Resume

Sign in

Engineer Technician

Location:
Quezon City, Philippines
Posted:
February 24, 2020

Contact this candidate

Resume:

EDWIN W. LAPID

** *********, *****,

Bataan, Philippines 2110

adbyea@r.postjobfree.com

+974********

OBJECTIVE

To obtain an Instrument Technician position where I can contribute the best of my skills and efforts for the growth of the organization.

EDUCATION

College : BACHELOR OF SCIENCE IN INDUSTRIAL TECHNOLOGY

Major in Electronics Technology

Bataan Peninsula State University

Balanga City, Bataan, Philippines

2003 – 2007

SKILLS

Loop checking and commissioning of Process Transmitter.

Termination of low voltage switch gear, UPS, ATS and battery bank

Panel installation and termination

Insulation Resistance testing

Operation knowledge of digital and analog equipment.

Loop checking, simulating 4 - 20 ma,

Ability to follow complicated written and verbal instructions

Cable Gland application ( single to multi-pair cable)

Tubing and cable tray installation

Comprehend Electrical plan and P&ID

Ability to perform required calibrations to equipment.

Installation of process instrument

Computer Literate

WORK EXPERIENCES

Tozzi Qatar W.L.L.

Position: Instrument Technician

Project: Lusail Light Railway Transit System Project (LRT)

Client: QDVC P.Q.S.C.

(Qatari Diar & Vinci Construction – Private Qatari Shareholding Company)

Contractor: THALES

Size: New Tramway Consisting of 4 Lines, covering 32 km, and serving 32 stations

Date: March 2017 – Till Date

Installation and termination of equipment/panel such as UPS Panel, DCS panels, CCS cabinet, PAS cabinet, Tetra cabinet and related Devices.

Installation and termination of Communication Control System (CCS) that consist of ACS-IDS, TELEPHONE, CCTV, PIS, TETRA, COMTV and PAS.

Installation, and Termination of Fire Detection and Alarm System (FDS) that consist of Local Fire Alarm Panel, Mimic Panel, Smoke Detector, Heat Detector, Remote Indicator.

Installation of conduit and Cable tray.

Tozzi Qatar W.L.L.

Position: Instrument Technician

Project: UHP Independent Water and Power Producer

Client: Umm Al Houl Power

Contractor: Acciona Agua / Hitachi Zosen

Capacity: Power - 2,520 Megawatts / Water - 136.5 million gallon Drinking Water

Date: November 2016 - March 2017

Installation and Commissioning of equipment/panel such as UPS Panel, DCS panels and related Devices. Cable laying of Control, Fiber Optic and other communication cable that includes termination works.

Termination and installation of fieldbus Junction box.

Installation of all process transmitters in Reverse Osmosis building, chemical building. DAF bldg.

Installation and Termination of Pneumatic Panel.

Tozzi Qatar W.L.L.

Position: Instrument Technician

Project: RAF A3 Seawater Reverse Osmosis Project

Client: Qatar Electric Water Company / Acciona Agua

Date: January 2016 – November 2016

Bench calibration of process variable.

Loop checking

Termination of marshalling cabinet and JB side

Tubing and cable tray installation

Tozzi Qatar W.L.L.

Position: Instrument Technician

Project: Polysilicon Manufacturing Plant

Client: Qatar Solar Technology (QsTec)

Date: June 2015 – January 2016

Tubing and cable tray installation

Panel installation and termination

Termination and installation of fieldbus Junction box.

KUMYANG ELECTRIC CO.LTD

Position: Instrument Technician

Project: Refinery Master Plan Phase 2 "RMP2''

Client: Petron

Date: January 2014 - September 2014

Termination and installation of fieldbus Junction box.

Bench calibration of process transmitter.

Termination of marshalling cabinet

Installation and termination of process transmitter.

Rotary Arabia Co. Ltd / Petrol Steel ltd.

Position: Electrical and Instrument technician

Project: Saudi Aramco Total Refinery Project (SATORP)

Client: SATORP

Date: November 2011 – December 2013

Termination of low voltage switchgear, MCC, SSG, UPS, ATS and Marshalling cabinet.

Tubing and cable tray installation.

Installation and termination of radar type level transmitter, pressure transmitter, and temperature transmitter.

IMCO Engineering & Construction Company W.L.L.

Position: Electrical and Instrument Technician

Project: Fahahil Stripping Plant, Dukhan Qatar (Shutdown)

Client: Qatar Petroleum

Date: August 2010 - October 2010

Shutdown of gas turbine ‘John brown frame 5.

Replacing Fault cable, additional PT, LT. and temperature transmitter

Tubing and cable tray installation

Termination and installation of thermocouple

IMCO Engineering & Construction Company W.L.L.

Position: Electrical and Instrument Technician

Project: LNG 1 & LNG2 (shutdown)

Client: Qatar Petroleum

Date: April 2010 - August 2010

Installation of process transmitter

Tubing and cable tray installation

Junction box installation and termination.

Installation, termination and commissioning of additional Fire and Gas such as Gas detector toxic (GDT) and Gas Detector Flammable (GDF)

IMCO Engineering & Construction Company W.L.L.

Position: Electrical and Instrument Technician

Project: Wellhead Treatment Plant (WHTP) Dukhan Gas Field

Upgrading to SCADA System

Client: Qatar Petroleum

Date: Oct 2009 – April - 2010

Cable Gland application (single to multi-pair cable) Wire Termination

Tubing and cable tray installation

Installation of Additional process transmitter

Installation, termination and commissioning of additional Fire and Gas such as Gas detector toxic (GDT) and Gas Detector Flammable (GDF)

Junction box installation and termination.

Tubing and cable tray installation.

PTL Power Corporation

Position: Electrician

Project: Hanjin Dry docks, Subic, Zambales, Philippines

Client: Hanjin Heavy Industries and Construction

Date: September 2007 – May 2009

Installation of switchgear panel, battery bank

Installation and termination of all electrical Device

TRAININGS AND SEMINARS ATTENDED

Temporary Operations Inducted

QDVC /ALSTOM LRT PROJECT

JULY 16, 2018

H2S/ BA Awareness

Venture Gulf Training Center, Doha, Qatar

September 3, 2010

Awareness to Hydrogen Sulfide

Qatar Petroleum, Dukhan, Qatar

October 10, 2009

PERSONAL DATA

Birth Date : July 21, 1986

Age : 33 years old

Sex : Male

Height : 5'7"

Weight : 173 lbs.

Citizenship : Filipino

CHARACTER REFERENCES

Engr. Bernard Alcala Sr.

Project Engineer of Tozzi Qatar

Email: adbyea@r.postjobfree.com, adbyea@r.postjobfree.com

Engr. Menandro Bagsic Project Engineer of Rotary (Arabia) Engineer Ltd.

& Petrol Steel Company Ltd.

Engr. Victorino Serrano Project Manager of PTL Power Corporation

I hereby certify that all the above information is true and correct.

EDWIN W. LAPID

Applicant’s Signature



Contact this candidate