Resume

Sign in

Engineer Manager

Location:
Cairo, Cairo Governorate, Egypt
Posted:
May 26, 2019

Contact this candidate

Resume:

Curric ul um V itae

PROJECT MANAGER

PROFESSIONAL

CIVIL ENGINEER

PMP AMERICAN DIPLOMA CERTIFICATE from

AMERICAN ACADEMY

ATLANTA INSTITUDE U.S.A

Personal information :

Name: Mohamed ibrahim ibrahim zeid

Address: 33b el sheikh el bably st,hadayek el kobba, cairo,Egypt mobile: 00201023086014-00201124083143

E mail: ac9gt1@r.postjobfree.com

Nationality: egyption

marital status: married

military service: exempt

Education& certificate s:

- B.Sc. civil engineering

Structural department,2003

Ain Shams University

faculty of engineering

BSc project grade very good

- PMP American higher Diploma from American Academy

- MICROSOFT OFFICE caurse

- SAFETY CERTIFICATE from SBG(Saudi ben ladin group)

-AUTOCAD caurse from faculity of engineering

1 / 7

2/7

Work description :

Implementation and supervision and management of : building structures (concrete or steel or composite) all activities of concrete works

of excavation work

All types of soil replacement

Equipments work

Treatment of concrete

All tests of concrete

All tests of structures

All types of quantity surveyor

All surveying activities

Finishing activities with high specifications like: Building works

Plaster

using plaster accessories

Painting

Artificial stone plaster

Savito

Artificial stone

Marble

Ceramic

Curtin walls

All types of falls ceiling

All types of isolation

Supervision and manage electrical works

Supervision and manage of sanitary works

Maintenance,repairing & strengthing of structures And deal with execution defects

( by using F.R.P-steel shirt-concrete shirt-

steel angle and pattern plate-grouts-

bonding agents-additional RFT-injection-

dry packing-shotcrete-drilling &plugging )

Make site investigation before start project

Determine all stakeholders

Make preparation meetings with stake holders before start the implementation Put the project management plan

Determine all requirements of project

( team work –suppliers – subcontractors –materials-equipments- mobilization

Put control plan

Bending list of steel

Scaffolding works

Tower cranes works

Shop drawing of details

Q.C works

Q.A works

3/7

B.O.Q

Put specifications of :

Excavation –landscape-concrete work-finishing activities All types of materials

Put a plan of project

Put a time schedule

Treatment of Main contractor

Subcontractors

suppliers

Owner

Consultant

Reports preparation

Good leader for team work

Solving of problems by PMP knowledge

Experience at several types of projects as:

Building structures

Universities

Banks

Hotels

Shopping Mall

Sporting structures and stadium

Several purposes halls

Swimming pools

Tunnels

Cairo Air port

Extension of Haram (King Abd Allah extension)

4/7

Work experience:

NAKHIL CITY

(from 2003 to 2005)

it is a new city in cairo consist of

49highconcrete structure tower

one tower consust of 13 floor

from replacement of soil to finishing of structure cost of project 200 million LE.

THESSEN KRUPP XYRVON (PIENGER COMPANY)

(from 2005 to 2008)

It is one of biggest finishing company at middle east I work as executive engineer in finishing of

NEW CAIRO AIRPORT

my company work as a subcontractor of finishing

the main contructor is TURKISH TAV COMPANY

Then I work as manager of area at

NEW AMERICAN UNIVERSITY IN CAIRO

my area consist of 3faculities (3 building)&

building of management

this building is the best important in A.U.C

my company work as a subcontractor of finishing works the main contractor is SAMSUNG,SAMCRETE COMPANY

5/7

KUWAIT

(from 2008 to 2009)

I work as a projects manager in

(several purposes halls-swimming pools-sport stadiums-gymanesium- sawna )

&work as one of final reporters of this projects

It is very large projects

My work in this projects at concrete & finishing works SIAC

(from 2009 to 2012)

I work as a manager of area at the follow projects... MENA HOUSE HOTEL

It is the largest hotel in Egypt it is 5 stars hotel The project consist of

Very large swimmingpool –children swimmingpool-hotel-italian restaurant-oasis restaurant-manager,s villa-tunnel-shopping there are concrete and finishing works ARABIAN BANK

It is a work consist of

Isulation works-marble works-plastering works-painting works-skreed floors-mokett works-wooden floors-curten walls- allumenium cladding-precast cladding- gypsumboard prtitions-glass partitions-falls ceiling-supervised at electromechanical works

It is high level work

6/7

Telal al jazeera project

I prepare to start implementation of this project

And make all this preparation steps

Consist of 42 villa 5 samples

Tasks is

studding of arc and structural drawing and correct errors at designing Planning of this prohject

No. of employers and their tasks

Design of mobilization

Tests at soil

Conferences with our partner

Calculation of quantities of concrete and finishing works Make B.O.Q. BELL OF QUANTITY

Requirement of project

Start project from replacement of soil to finishing MCC

(from2012 to 2014)

It is very large contracting company I work at consultant department at supervision of :

- KUSEER HOTEL.

- HURGHADA CITY.

- ALSHOUROOK UNIVERCITY.

- 6 OCTOBER ACADEMY.

7/7

KINGDOM SAUDI ARABIA

SAUDI BINLADEN GROUP

ABCD

) From2014 to 2017)

Project engineer at the extension of haram project for3year Place of work:

At shamiyya extension

At mataf extension

Nature of work:

At concrete work

At finishing work

At coordination as a project engineer between several departments SAKAN MASR PROJECT

(from 2017to 2018)

Project manager to 17 building structure at sakan masr project and finish project at wonderful time.at ELBAHAA company Skills & abilities :

PMP HIGHER DIPLOMA

Efficient use of MS

Safety certified

Autocad user

Internet user

Good command of documentation &reports preparing

Excellent in English language

Valid driving license



Contact this candidate