Sadiqabad, Punjab, Pakistan
Field Operator Urea Plant Operator with in-depth knowledge of Conveyor Belts Operation, Steam Turbine, CO2 Compressor (Centrifugal & Positive Displacement) and Equipment Inspection. Looking for an opportunity where I can exercise industrial ...
- Feb 18
Pakistan
... BASIC TURBINE .VALVE AND CONTROL VALVE .PUMP .HEAT EXCHANGER . BASIC BOILER .P&ID READING AND USES .EMERGENCY RESPONSE PLAN ACTIVITIES .PLAYING CRICKET .WATCH DOCUMENTRY .LISNING MUSIC July 2023 - Conteniue 2019 2022 EXPERIENCE FOUJI FERTILIZER BIN ...
- Feb 17
Karachi, Sindh, Pakistan
... Led commissioning efforts overseeing setup and testing of Boiler, Water treatment system, Steam Turbine & Fire Protection System. Collaborated with engineering, maintenance, and operations teams to resolve technical issues. Received Star Award of ...
- Feb 17
Karachi, Sindh, Pakistan
... WWTP as per WHO guideline, Hypo chlorination Plant, Intake Water System, H2 Plant, Fire Fighting Pump House, Auxiliary Boiler, Re-boiler, RFO metering and Transfer system, Diesel Backup Generator, Station Compressors, Turbine and Boiler Auxiliaries. ...
- Feb 17
Multan, Punjab, Pakistan
... 1.5 Years working Experience at Halmore Power Plant, Bhikki Sheikhupura Pakistan 225MW Combined Cycle (2 Gas Turbines & One Steam Turbine-GE.) 02 Years Apprenticeship (2010-2012) as a Chemical Plant Operator from Technical Training Centre, Fauji ...
- Feb 17
Multan, Punjab, Pakistan
... Multistage Centrifugal Compressor driven by Condensing/Extraction Steam Turbine provided for Recycle Hydrogen Gas flow. Multi Stage Reciprocating Compressor installed for Net Gas Hydrogen for Diesel Max. Reactor Section NET Gas Section LPG Recovery ...
- Feb 17
Multan, Punjab, Pakistan
... SOLUTION PUMP: Three main pumps for semi lean solution having flow capacity 749.43m3/hr at 38 kg/cm2 Three pumps for lean solution having flow capacity 221 m3/hr at 42 kg/cm2 Two Hydraulic turbine used for drive lean solution pumps and supply low ...
- Feb 17
Karachi, Sindh, Pakistan
... Power Company Limited (1x660MW) HEI Port Qasim Karachi Ultra-super critical Boiler(1936 t/h 28.8Mpa) and its Auxiliaries, Turbine and its Auxiliaries,cooling towers Responsibilities: Perform daily routine Inspection of Turbine and Boiler Auxiliary ...
- Feb 17
Multan, Punjab, Pakistan
... This compressor is driven by Condensing/Extraction Steam Turbine of Shin Nippon Machinery. 2.The Reciprocating type Net Hydrogen Gas Compressor manufactured by Thomasson International, having a capacity of 30000 Nm3/h. 3.The Reciprocating type ...
- Feb 17
Rawalpindi, Punjab, Pakistan
... at FAUJI FERTILIZER COMPANY LTD (Goth Machi Sadiq Abad PAKISTAN) DCS (YOKOGAWA CENTUM VP) - Training at DCS is in progress GAS COMPRESSION STEAM TURBINE (NUOVO PIGNONE) - It is very high pressure (105kg/cm2) steam driven turbine (POWER 09MW). ...
- Feb 17