Mukhtar Muhammad Jadoon

(DIRECTOR QA/QC (Corporate) PMO Member

Page 1 of 8

+971-**-***-****/ +971-*********

ad3vsy@r.postjobfree.com

https://www.linkedin.com/in/engr-mukhtar-jadoon-9a22462b Visa Status: Valid Employment Visa, Driving License: U.A.E.

(Certified by PMP, (Basic) NRMCA & ISO: 9001:2015 as a Lead Auditor by (IRCA-QMS) Accredited & Certified Civil Engineer by Dubai Municipality Govt. Of Dubai UAE Accredited, Certified, Facilitator of Green Code and Blue Code and Acknowledge by Civil Engineering Dept. (CED)

Accredited by Dubai Universal Design Code White Color TRAKHEES CED, Dept. of Planning & Development Civil Engineering Ports, Customs & Free Zone Corporation, Green Code Construction Materials Quality Control & Structural Inspection Guidelines Orange Color: Fresh concrete procedures

TRAKHEES, Govt. of Dubai, U.A.E.

00-971-**-******* What’s App/Contact Number

ad3vsy@r.postjobfree.com

EXCUTIVE SUMMARY 个人的专业工作年限 历任职位 所涵盖的领域 个人的重要的成就 突出的强项 Purpose:

This, document is to define Quality Assurance/ Quality Control Section Organizational structure, procedure, processes and resources need to measures the effectiveness of services for China National Chemical Engineering Construction L.L.C. as per ISO: 9001:2015 Quality management System (QMS). Moreover, to develop and maintain an organizational system which provides quality assurance and audit through every area of the section while optimizing the process of production These processes benefit the organization community and lead to QA/QC satisfaction Scope:

This, document describes the QA/QC procedures and scope of work that are in the line with M/s: PIC objectives of maintaining high standard quality for private and Governmental Organization, Ministry of interior, Ministry of Justice & Peace Projects in accordance with Local regulations, Abu Dhabi municipality, ESTIDAMA, Ministry of Interior Civil defense, Dubai Municipality, CED- TRAKHEES, Local Authorities and International standards

STRENGTH / SKILLS 在专业领域所掌握的知识以及技能

Supervising and monitoring the implementation of Quality Policies, procedures, Programs and Systems. Before any commencement of projects, he shall arrange and induction and orientation for the Project team regarding all pertinent documents and processes specifically for each department to ensure alignment. Carrying out induction of all site personnel including subcontractors and conducting site toolbox talks on specific topics about the PMM or Quality Plans/Method Statements. Enforcing the QA system on all subcontractors thru Kick-off meeting and Sub-con coordination meetings. Conducting regular external and internal audits of all stakeholders. Documenting each conducted audit and ensuring that the corrective and preventive actions are implement and is effective in addressing the Auditors findings or observations. Leading the quality team on site and coordinating quality matters with the Client’s team. Implementing quality control procedures manual processes for conducting day-to-day operations, tests and inspections of products, services or processes. Evaluating quality control and performance as per client specifications.

Mukhtar Muhammad Jadoon

(DIRECTOR QA/QC (Corporate) PMO Member

Page 2 of 8

RESPONSIBILITIES 工作职责

JOB DESCRIPTION & RESPONSIBILITIES AS

AUTHORITY- CED- TRAKHEES, PORTS CUSTOMS &

FREE ZONE CORPORATION Dept. of Planning & Development Govt. of Dubai, U.A.E a. Regulations. Also accredited as Green code Guidelines for materials construction as Preliminary role to ensure that the site project work is constructed & controlled in accordance with the Contract Documents, Specifications, Cost Budget, Delivery Targets & Quality Standards set by Client Requirement.

b. Being as a Quality control senior Engineer well aware of registration processes of Ready Mixed Concrete Plants supplying concrete to different mega projects, management & ensure the implementation of Approved Clause – 14 programs which is approved by the Client & Project Management team. Prepare a monthly or weekly report in coordination with the Planning Engineers & submit to the Project Manager. c. Being as Senior Quality Assurance/ Quality Control Engineer also certified for site laboratories Certification of concrete field-testing technicians and Certification of Ready mixed concrete Suppliers to implement for site activities Witnesses, the concrete trial mixes for the approval of the Design mix concrete & ensuring its full compliance with the Project Specifications &Authority Requirement. d. Reviewing & analyze the variation orders as per actual Contract Design Drawing / revised Design Drawings

& provide the necessary fee back for final cost impact on the project. e. Value Engineering– Study the cost saving factor to its depth, raise the matter via letter & forward the Cost Saving to the Client officially.

f. Having good experience of fast-track high-rise tower projects by providing a comprehensive service to the Company & to the Client.

g. Implement QA / QC procedures & Inspection Test Plan as per the approved materials, track their testing frequencies, check all the cube results, durability parameters & check the approved material test results as per technical data sheet & their related parameters. h. Perform random checks to site with the field team to ensure the works are in accordance with the Project Specification, General Notes, Design Contract / Authorities Approved Drawings. i. Attending the Project Progress, Coordination meetings & organize Sub-contractor’s meetings to close out the site issues on daily or weekly basis.

j. Organize weekly internal meeting between the site staff to discuss the routine site works & find solution for the critical activities & their related site works accordingly. k. Reviewing & comment the shop drawings in close coordination with the Project Architect, MEP department

& instruct the contractor to generate extra details as and when required as per the site conditions l. Review the sub contractors’ pre-qualifications based on approved vender list or from out of the list for all the Structural & Architectural materials.

m. Thoroughly check all the details of Structural & Architectural drawings in order to resolve all the discrepancies between Tender / Contract / Good for Construction / Authorities Approved drawings. n. Generating a Non -Conformance Notice & to make contractor work in compliance with the Specifications, General Notes & Approved Drawings.

o. Prime Cost items-generate enquiries, collect the rate from minimum three different suppliers, compare / complete the rate analysis & acknowledge the final proposal. Arrange weekly meetings with Project Manager, Chief Architect & Client to seek their final approval for all the materials. p. Perform random safety checks with the site team to check site safety practice as per DM / JAFZA / EHS Authorities rules & regulations.

q. Committed to work with multi discipline team with strong knowledge of construction methods in the region. Work parallel & follow up with the Project Manager’s expectations. Proactive in problem solving, ambitious & leadership skills with decision making approach towards the benefit of the project. PROFESSIONAL CAREER 历任工作过的项目或者公司 时间 以及所担任的岗位, 以及工作地点 More than (27) Years Robust, extensive highly professional experiences in Infrastructures Affairs, Asset Affairs, Building Affairs, Technical Affairs, Quality Assurance/Quality Control management system Like, The Palm Jumeirah 8th Wonder of the World first class infrastructures Bridges, Roads, Tunnel in Offshore for Utilities, District Cooling System, Storm Water, Drainage, Septic Tanks and specialist in Job Mix Formula for Mukhtar Muhammad Jadoon

(DIRECTOR QA/QC (Corporate) PMO Member

Page 3 of 8

Asphaltic Base Course and wearing Course for in VILLAS, TOWN HOUSES JUMEIRAH PARK VILLAS, JUMEIRAH SOUTH VILLAS, JAFZA SOUTH NAKHEEL Projects, vast Professional Experience as SENIOR QA/QC, MANAGER: Being as a Senior QA/QC-Manager Vast experience of for EIGHT WONDER OF THE WORLD THE PALM ISLAND JUMEIRAH CRESCENT DUBAI, Mega Infra Structures Roads, Bridges, Jumeirah Park Villas Package 1 to 7 Chilled water Pipes & D. Cooling system, MONO RAILS at The Palm Island Jumeirah, Motorways, High Ways, Culverts, Under passes Rip rap stone Patching & high rise towers, Buildings and Villas, Town Ships. All kinds of infrastructure work, execution in construction & site management experience in High Class Infrastructures Project, Dubai U.A.E Well aware of International standards, Local Regulation and projects specification. Practical Experience of conducting Testing of all Construction materials, like Architecture, MEP, Civil work is being using in Construction industries for Infra structures Project, Sub- station, Mega Malls, Atlantis Dubai, Palm Island Jumeirah and witnessed as Specialist of QA/QC

– Manager from Authority Govt. of Dubai.

Air Ports Projects Terminal 03 Dubai, International Airport, Prepared PQP, Method statements & ITP’s for Mega Projects Air ports etc.

Earthwork, Utilities, Job Mix for asphaltic works. Conducted all testing for Materials In order to ensure a standard Quality of Materials to be-used for construction activities. M/s: Parkway International Group LLC and Parkway Group of Companies, Contracting, Joinery, Aluminum and Glass Glazing façade works, Marbles & Metal. Projects: Control PIC Group, All Projects Construction execution being as a Director QA/QC Corporate total 45 numbers QA/QC Staff’s including 04 QA/QC Manager’s, Senior QA/QC Engineer’s and Documents Controller’s attending Weekly QA/QC performance meeting, Inspection Request’s Log’s, KPI, Evaluate QA/QC performance and Implemented PQP, Standard QA//QC Procedures with in accordance to Client’s project contract specification requirement, NCR’s and SOR’s, Conducting Internal Audit in order to assure best QC standard procedures at sites to avoid any deviation/non-conformity for sake of projects and handover project with good environment strict follow up Snagging and De-Snagging and close out procedures. Duty-resum:07-03-2023-to-till-date.

M/s: China National Chemical Engineering Construction L.L.C Project: MAG City Buildings, Town Houses and Infrastructures Road Works in Meydan District Seven 7 Dubai

Client: MAG

Consultant: VX Studio

Cost: One Billion US Dollars

MAG City Phase-01, Phase, 02 and Phase-03 Total G+8 (32) Buildings, 446 Town Houses, Villas Road and Infrastructure for Phase-01, 02 and 03 phases.

Road Works, Drainage, Storm Water, Sewerage System, Irrigations etc.

14-03-2020 to 06-03-2023

M/S: ALI MOUSA AND SONS HOLDING GROUPS-U.AE,

PROJECT: All Projects, CHERRY WOODS TOWN HOUSES 378 and Infrastructure works

CLIENT: MERAAS

SHAIKH ZAHID HOUSING PROGRAMS SHARJAH 206 VILLAS and Infra structures work 08-12-2018 to 13-03-2020

POSITION: SENIOR QA/QC MANAGER (CORPORATE) PMO Member AMS HOLDING Mukhtar Muhammad Jadoon

(DIRECTOR QA/QC (Corporate) PMO Member

Page 4 of 8

TOTAL: COST PROJECTS 2 BILLION

DHABI CONTRACTING L.L.C DUBAI. U.A.E

Project: High Class Infrastructures Chilled Water Pipes & D. Cooling Systems AL- KHAIL AVENUE MALL & THE HOTEL

Project-Cost:1.5-Billion-Dirhams.

Position: Senior QA/QC Manager

Client: NAKHEEL, JUMEIRAH VILLAGE Dubai

Consultant: DAR- AL- HINDASAH SHARE & PARTNER DUBAI 21st Nov 2016 to T0 08 December 2018:

M/s: GHANTOOT GROUPS DIVISIONS ABU DHABI, U.A.E

12th Sep 2015 to 20th, Nov, 2016

High ways and Bridges Abu Dhabi Municipality Projects AL- JAZEERA High Rise Tower, 3 BASEMENTS+G.F+ M+ 33 Typical Floors Tower Corniche, Abu Dhabi.

Cost: 170 Million Dirhams

Abu Dhabi.

Cost: 243 Million Dirhams

QA/QC Manager: Being as a QA/QC Manager Preparing (PQP) NCR’S, S.O. R’S, NCR’S Closeout procedures, conducting weekly QA/QC Meeting In order to review and discussed the Latest status of Materials Submittals, ITP’S, Method statements, Inspection Request IR, Technical Issues and further to practically implemented of approved PQP, Preparation of All activity standards formats, Witnessing of Trials, mock up, Testing of Materials. Moreover, Conducting Internal Audit, External Audit for Sub- contractors etc. FIVE STAR DESERT RETREAT Infrastructures, Roads, Utilities Bridges for HOTEL & RESORTS - INFRA Structures at

ALWATHBA ABU DHABI, H.H SHEIKH BIN ZAYED E.O.M

Cost: 200 Million Dirhams

Main Hotel, Conference Facility, Prayers Room, Utilities, One, Two, Three Bed rooms Villas, Kids Clubs, Zone 1: ANCILLARY BUILDINGS YOGA PAVILION, DESERT CAMP, SUBSTATION 1 &2 SEWERAGE TREATMENT PLANT, SWIMIMG POOLS, WATER

FEATURES, HARD & SOFT LANDSCAPING & STAFF’S

ACCOMODATION ETC

Worked on SUPREME COUNCIL, INTERNATIONAL SECURITIES PRESENDENTIAL AFFAIRS ABU DHABI In order to Prepare P.Q.P, Method statements & ITP’S.

In order to take CAR/PA for NCR’S etc.

M/s: UNECUNEC- ACTCO/ JV at NAKHEEL Mall the Palm Island Jumeirah Dubai 2Oth, Sep 2014 to 11th Sep, 2015

U.A.E.

Cost: 1.2 Billion Dirhams

Client: NAKHEEL

Consultant: RSP

Being as a Senior Quality Assurance & Quality Control - Manager Preparing of Project Quality plan (PQP), Project Quality Policy Statement, Method statements for particular activities, ITP, Inspection and test plan in accordance to Project specification, ISO- 9001- 2015 and International standards. Approval and Reviewing of materials submittals, Manufacturers Pre- Qualification and their products for use of NAKHEEL MALL. ARABTEC – SAN JOSE, Joint Venture (JV) at AL AIN HOSPITAL & INFRASTRUCTURE PROJECT: Mukhtar Muhammad Jadoon

(DIRECTOR QA/QC (Corporate) PMO Member

Page 5 of 8

U.A.E.

(30th, July, 2013 to 19th Sep, 2014)

Cost: 4.3 Billion Dirhams

POSITION: QA/QC- MANAGER

PROJECTS:

ASTANA ABU DHABI PLAZA KAZAKHSTAN, three towers including five-star Hotel and Infrastructures PROJECT: 5 Billion U.A.E Dirham, (2.5 Billion U.S. Dollar). ALAIN HOSPITAL PROJECT:

Working as Quality control/ Quality Assurance Materials Manager: 4.5 Billion Dirhams 750 beds and Infrastructures works,

Hospitals, Utility center, Tunneling In order to Implemented the QA/QC Plan procedures for Alain Hospital Project Conducting and approving Materials Submission in accordance to Project specification and Quality Auditing is conducting on daily basis in order to Implemented at site Execution activities. In addition, conduction Weekly Progress meeting of Quality control Engineers In order to discuss, SOR, NCRS and how to rectify the Site Observations In order to close the NCRS ON TOP PRIORITY BASIS. Weekly Progress and technical meeting conducting with Client on weekly basis. Further, in order to ensure that all execution work is going with approved Materials. Site Issues Technically supporting Alain Hospital Project& further, Reviewing and approving all Materials Submission, Approval of All Specified Materials, Concrete Mix designs Laboratory trials and Plant trials in accordance to project specification, International Standards and Local Regulations in Order to achieve a standards Quality of Work at Site. CIVIL ENGINEERING DIVISION TRAKHEES, PORTS, CUSTOMS & FREE ZONE CORPORATION, Department of Planning & Development GOVT. OF DUBAI, U.A.E.

(22nd, April, 2006 to 29th, July, 2013)

POSITION: SENIOR QA/QC- ENGINEER

PROJECTS:

Inspected and monitored Jumeirah Park villas Projects, Package 1 to 7 Phases Like, Villas and Town Houses, infra structures, Jumeirah Lake Infra structures for Jumeirah Lake Towers projects for the quality assurance and quality of work in light of Project specifications, International standards and local regulations. Some of these projects are:

Palm Jumeirah Island Dubai World, the Eighth wonder of the World! Crescent, Bridges, Crescent East & West, The Palm Island Jumeirah, Bridges for Trunk & Crown Infrastructures, under sea Tunneling, Chilled water Pipes, D. Cooling System, Irrigation System, Mono Rails Piling etc. (JUMEIRAH LAKE TOWERS) Dubai, Total 79, Seventy-Nine High Rises Commercial & Residential Towers and Infrastructures Roads Works International City, Jumeirah Park

Villas, Water Front project Palm Jabel-e-Ali Palm Deira Dubai, Techno Park, JAFZA SOUTH, and JAFZA NORTH. Jumeirah Village Circle, Jumeirah village south and north, the maritime city Bur Dubai. ASSOCIATED CONSULTING INTERNATIONAL

CONSULTANTS

DUBAI, U.A.E.

(October 2004 to April 2006)

POSITION: Worked as a Senior Quality Control Engineer PROJECT: The Palm Jumeirah Island crescent- Infra structures- Roads, Bridges, District Cooling System, Sewerage System, Irrigation system, Decorative Walls, GRC, Steel bridges on River.

PROJECT COST: 3 Billion Dirham.

Mukhtar Muhammad Jadoon

(DIRECTOR QA/QC (Corporate) PMO Member

Page 6 of 8

M/S: BAUER GMBH, GERMANY PILING CO. DUBAI. UAE

(December 2003 to October 2004)

POSITION: Sr. QA/QC- Engineer

PROJECT: Airport Terminal Three 03 Dubai International Airport Terminal 3 Executed Piles works, Shoring Works etc. Mall of the Emirates Dubai. -Dubai.

Executed piles and testing on piles.

RAKAN TRADING AND CONTRACTING COMPANY K.S.A

(November 2002 to November 2003)

POSITION: Senior Quality Control Engineer

LRA, LOYA, REPUBLIC ENGINEERING AND

ASSOCIATED CONSULTING ENGINEERS PAKISTAN

(January 2002 to Nov 2002)

POSITION: QA/QC-Engineer for Civil Infra Structures and buildings BAYINDER CONSTRUCTION COMPANY TURKEY

PAKISTAN

(January 2000 to December 2002)

POSITION: QA/QC Engineer

PROJECTS: Islamabad Peshawar Motorways, 35 Kilometers Motor Ways Six Lane Bridges, Culverts & Interchange Burhan Pakistan. Sub- grade, Sub- base, Aggregate road Base, Stone Pitching, Slopes, Asphaltic Base Course & Wearing course etc.

M/S: S.T.F.A TURKISH CONTRACTING

COMPANY PAKISTAN

(January, 1998 to December, 2000)

POSITION: Quality Control, Quality Assurance Engineer PROJECTS: Roads, bridges and Infrastructures

M/S: ABID BROTHER CONTRACTORS PVT. LTD.

(January 1996 to December, 1998)

POSITION: QA/ QC, Engineer

PROJECTS: Different structure buildings &High ways EDUCATIONAL BACKGROUND 教育背景, 学校 所学专业 取得何

Designation Qualification Certifications Total Construction Industry Experience

“Sr.QA/QC Manager

(Corporate) Parkway

International Contracting L.L.C

Head of QA/QC Department

PIC Group.

M.SC. Geology Master of Science in

Material Eng. Geology 27 - Years

BSC Civil

Engineering

Bachelor of Civil

Engineering 20 – Years in UAE

Mukhtar Muhammad Jadoon

(DIRECTOR QA/QC (Corporate) PMO Member

Page 7 of 8

Accredited &

Certified as a Lead

Auditor

ISO: 9001:2015 QMS-

As a Lead Auditor

Abroad, 7 Years

Russia, Kazakhstan,

KSA, Pakistan

Certifications:

Credentials Certificates from Govt. of UAE & Private Organizations Course: Quality Project Management- PUS Certification- PMI Course: Certified by ISO: 9001-2015 as a Lead Auditor Quality Management system (QMS) Course: Innovation in Design and Construction

Course: CERTIFICATION PROGRAME FOR FRESH CONCRETE IN THE FIELD" TRAKHEES- PCFC Govt. of Dubai.

Course: Facilitator-training program for materials, quality control systems and Green Code" CED TRAKHEES- PCFC Govt. of Dubai.

Course: International concrete sustainability conference. Course: concrete strengthening techniques & design consideration (SPME). Course: Smart dynamic concreter introduction & demonstration (BASF). Course: Concrete repair and corrosion solutions (FOSROCK) Course: Quality control in the use of post tensioning in building structures (CARES). Course: Concrete Technology Middle East (CTME) NRMCA. Course: Quality Project Management- SE UAE. Certification of excellence customer service for TRAKHEES inspectors, quality Control Department. First PCI international symposium certificate of Participation. Dubai Universal Design Code White Color from Civil Engineering Dept. TRAKHEES CED, Dept. of Planning & Development

EXTRAS CREDENTIALS:

Accredited with Blue code (Buildings regulation & design guidelines code) Accredited as a Green Code (Construction of Materials and Quality Control Guide line) Facilitator as a (GREEN CODE) Head examiner of Fresh concrete field testing technician & supervising engineers Attended & well Experience of

ESTIDAMA Requirements for Buildings Regulation in ABU DHABI, U.A.E. Dubai Universal Design Code White Color from Civil Engineering Dept. TRAKHEES CED, Dept. of Planning & Development Govt. of UAE, Orange Code: Fresh Concrete Sampling from TRAKHEES CED, Dept. of Planning & Development Govt. of Dubai, UAE.

(Certified by PMP, (Basic) NRMCA & ISO: 9001:2015 as a Lead Auditor by (IRCAXQMS) Accredited & Certified Civil Engineer by Dubai Municipality Govt. Of Dubai UAE Accredited, Certified, Facilitator of Green Code and Blue Code and Acknowledge by Civil Engineering Dept. (CED)

Accredited by Dubai Universal Design Code White Color TRAKHEES CD, Dept. of Planning & Development Civil Engineering Ports, Customs & Free Zone Corporation, Green Code Construction Materials Quality Control & Structural Inspection Guidelines Orange Color: Fresh concrete procedures

TRAKHEES, Govt. of Dubai, U.A.E.

00-971-**-*******

ad3vsy@r.postjobfree.com

AFFILIATION & REGISTRATION

a): Registered as Professional Civil Engineer with Pakistan Engineering Council Islamabad, Pakistan b): Registered as Professional Civil Engineer with Society of Engineers UAE C): Registered as Professional Civil Engineer with Saudi Engineering Council KSA. Mukhtar Muhammad Jadoon

(DIRECTOR QA/QC (Corporate) PMO Member

Page 8 of 8

d): Registered as Civil Engineer in Marine Construction with Dubai Municipality Govt. of Dubai, UAE. e): Register as a Civil Engineer in Dry and Wet Utilities with Dubai Municipality Govt. of Dubai, UAE f): Register as a Civil Engineer in Infrastructure Sewerage System, Road, Buildings with Dubai Municipality Govt. of Dubai, UAE.

Computer Skills

M.S. Word, Excel, Autocad-R-14, Primavera, ii & Geographical Information System – G.I.S.



Contact this candidate