RESUME
NAME: A. JOHNSON Permanent Address:
Mobile No: +91-878******* / 950-***-**** 4/3, Palli Vasel Street, Maduram lane,
Email Id: admwtc@r.postjobfree.com M.K. Kottai, Tiruchirappalli – 620011.
Alter: admwtc@r.postjobfree.com Tamilnadu state.
Passport No.M2562822
Skype Id: - johnsonqc1
Present Address:
Ghorpadi, Pune, Maharashtra.
OBJECTIVE:
To dedicate myself being part of team to produce targeted output within stipulated timeframe in adherence with quality norms by using my skills and to raise my competency level.
Personal Profile:
Date of Birth
13-June-1989
Sex
Male
Nationality
Indian
Marital Status
Married
Languages Known
English, Hindi and Tamil
Computer Skills
MS Office, AutoCAD
Preferred Locations
Chennai, Bangalore and Andra Pradesh.
QUALIFICATION:
10th from sacred Heart higher secondary school with 88% and year of passing 2004.
12th from sacred Heart higher secondary school with 67% and year of passing 2006.
Diploma civil Engg. From GPT with 92% and year of passing 2009.
Graduate in Construction Project management in NICMAR (SODE), Pune with 66% and Year
of passing 2013.
Skills Summary
Preparation of ITP, QAP, work method statements for all activities & all checklists.
Motivate the Site Quality team and site team to maintain good Quality culture.
Preparation of Design mix as per IS 10262:2019 up to the higher grade M60.
NDT tests, Concrete core test and Load test of Precast Member.
Experience in Precast and Post tensioning projects.
Conduct Quality pep talk to site team and analysis the result.
Preparation of site Inspection reports (Preparation and closing out NCR, Root cause, corrective action and
Preventive action.
Interested in calibration of Batching plant, CTM Machine, Lab Equipment’s etc.
Expert in all materials detail testing like cement, Aggregates, 7 ply wire testing Admixture, soil, Bitumen,
Teak wood, Plywood, Marble, Tiles, etc. as per IS standard.
Quality monitoring in residential buildings finishing activities i.e., External plastering work, tiling work,
Door frame fixing work, door shutter fixing work, Aluminum window fixing work Painting work etc.
Residential flats handing over done to customer care team after successful de snagging.
Quality Assurance and Quality control as per ITP and Method statement for MEP activities (Fire Fighting, Plumbing, Electrical and HVAC)
Quality Assurance and Quality control for PEB works.
Total Experience: 11.11 Years in Civil, PEB & MEP (QA/QC and Site).
Additional interested areas:
Resolve the design issues by coordinate with consultant and contractor.
Executive site activities as per drawing.
Also interested in Quantity surveying.
4. Organization: Cushman & Wakefield India Pvt. Ltd.
Project: Nephronia Commercial Development Project Phase 1 & 2, Kalyani Nagar, Pune.
Commercial Project: Total 13 lac sq. ft area.
Working as an Assistant Manager – Engineering Services (Civil, PEB and MEP – Both QA/QC and Site)
Work Period: 11.10.2019 to till date.
Job Responsibilities:
Preparation of Project QAP, all work method statements & all material, activity checklists.
Conduct trail mix at various RMC plants i.e Ultratech, ACC, RDC, Arelcon and Godrej & Boyce for finalize the Design mixes.
Formwork, Reinforcement steel, during concrete and Post concrete checking of concrete.
Streamline the Quality documentation work in all stages of process.
Step wise checking of Post tensioning activities (i.e., Slab PT testing, tendon installation, stressing and grouting)
Raise NCN against Non-conformance activities for corrective and preventive action.
Quality Assurance and Quality Control for MEP activities (Electrical, Plumbing, Fire Fighting and HVAC works)
PROJECT HIGHLIGHTS:
Temperature controlled concrete poured at U.G.W.T and Lift core Raft area –Quantity around 3500cu.m completed in
48 hours.
Mass concreting work done for Raft – Quantity around 3000 cu.m.
PVC formwork, Mivan shuttering used for Retaining wall and columns.
Table formwork finalized for PT slab.
Membrane waterproofing system used for Raft, Retaining wall areas.
Post tensioning activities checks.
Project: Godrej Prana residential project, Phase 1, Undri, Pune.
Residential project: Total 7 towers each tower having P2+14 floors (total nos. of flats 667)
Worked as an Assistant Manager QA/QC (Project Management Services)
Work Period: 05.10.2016 to 10.10.2019.
Job Responsibilities:
Preparation of Project QAP, all work method statements & all material and activity checklists.
To conduct daily meeting with quality team and explain the responsibilities.
Detail’s material quality checks i.e., tile, door frame, gypsum, Block adhesive etc.
Quality Monitoring of finishing activities and flats handing over to customer care team.
Conduct mock up for construction materials as per project quality requirements.
3. Organization: Knight Frank Property Services Pvt. Ltd.
Project: Mercedes Benz India Limited, ware houses and car parking Chakan, G+6
Precast Project, Total Area: 1500000 SQ. ft. (Conventional system + Precast Double Tee slab and
Inverted Tee beam, precast parapets + Structural steel works)
Worked as an Assistant Manager QA/QC (Project Management Services)
Work Period: 04.05.2015 to 01.10.2016
Job Responsibilities:
Preparation of Project QAP, all work method statements & all material and activity checklists.
Prepare design mix M60 high performance concrete for precast work with PC based admixture as per IS method.
Check precast activities i.e., Mould check, reinforcement check, prestressing activity along with calculations, concrete check, destressing activity, and post check.
Check erection activity of precast elements along with site team within specified tolerance limits, bearing etc.
Check structural steel welding process i.e., visual check and DPT, Radiographic tests along with specification by SMAW, GMAW & SAW method.
Check structural steel painting by DFT meter and erection as per methodology.
2. Organization: Aamby valley city group of Sahara India Pariwar
Project: Development of 10,000-acre city.
Celebration Apartments, ISA School, Hospitality projects like Namak restaurant, Night club west lake villas under construction, North lake flexible pavement roads, small Bridges under construction.
Worked as a QA / QC Executive Engineer.
Work period: From 23.01.2012 to 30.04.2015
Job Responsibilities:
Preparation of all method of statements and work procedure as per requirement of the project.
Control batching plant production of concrete as per project needs.
Worked in NABL Laboratory and all materials testing done as per the SOP.
1. Organization: M/S Consolidated construction consortium Ltd.
Project: Finolex J power system, Shirwal – Experience of high-rise Building (Construction of VCV tower upto 120m (Vertical Continuous Vulcanization), Main Plant (VDF Flooring), Shied room (R.C.C wall constructed upto 25m height) – Project area Total 8000 square meter.
Project: Emerson Network power system, Ambarnath – Construction of R.C.C slab upto 1500 square meter Main Plant (VDF Flooring), Office building – Project area Total 7000 square meter.
Worked as a Junior QA/QC Engineer
Work period: From 25.05.2009 to 22.01.2012.
Job Responsibilities:
Specialize in pumping concrete upto vertically 120m & horizontally 100m.
Specialize in Doka shuttering system for check verticality and finishing of concrete surfaces.
To calculate rework and maintain records.
Notice Period: 30 days.
Declaration: I hereby declare that the above information furnished is true to the best of my knowledge and I shall produce all necessary documents at the time of interview.
Yours Truly,
A. JOHNSON