|
Resume alert |
Resumes 21 - 30 of 32 |
Andhra Pradesh, 531034, India
... Company activity :Roads & sewerage treatment plants Designation :Quantity surveyor/procurement/ Responsibilities are ... Projects Title : Geospatial Analysis of Multi-source Thematic Data for Supporting Mission Water Conservation Plans in ...
- 2020 Jun 02
Visakhapatnam, Andhra Pradesh, India
... • Sonication in water treatment. • Desalination Pretreatment. • Achieved highest grade in "Highway design and safety" in M.Tech, 2018-19. • AIR of GATE 2018 is 3391 • Rank opener of M. Tech Traffic and Transportation Planning(CE) of NITC, 2018 • ...
- 2020 Mar 14
Visakhapatnam, Andhra Pradesh, India
... Reviewing of heat treatment chart during PWHT and after completing of PWHT. Involved in QC activities of coal bunker, CW piping, sea water piping, lub oil piping, critical piping, boiler tube welding. Surveillance during welding to verify compliance ...
- 2019 Dec 10
Visakhapatnam, Andhra Pradesh, India
... Skilled in Evaporation, Absorption, Reverse Osmosis, Reactor, crystallization, Cooling Tower and Water treatment processes. Handling of all operations, plant startup, shutdowns and by using thermo fluids. Performed Material and Energy Balance ...
- 2019 Nov 15
Visakhapatnam, Andhra Pradesh, India
... ENVIRONMENT: Ensuring of all discharges of “Effluent Treatment Plant & Sewage Treatment Plant, Bio-filtration Plant” will meeting Central & A.P Pollution control Board Norms. (ETP Water, Air emissions & Hazardous Waste storage & disposal, Waste oils ...
- 2019 Mar 12
Visakhapatnam, Andhra Pradesh, India
... I learnt the components of a Modern Steam Power Plant such as Steam Turbine, Water Treatment Plant, Boiler and Condenser, Circulating water pump etc, its operating cycle and the essential requirements of Steam power station design of Steam Power ...
- 2018 Jul 07
Visakhapatnam, AP, India
... Airtel - Mumbai, India Jan 2012 – Nov 2012 Web Developer Xylem is a multinational Water Treatment and Transportation Company headquartered in Gujrat India. The company sells various types of Fluid Handling Pumps /Machines across the Globe. The ...
- 2018 May 22
Visakhapatnam, AP, India
... Circuitry & Wiring as well as Water Management & Treatment System Last associated with Bilfinger Facility Service, Dubai, UAE as BMS/SCADA Operator; skillful in operating & maintaining Building Management System (BMS) for proper function and ...
- 2018 Apr 25
Visakhapatnam, AP, India
... Site Engineer/ Sri Lucky Engineering works (Water Treatment Engineers and Contractors)/Visakhapatnam/ June 2005 to Jan 2008. Scope of work Strengthening and Improvement of Sewerage system, laying sub-mains, laterals and transfer of house connections ...
- 2018 Feb 06
Visakhapatnam, AP, India
... a Sulphur Recovery unit-Clauss process, Tail Gas Treating Unit(TGTU),Amine Regeneration unit, Fuel gas Amine treatment unit. ... to start up and during normal operations (HP/LP Steam, Instrument air.Nitrogen, Demineralized water, Fuel gas) required. ...
- 2017 Oct 10