|
Resume alert |
Resumes 1 - 10 of 56 |
Lucknow, Uttar Pradesh, India
... B.H.E.L: (JUN 2019-JUL 2019) Description: General awareness in steam turbine manufacturing and its processes. It provided practical ideas in manufacturing several components of a turbine. Learnings: Gained knowledge on the various machining and ...
- Apr 13
Lucknow, Uttar Pradesh, India
... •Topic/Project : Working on Turbine Engine, Lathe Machine & Other Cutting Tools. MINOR PROJECT: •Name of Project Report : Centrifugal Pump. •Topic Content : Forces on Centrifugal Pump Impellers. STRENGTH: •Honesty and Integrity. •Leadership ...
- Apr 01
Lucknow, Uttar Pradesh, India
... Coordinating materials shifting from fabrication yard to turbine generator area Responsible to thoroughly understand and communicate client’s requirement to appropriate team members and manage all requirements accordingly to realize each for the ...
- Feb 14
Lucknow, Uttar Pradesh, India
... And also power plant & 22 mw gas turbine GE MAKE-MARK-V/ 12.5mw Steam turbine BHEL MAKE combine cycle power plant operation and maintenance of HT & LT distribution system, transformers, Breakers/MCC Panel / control panels and 220 KV/132KV /66KV /33 ...
- Feb 10
Lucknow, Uttar Pradesh, India
... The energy of this losses is stored in the form of compressed air at high pressure and at requirement it is used to run the turbine which directly runs a generator to produce electricity Workshops/Seminars: Attended workshop on “Vehicle Overhauling ...
- Feb 08
Lucknow, Uttar Pradesh, India
... ACADEMIC PROJECTS Project Name / Title: Highway Wind Turbine The objective of the project is to design a wind turbine to recapture wind energy from vehicles on the highway. Wind energy is considered the fastest growing clean energy source however; ...
- Jan 24
Lucknow, Uttar Pradesh, India
... Erection, Commissioning and Maintenance of 1X80MW full condensing turbine. 3. Maintenance of 2X120 TPH, 66 kg/cm,480 C, AFBC Boiler. 4. Maintenance of 2X45 MW full condensing turbine. 5. Maintenance of 2X10.2 TPH, 66 kg/cm,480 C, WHR Boilers. 6. ...
- Jan 19
Lucknow, Uttar Pradesh, India
... Managed a team of Fitters,Welders,Boiler and Turbine at plant. Managed Ash handling and Fuel process of Plant. Projects: M/s Sukhbir Agro Energy Limited Shutdown Biomass plant (14.5 MW) Ghazipur (UP). In year 2018. Mist cooling Tower Project ...
- Jan 02
Lucknow, Uttar Pradesh, India
... As a Safety Officer in Wind Turbine Tower Manufacturing Process Plant from Anjar Dist- Kutch, Gujarat from April 2018 to November-2019. 6) Ammonia & Urea Fertilizer (HURL) Project Gorakhpur (UP) working as a HSE Officer in isulations job from Lloyd ...
- 2020 Dec 30
Lucknow, Uttar Pradesh, India
... BAJAJ ENERGY PVT LMT TURBINE : 2*45 BOILER 2*190 TPH 120 Kg /CM2 5350 C Coal Fired WTP : Reverse Osmosis 12 m3 DM 12 M3 and bhaskar steel plant 12m3 RO plant nov 2017 WTP : ReverseOsmosis 80m3/hrDM 80M3/hr adani DM plant, Adani Power 600*2 Non ...
- 2020 Dec 18