Michael Lang Kee

**** **** ******* **.

Mesa, AZ 85205

Home Ph: 480-***-****

Email: qyn75b@r.postjobfree.com

February 10, 2012

Job Title: Electrical Engineer Lead – Sr. Project Manager Supervisory

Job Number: N/A

To Experis Engineering,

I am writing in response to an Electrical Engineer Lead – Sr. Project Manager Supervisory with Experis Engineering in Phoenix, AZ. This position will utilize my Field/Project Engineering, Estimating skills as we, Nuclear, Water and Waste Water as enhance my professional and my personal growth. I am confident that my Engineering experience with various Water and Waste Water engineered projects and field engineering at the City of Phoenix 23rd Avenue and 91st Avenue Waste Water Treatment Plants will serve as an asset to your Engineering Department. I also have experience with some of the largest projects and one of a kind projects in the world such as the nuclear River Protection Project/Waste Treatment Plant and Ghazlan II generation project, will serve as an asset to your Engineering department. As well as Nuclear Waste projects at the Savannah River Site in Aiken, South Carolina.

As you will note on my resume, I have previously worked with different Engineering/Construction companies and have experience in engineering, design, estimation, construction, field engineering and project management experiences and with combined work experience in the Medium/Low voltage Electrical Field of Twelve years as well as two years in the electrical trade and two years with welding, pipe fitting and Iron Working.

• I have done engineering work for the Vitrification Plant at Hanford DOE site, located in Richland, WA. I am also working at the Savannah River Site, performing Engineering task on Nuclear Waste.

• I am goal oriented, I emphasize safety and I take pride in producing quality work. I get satisfaction by completing jobs under budget and taking responsibility of projects.

• I have done a field and cost analysis on 24 kV transmission line routing overhead or underground. Performed construction site investigation on 4160 V/480V distributions to Transformers, Switchgears, Motor Control Centers, raceway, conductors. Assisted with preparing formal report and presentation for the City of Phoenix’s Electrical Master plan at their 75 MGD Waste Water Treatment Facility. I have performed formal energy analysis utilizing SKM software.

• I have performed take off on Lighting, raceway (EMT, GRC, Busway, PVC coated GRC and PVC), transformer, panels, circuit scheduling, Conduit fittings, CATV, Fiber Optics, Level 2 & 3 Switches.

• I have been trained in pre-project management, Sigma Six training. I have also designed/engineered 480 VAC, 120 VAC, power distribution, grounding, cable terminations, MCC, UPS/Battery sizing/locating, Power panel engineering design, Assist with 200 $Mil trend for Class 1E circuits, Assisted C&I with raceway routing, design conduit and Cable tray, and used Industrial standards for lighting Calculations (IESNA) and voltage drop, and I have worked on the communication systems (CATV, Fiber Optics, Switches). I have done design preparation and layout of electrical equipment.

• I am proficient with MS Office. I am also experienced in the construction of buildings by working in the following trades: Electrical, Electronics, Carpentry, Structural, and Concrete.

I look forward to meeting with you to further discuss how my qualifications meet the needs of this position. Please contact me at 480-***-****, if you have any questions.

Sincerely,

Michael Kee

Michael Kee

SUMMARY

Electrical Engineer with a combined 12 years of experience in Nuclear, Field/ Project Electrical Engineer, Electrical Engineering, Electrical Designing, Electrical Estimating, Water and Waste Water, conceptual & detail design of power distribution in the following fields. I also have 4 years of construction experience in Electrical, welding and Iron Working:

• Palo Verde Nuclear Generation Station

• Savannah River Site

• River Protection Project - Waste Treatment Plant (RPP/WTP)

• Various Waste Water Treatment plants and Water Pumping Stations

• Ghazlan II, 3200 MWatt Power Plant

• Various Commercial Projects and Operation and Maintenance of facility.

Very strong PC skills in several application software including database and spreadsheet application (Access and Excel), Lighting Calculation programs from Lithonia, Crouse Hinds, 2D & 3D CADD Microstation, AutoCAD and basics of electrical transient analysis software ETAP and SKM.

Supported different Waste Water Treatment Facilities by performing Field engineering assessments, project engineering, marketing the engineering group, writing formal reports, wrote article on Utilizing Solar Power for the AZ Water magazine. I also supported the Electrical group by performing electrical designs, assisting with trends on electrical equipment, raceway, and cable on 627,200 sq. ft building. Assisted procurement with hard count for transformers, cable, communication cables, power panels, and assisted with procurement of MCC’s. Performed calculations for Voltage drop, Power Factor, Utilization factor, UPS calculations using IEEE/ANSI, Lighting Calculation using IESNA standards, cable sizing conduit sizing using NEC, attended UPS vendor meetings, assisted with Motor Control Center schedule, assisted with communication system, Estimated Electrical equipment, and practical experience with electrical trade. I have held positions of responsibility of Electrical Engineer, Field/Project Electrical Engineer, Lead Electrical Lighting designer, Electrical Estimator and Electrician Helper with engineering, construction and maintenance companies.

EDUCATION & PROFESSIONAL

1. B.S. in Electrical Engineering, University of New Mexico - December 1999

2. Engineering in Training (Maryland) # 25794

3. Certificate course in Grounding software

4. AutoCAD training and 3-D PDS modeling training

5. Radiation Worker Level 2 (Palo Verde Nuclear Generation & Savannah River Site)

6. Nuclear Generation Station – Critical group ACAD Badge

6. Wind Generation Training

PROFESSIONAL EXPERIENCE

10/2011-12/2011 TechniPower – Contract. Palo Verde Nuclear Generation Station, (Stevenson & Associates) Goodyear, AZ

Senior Electrical Engineer on Security System for Nuclear Generation Station.

Responsible for:

• Rad Worker Trained, Critical Group ACAD Badge.

• Upgrade to Door Security, Badge Reader, Locks, Concentrators, Wiring Architecture, Field Routing

• Field Wiring (CAT 5E) Cable, Fiber Optics

05/2010-09/2011 EGS, Inc – Contract. SRR, Savannah River Site (Bechtel National/Washington Group) – Aiken SC

Electrical Engineer on Nuclear Waste Tank remediation projects.

Responsible for:

• Worked performing Demolition and removal of electrical equipment.

• Responsible for verifying compliance of design.

• Trained as Radiation Worker 2, for Nuclear waste field walkdowns. PDMS Conduit and Cable scheduling program.

• Performed field investigations on motors, heat tracing in Radiation areas, construction meetings.

• Responsible for preparing CADD drawings done in Microstation, used Industrial standards and code.

12/2007-06/2009 Greeley and Hansen, Phoenix AZ

Electrical Field/Project Engineer on various water treatment plants and small projects varying in cost up to $5 million.

Responsible for:

• Worked various parts of waste water treatment plants, and parking garage.

• Responsible for field and cost analysis on 24 kV transmission line routing overhead or underground. Performed construction site investigation on 4160 V/480V distributions to Transformers, Switchgears, Motor Control Centers, raceway, conductors.

• Performed field investigations on motors in classified areas, change orders, RFIs, construction meetings.

• Responsible for determining MCC size, cable/conduit sizing, voltages drop calculations for motors.

• Responsible for preparing electrical specification, preparing CADD drawings done in AutoCAD, used Industrial standards and code.

• I have performed formal energy analysis utilizing SKM software.

• Assisted with preparing formal report and presentation for the City of Phoenix’s Electrical Master plan at their 75 MGD Waste Water Treatment Facility.

08/2005-12/2007 Montgomery Watson Harza, Denver CO

Electrical Engineer on various water treatment plants and small projects varying in cost up to $6 million.

Responsible for:

• Worked various parts of water treatment plants, and sump system for various states.

• Responsible for determining MCC size, cable/conduit sizing, voltages drop calculations for 480V motors and 4160 VAC 2000 HP motors.

• Responsible for preparing electrical specification, preparing CADD drawings done in Microstation, used Industrial standards and code.

• Designed a 3200 Watt solar design for a remote water canal gate station.

10/2001-06/2005 Bechtel National Inc, Richland, WA

Electrical Engineer on the River Protection Project-Waste Treatment Plant (RPP-WTP) a $ 6 billion nuclear waste treatments project. This project is also

one of the most complex in our nation.

Responsible for:

• Worked on the World’s largest Nuclear Waste Vitrification plant for the DOE - $6 Billion project, this project is a facility to produce glass with the Hanford tank waste.

• Responsible for calculating UPS total VAR, W, VA & Battery for 600 kVA of load.

• Responsible for coordination with the Controls and Instrumentation group and report schedule variance & Meeting coordinator for Main Control lighting design took initiative for being responsible for design to meet DOE, NRC and Industrial standards after Responsible Engineer transferred.

• Responsible for developing and coordinating with four facilities to standardize design on panel schedule.

• Coordinated with the Control and Instrumentation Engr, Plant Design, Civil/Structural and procurement on electrical/C&I equipment, Power Factor, VA, Watt and utilization factor.

• Performed preliminary model study for voltage losses and levels and verified upon equipment selection. Used trade experience to recommend cost savings in design and electrical equipment.

• Developed working relationship with other disciplines/vendors by representing Electrical in the operations and accepted assignments on various inter-facility Operating and Engineering committees.

• Familiar with industrial Std. such as; IEEE, IESNA, ANSI, NFPA 101, NEC and NESC standards.

• Assisted in coordinating with C&I and the Mechanical group to obtain MCC loads, and determined Start size & breaker size. Asst with Single Line Dwg, sizing cable using voltage drop calc.

• Assisted with electrical Trend analysis on a 620,000 sq-ft bldg, by performing a load study and determine equipment size/quantity for transformers, lighting, Telecom, raceway and conductors.

• Participated in Vendor Pre-Award meetings for facility UPS, to review Spec. and vendor data sheets.

• Assisting with workload scheduling by having the ability to tolerate the mental rigor of a constantly changing systems to meet construction milestones. This facility designs is a one of a kind plant in the world with Strict Regulation from the Dept. of Energy, NRC (Nuclear Regulatory Commission) Stds, and Industrial standards.

02/2000-10/2001 Bechtel Power, Frederick MD

Lead Electrical Lighting Engineer/Designer on the Ghazlan II, Gas fire Power Project, 3200 MWatt plant (4-755 MW units) a $1.6 billion, world’s largest gas generation plant.

Responsible for:

• Lead Lighting Designer for the Ghazlan II Project in Saudi Arabia (4-755 MWatt boiler Natural Gas Power Plant/$1.1 Billion Project) at time region’s largest project.

• Responsible for revising procurement’s Material Requisition for Power and Lighting equipment.

• Assisted Electrical Supervisor with scheduling of workload for the Lighting design. Cost savings of $10 mil. by executing quality work for two people, I took full responsibility of all lighting design

• Training on Power plant project overview - course covered location of support structures in Coal and Natural gas power plants as well as efficiency of Fossil plants.

• Excellent customer service, I took responsibility by writing correspondences to (SECo) Saudi Electric Company to resolve issues regarding lighting. Verified lighting in hazardous areas by using the National Electric Code and Lighting Calculation tech per IESNA (Illuminating Engineering Society of North America). Verified contractual agreements as well as Code compliance were met.

• Used the IESNA standard to complete lighting calculation for four turbine buildings, including Roadway/security lighting, building exterior areas and 16 industrial/commercial buildings. I have used 3-D, 2-D CADD Microstation for lighting, designed electrical schematics & single lines.

• Interacted and coordinated design with Electrical supervisor, plant design, civil engineers and Mechanical engineers.

• Used Bechtel’s raceway program to track cable and raceway quantity as well as routing of cable.

• Certified to use Grounding software by SES, Power plant project overview (covering various fossil fuel plant layouts)

05/1999 – 02/2000 Gardner Zemke - Electrical/Mechanical Construction, Albuquerque NM

Electrical Estimator on projects such as the National Security Sciences Building Los Alamos Nat. Lab, NM, Healthcare Ctrs, detention Ctrs, and various commercial projects

Responsible for:

• Jr. Project Management Training, course covered overview of National Electrical Code (NFPA 70), estimating electrical equipment, wiring, working with HVAC, Structural, Mechanical, and management.

• OJT training on Electrical Estimating tool ACCUBID.

• Performed detailed take-offs per customer specification on Industrial and Commercial projects and performed detail estimates for: lighting, feeders, special systems, Communications, Conduit (e.g. EMT, IMC, GRC, PVC), conductors, Panels, motor controls, MOVs, fire alarm, fiber optics, and grounding.

• Coordinate with Electrical equipment vendors to support deadlines for commercial and industrial project estimates/bids. Design 480 VAC power distribution system and performed load flow calculation

02/1997 – 04/1999 University of New Mexico - Physical Plant Area 1, Albuquerque NM

Main responsibility to assist EL-1 Master Electrician, performed field assignments; daily trouble shooting, repair, maintenance of electrical equipment of campus distribution 120-480VAC system, OJT NFPA 70 (NEC 1996)

Responsible for:

• Design and Engineered 110V-480V distribution systems in various areas including machine shops, street lighting and Mechanical equipment rooms incorporating power factor.

• Perform energy analysis for a Major University building and developed report to upgrade equipment and installation cost -vs.- operation cost.

• Implemented and planned yearly preventive maintenance schedule.

• Experience with working on building Motor Control Centers (MCC) Safety training, Implemented and planned yearly preventive maintenance schedule.

• Safety training on working on equipment from 115VAC, 4160 VAC to 12.47 kV distribution systems.

• Training on 13.2 kV GE Switchgear, Familiar with Medium voltage transformer, switches, and grounding.

• Familiar with 4160 VAC/480 VAC transformers, fuse/ckt Bkrs disconnects, grounding, machine shops, street lighting and mechanical equipment rooms incorporating power factor.

• Assisted contracted engineering firm with surveying of existing distribution systems and location of new systems in the campus conversion from 4160V transformer to 12.47kVA.

• Other Duties to assist other trades; Carpenters, Boiler Technicians, Pipe Fitter, in various projects.

Other Qualifications

Author on Solar energy in Water and Waste Water Facilities - AZ Water Magazine June 2009

PDMS training - DOE Savannah River Site (Aiken, SC)

Radiation Worker 2 Certified – DOE Savannah River Site (Aiken, SC)

Radiation Worker Certified – Palo Verde Nuclear Generation Station (Tonapah, AZ)

Wind Power Generation – National Renewable Energy Laboratory- (36 hrs)

2008 NFPA 70 Electrical Code Training – Montgomery Watson Harza – (8 hrs)

2002 National Electrical Code Training – Bechtel Houston – (18hrs)

MS Word, MS Excel, MS Power point & MS Access database

Power plant project Overview - Bechtel Power Training on plant layout and efficient Fossil Plants

ACCUBID Electrical Estimating software

Trend Analysis for Electrical Equipment in 40000 sq ft Safety Class Building

Grounding Class – SAFE ENGINEERING SERVICES & TECH. LTD (SES) – (40hrs)

Medium Voltage Training –WESTING HOUSE – (8hrs)

13.2 kV Switchgear Training – GENERAL ELECTRIC (GE) - (4hrs)

Asst Sr. Engineer with Communication System VOIP, Wireless, and Bldg Evac System

AGI32 by Lighting Analysts, Inc. Jr Project Management Training - 8 wks

Electrical Lock out Tag out Class 1 & 2 Hazardous Location training