Post Job Free

Resume

Sign in

Field Operator

Location:
Multan, Punjab, Pakistan
Posted:
February 17, 2024

Contact this candidate

Resume:

F I E L D O P E R A T O R R E V A M P & T . A – R E F I N E R Y, O I L & G A S

A C H I E V E M E N T S :

S U M M A R Y :

W O R K E X P E R I E N C E 0 6 Y E A R S :

HASSNAIN ABBAS

Experienced Field Operator with 5.6 years at PAK ARAB REFINERY LTD (PARCO), specializing in Naphtha Hydrotreater, Platformer, Continuous Catalyst Regeneration and 6 months at Engro Polymer. Recently completing a BSC in Chemical Engineering during this tenure, I bring proficiency in Revamp and Turnaround Activities, demonstrating expertise in handling Compressors, Turbines, Pumps, and various Industrial Equipment, including Commissioning. Eager to contribute my comprehensive skill set to a challenging role, fostering operational efficiency and excellence in a progressive industry setting.

+92-305-******* ad3pp9@r.postjobfree.com Multan, Pakistan Revamp & Turnaround

Master Start-up

Normal Start-up

Normal Shut-down

Normal Operations

Unit Optimization

Emergency Handling

Operational Adjustment

Emergency Response Plan

Emergency Response Team

Confined Space Entry

Permit to Work System

Job Safety Analysis

H2S Safety & Hazard Awareness

Use Of SCBA

Team Work /Time Management

Contributed to the operations of Pak Arab Oil Refinery, a key player in fulfilling 40% of Pakistan's energy requirements with a capacity of 120,000 barrels per stream day (BPSD). Specialized in Naphtha Hydro-treating (NHT), Platforming, and Continuous Catalyst Regeneration (CCR) as a Field Operator.

Demonstrated an excellent command of process equipment, ensuring efficient and effective handling. Played a pivotal role in Turnaround (TA), Revamp, Commissioning, and Master Startup activities for Naphtha Hydro-treating (NHT), Platforming, and Continuous Catalyst Regeneration (CCR). PAK ARAB REFINERY LTD (PARCO):

Field Operator • 29-July-2018 - Present

Worked as Process Field Operator in PARCO at following areas: Naphtha Hydro-treating Unit (NHT) 35000 BPSD:

Platforming Process Unit / LPG Recovery Section 21000 BPSD: Platforming Process Unit is composed of the following process sections: The platforming unit consist of 3 No. of floating bed, radial flow Reactors. Box type, horizontal, wall mounted burners Heaters are provided for desire temperature. Multistage Centrifugal Compressor driven by Condensing/Extraction Steam Turbine provided for Recycle Hydrogen Gas flow. Multi Stage Reciprocating Compressor installed for Net Gas Hydrogen for Diesel Max. Reactor Section NET Gas Section LPG Recovery Section Naphtha Hydro-treating Unit is composed of the following process sections: Two Reactors with COMO and NIMO catalyst for all desired reactions. Natural Draft Cylindrical Charge Heater to raise the temperature of feed as per requirement. The Reciprocating Type Recycle Hydrogen Gas Compressor to maintain H/HC ratio. 3 Phase Separator to separate Sour Water, Hydrocarbons and Hydrogen Gas. Reactor Section Stripping Section Splitter Section Continuous Catalyst Regeneration Unit (CCR) 454 Kg/hr: With a Catalyst Regeneration Section, the refiner is able to operate the Platforming reaction section without having to shut down for catalyst regeneration.

Re-generator, Lock Hopper, Drying, Reduction, Chlorination, Acid Gas Treatment Vent Gas Wash Tower (Scrubber), Elutriation gas System, Nitrogen Sealing System are the main Equipment’s/Sections of the CCR. BS.c Chemical Engineering with 3.03 CGPA.

NFC IET, Multan• 2019–2023

1. Computer Soft Skills

2. Computer Hardware/Software.

3. SAP Logon

4. Internet Browsing

E D U C A T I O N :

P E R S O N A L I N F O :

S K I L L :

Engro Polymer is the largest Polymer and chemical Complex in Pakistan. Responsible for operations related to the production of Ethyl Di-Chloride, Vinyl Chloride Monomers, Poly Vinyl Chloride, Sodium Hypo-Chlorite, Caustic Soda, Chlorine, Hydrogen, and Hydro Chloric Acid. I was working as a Trade Apprentice on EDC/VCM.

Engro Ploymer & Chemicals:

Diploma In Chemical Engineering A+ Grade.

Trade Apprentice •24-Jan-2018 To 21-July-2018

Govt Collage of Technology, Multan• 2014–2017

Revamp, Turnaround, Commissioning & Master Startup: Participated in NHT/Platforming Units revamp project. Target is to increase the both units plant duty/capacity up to 20%. In this project there are about 550 cutting/welding jobs to tie-in the new lines.A number of pumps impellers going to be replaced with a bigger Dia impeller. New de-super heaters, reboilers, Fin fan coolers, exchangers are installed in this revamp.

Experience of Commissioning and Startup of after Revamp Unit Including the: Review of PFD & P&ID

Cleaning & Service of Utility System

Air/Nitrogen Blowing

Hydro static Testing

SOLO Run of Pumps Motors

Activation of Utilities Headers

Instrumentation Loop Checking

Vessel Loading's

Air Freeing

Master Startup with Catalyst

Checking of Unit Piping & Gaskets

Visual Inspection of Vessel Internals

Line Flushing

Instrument Functional Test

Blinds Listing

Leak Testing

Addition of Hydrogen

Initial H2 / HC Circulation & Dry down

Shutdown for Catalyst Loading

Establishment of Normal Operation

Hands on Experience:

I am fully trained in Startup, Shutdown, Maintenance Handover/Takeover and Troubleshooting of following Machines and Equipment’s:

Reciprocating Compressor Manufactured By Howden

Thomsan, Netherlands.

Condensing/Extraction Steam Turbine of Shin Nippon Machinery.

Multi Stage Centrifugal compressor of Hitachi.

Fired Heaters/ Electric Heaters/ Furnaces.

Reactors/Vessels/Tanks

Centrifugal Single/Multistage Pumps Manufactured by Sulzer & Sundyne.

Positive Displacement Pumps.

Heat Exchangers.

Waste heat Re-boilers.

Air cooled/water cooled Condensers.

Tray/Packed Bed Column

Strippers with Steam Re-boilers

Three Phase Separators

Valves

Field Instrumentation and Control System.

Father’s Name : Zafar Abbas

Date of birth : 26-05-1999

Passport # : UD1014661

Nationality : Pakistani

Marital Status : Married

Religion : Islam



Contact this candidate