain Company standards of Quality in accordance with Company Quality System requirements.
TANK FIELD ENGINEER
SAMSUNG (M) SDN. BHD.
KR-2 AROMATICS PROJECT
KERTEH, KEMAMAN, TERENGGANU MALAYSIA
April 2005 up to August 2006
Project Involved:
Construction of 3-units 75m Ø ATM double deck Condensate floating roof storage tanks,
Miscellaneous ATM cone roof storage tanks (10m to 40mØ) including tanks with aluminum internal floating roof. Responsibilities:
Managing field operations.
Overseeing repairs and maintenance.
Generating reports
Troubleshooting and testing equipments
Modifying designs
Ensuring durability
Improving efficiency and safety.
Offering technical supports.
Conducting site inspections.
JUNIOR QC ENGINEER (Structural)
EEI Corporation
Heavy Fabrication
Sta. Maria, Bauan, Batangas
May 2004 up to March 2005
Project Involved:
Goro Nickel Modularization
Project for New Caledonia / J# 1548
Client: GCT ( Goro Construction Team-Foster Wheeler) Responsibilities:
Responsible in direct monitoring, inspection of all sites works in structural.
Responsible for conducting visual and dimensional inspection on all activities from layout and cutting, forming, fit- up, full welding and painting/finishing and generates the corresponding inspection reports.
Coordinates fabricated items/materials requiring NDT and witness if required.
Coordinates with Client Representative