... • Drove initiatives to handle erection & commissioning of switch gears that included generator transformer, CT, PT, ESP Panel, Turbine control panel, AVR Panel, MCC Panel, Coal handling plant, installation & testing of Relays, transformer & other ... - 2014 Dec 07

Manager Engineer

Lucknow, UP, India
... Achievements :- Constructed 50 Tph /67 kg/cm2 boiler,8 MW turbine with 21 mtr heigh turbine house of RCC & Brick work, 8 story coal crusher building, ETP, Coal and Ass conveying Systems, cooling towers with all pumps and Fans etc in Six month time ... - 2013 Aug 03

Manager Management

Lucknow, UP, India
... Separated Gas was further compressed and fed to Turbine as fuel, also used for gas injection, gas lift etc. There were three numbers of Gas Compressors designed to handle upto 10 MMscfd gas with max pressure of 1800 psig. Gas Compressors were ... - 2013 Aug 01

B.Tech Mechanical With 1 Year Of Exp. In Power Plant as a Shift engine

Lucknow, UP, India
... Working pressure 44kg/cm2 & steam temperature 440 0c Low pressure Boiler :21TPH*1=21TPH Make: Par techno heat, Type- A.F.B.C About Turbine: Make: Triveni engg. Total Capacity: 3MW*3=9MW About DM Plant: Make: Ion Exchange LTD. Capacity : 15Cube MTR ... - 2013 Apr 14