Post Job Free

Resume

Sign in

Power Plant Maintenance

Location:
Lucknow, UP, India
Salary:
16.0lacs
Posted:
December 07, 2014

Contact this candidate

Resume:

AMULYA KUMAR SABAT

acgyjx@r.postjobfree.com House No – 5011, Rose Berry, Sahara Garden City,

+91-943**-*****

acgyjx@r.postjobfree.com Adityapur – 2, Jamshedpur (Jharkhand)

+91-885**-*****

Date:

Sub: Position applied for suitable post for power plant electrical project as well as operation & maintenance.

Dear sir/madam

I am writing to express my interest in joining your team for the above suitable post.

I am writing to outline my rich experience and successful track record as a Project Management & Electrical Maintenance

Professional with over 20 years’ experience in project management, maintenance, operations management, business development,

quality control & testing etc. which I believe shall make a very significant contribution to enhance the revenue of your esteemed

organization while improving operational efficiency.

In my current role, I have handled execution & commissioning of 3X60MW power plant, including erection & commissioning of power

transformer, Distribution transformers, 6.6KV MV Panels, Bus duct, GCB, power & control cabling, LT & HT motors, plant

illumination, earthing system with 2X220KV switchyard and installation & commissioning of 132 KV& 400KV switchyard. I have also

been involved in the installation and commissioning of all kinds of substation electrical equipment as well as e-bop area such as

transformers, breakers, CTs, CVTs, Isolators, HT motors, Power transformer (2.5mva-330mva), HT & LT panels, drives etc.

While working in different organizations in the past, I have been nominated as an “Incident Controller” to respond to the crisis within the

shortest possible time, and guide the staff to handle the crisis in a safe and effective manner . I have also handled erection &

commissioning of two nos 400KV switchyard; one for PGCIL extension & one for Plant right from equipment erection to testing,

commissioning of all equipments including SCADA system.

I am now looking for a challenging senior management position in Project Management, Maintenance and Operations in Power industry

of repute. I am a Quick Learner with a ‘Can Do’ attitude and a thirst to learn and adapt to a new environment; seeking out new challenges

to contribute to business growth and development through involvement, influence & teamwork and working with you would certainly

provide me with the ideal opportunity of further skill enhancement and career growth.

Please do not hesitate to call me on +91-943**-***** in order to present my credentials more fully; I would appreciate the opportunity

for an interview at your earliest convenience to discuss the ways in which I can contribute towards the growth of the organization. I thank

you for your time and consideration and look forward to hearing from you.

Yours Sincerely,

Amulya Kumar Sabat

Enc: Resume

AMULYA KUMAR SABAT

acgyjx@r.postjobfree.com House No – 5011, Rose Berry, Sahara Garden City,

+91-943**-*****

acgyjx@r.postjobfree.com Adityapur – 2, Jamshedpur (Jharkhand)

+91-885**-*****

PROJECT MANAGEMENT OPERATIONS MAINTENANCE (POWER

PLANT)

A dedicated professional with 20+ years’ rich experience in operation, maintenance, project management, testing, application

engineering and erection & commissioning. Demonstrated professional excellence in project planning, scheduling, monitoring, site

supervision, and execution of projects without incidences of time/cost overruns. Robust record of success in systematizing maintenance

functions with implementation of predictive, planned, & preventive maintenance practices to maximize functional availability of

equipments. Proven dexterity in planning, vendor development, procurement, and management of inventory of critical spares to manage

maintenance calls expeditiously. Thrive in a deadline intensive environment, multi-task, perform under pressure and meet deadlines.

Excellent man-management, time management, and leadership skills. Computer proficient

Power Plant Management Operations Management

Shutdown/Start up Operations Quality Control & Testing

Erection & Fault Analysis Planning & Scheduling

Plant Management Budgeting/ Statutory Compliance

TPM/HSE/SOP/SMP Vendor Development

Crisis Management Cross Functional Coordination

Training & Development Energy Conservation

CAREER PROGRESSION

Dy.Chief Engineer, M/s. Jai Prakash Associates Limited, Robertsganj Uttar Pradesh since 2012 (Present).

• Accomplish responsibility for all the executions & commissioning of 3X60MW power plant(Siemens Generator,3x250TPH

CFBC Boiler), including erection & commissioning of power transformer, Distribution transformers, 6.6KV MV Panels, Bus duct,

GCB, power & control cabling, LT & HT motors, plant illumination, earthing system with 2X220KV switchyard, 60MW Siemens

Generators, Coal Handling plants, Wagon Trippler.

• Accountable for installation and commissioning of all kinds of substation electrical equipment as well as e-bop area such as

transformers, breakers, CTs, CVTs, Isolators, HT motors, Power transformer (2.5mva-330mva), HT & LT panels, drives etc.

• Contribute significantly in testing, commissioning and application engineering of electrical control & protection

• Devise effective strategies for assembling, wiring, commissioning, maintenance and troubleshooting of switch gear panels,

capacitor panels, motor control center, relay panels, power transformers, etc.

• Overseen all phases of project execution; approved engineering/design changes, troubleshoot and resolved complex technical

problems, consistently met project deadlines with highest possible quality standards

• Map instrumentation needs of the organization and defined technical parameters to facilitate procurement of right quality

instruments

• Meticulously manage resources while creating estimates for the project, Work Breakdown Structure, Project Plan, Contingency

Plan & Schedules, identifying risks within defined scope, quality, time and cost constraints

• Instrumental in framing on-site and off-site Emergency Management Plans and conduct safety drills periodically to familiarize

the personnel with Emergency Management Plans

• Manage projects from conception through development planning, budgeting and scheduling; supervise a team, present program

highlights at executive conferences

• Presently looking after total operation & Maintenances of electrical system as Section Head.

Key Achievements

• Titled as an “Incident Controller” to respond to the crises within the shortest possible time and guide the staff to handle the

crises in a safe and effective manner

• Credited for making significant contributions in the expansion and modernization/modification programs of the company

winning wide appreciations for work performance

• Introduced several modifications to reduce incidences of breakdowns

Site Manager (E-bop), ABB Limited, 2011 to 2012

• Established plans to monitor 2x270MW Power Plant E-bop job at M/s Adhunik Power & Natural Resources Ltd., Jamshedpur

• Shouldered the responsibility for handling all the executions & commissioning of E-BOP jobs that included erection &

commissioning of power transformer, Distribution transformers, 6.6KV MV Panels, Bus duct, GCB, power & control cabling, LT &

HT motors, plant illumination, earthing system

• Fully accountable to liaise with CEA for clearance of charging of system & clients for smooth working on the site

• Deftly handled erection & commissioning of two nos 400KV switchyard; one for PGCIL extension & one to Plant right from

equipment erection to testing, commissioning of all equipments including SCADA system

• Built & nurtured relations with various internal departments, Government bodies and authorities for ensuring smooth and

hassle-free production operations

• Identified areas of obstruction/breakdowns & took steps to rectify the same through application of troubleshooting tools

• Drawn up project plans, schedule of activities, budget, & cost estimates, planned, procured, mobilized, and deployed resources

to deliver the project within defined time and costliness

Key Achievements

• Propagated Quality Circle movement and developed quality culture in the work force to achieve quality leadership in the

industry

• Introduced the concept of MIS reporting to update the Management on a regular basis

• Structured annual operational budget and implemented control measures to contain expenses within defined limits

Dy. Manager – Power Plant Electrical, Facor Power Limited, Bhadrak, Orissa, 2010 to 2011

• Independently successfully completed 2x50MW Power Plant with 2nos 250Tph CFBC boiler

• Drawn up plans to manage overall responsibilities of project work of 2 X 50 MW coal based power plant equipped with 250T

CFBC Boiler.

• Drove initiatives to handle erection & commissioning of switch gears that included generator transformer, CT, PT, ESP Panel,

Turbine control panel, AVR Panel, MCC Panel, Coal handling plant, installation & testing of Relays, transformer & other switchgear

• Provided on-site Management and quality control to ensure projects met time and budget requirements, and were built in

accordance with contract documents

Key Achievements

• Led & guided the team in ensuring compliance to all Safety norms to minimize/achieve ZERO accidents through the

appropriate fire protection system & safety equipments

• Established plan for ensuring compliance to all HSE activities and practices

AGM – Power Plant Electrical, Adhunik Alloys & Power Limited, Kandra Jamshedpur, Jharkhand, 2011

• Looking after total operation & Maintenance of power plant electrical system of 30 MW Power plant with AFBC Boiler.

• Guided, controlled and motivated a team to handle the preventive, breakdown, planning maintenance and preparation of MTTR

and MTBF

• Independently handled electrical maintenance, overhauling of LT, HT motors, Transformers, Panels, VVFD drives, EOT crane,

Lift, Generator, soft starter panels, compressors, HT & LT DG set with 132/11KV substation.

• Successfully bagged the opportunity to supervise 132KV substation maintenance & synchronization system

• Provided on-site Management and quality control to ensure projects met time and budget requirements, and were built in

accordance with contract documents

Key Achievements

• Led & guided the team in ensuring compliance to all Safety norms to minimize/achieve ZERO accidents through the

appropriate fire protection system & safety equipments

• Established plan for ensuring compliance to all HSE activities and practices.

Sr. Manager – Power Plant Electrical, Adhunik Metaliks Limited, Rourkela, Orissa, 2006 to 2010

• Coordinated successfully to complete 2x17MW Power Plant with 5nos 10Tph WHRB Boiler with 1 No 130 Ton CFBC boiler

• Drawn up plans to manage overall responsibilities of project work of 2 X 17 MW coal based power plant equipped with 130T

CFBC Boiler as well as monitored the electrical Operation &maintenance of power plant

• Drove initiatives to handle erection & commissioning of switch gears that included generator transformer, CT, PT, ESP Panel,

Turbine control panel, AVR Panel, MCC Panel, Coal handling plant, installation & testing of Relays, transformer & other switchgear

• Guided, controlled and motivated a team to handle the preventive, breakdown, planning maintenance and preparation of MTTR

and MTBF

• Independently handled electrical maintenance, overhauling of LT, HT motors, Transformers, Panels, VVFD drives, EOT crane,

Lift, Generator, soft starter panels, compressors, HT & LT DG set.

• Successfully bagged the opportunity to supervise 132KV substation maintenance & synchronization system

• Provided on-site Management and quality control to ensure projects met time and budget requirements, and were built in

accordance with contract documents

Key Achievements

• Led & guided the team in ensuring compliance to all Safety norms to minimize/achieve ZERO accidents through the

appropriate fire protection system & safety equipments

• Established plan for ensuring compliance to all HSE activities and practices

PAST EXPERIENCE

Sr. Engineer (Power Plant – Electrical), DLF Power Limited, Ramgarh Cantt (Jharkhand), 2000 to 2006

• Significantly headed the electrical operations &maintenance of all equipments of 3x11 MW of the coal fired FBC

Boiler & BHEL Generator

• Looking after maintenance of Power & distribution transformers, HT & LT Motors, Panels, HT & LT Breakers,

all types of MOV’s, VFD drives, Generator, Exciter, EOT Cranes, DC Motors, all switchyard equipments.

• Efficiently brought about 10- 20% reduction in down time as well as increased in PLF from 70% to 90% (increase

in productivity).

• Effectively handled project of 11/33 KV switchyard.

• Accredited for preventive & breakdown maintenance of 33 KV switchyard.

Assistant Engineer (Power Plant – Electrical), Orient Paper Mills Limited, Brajrajnagar, Orissa, 1994 to 2000

• Involved in Erection & commissioning of 25 MW power plant which consists of 75 TPH –BHEL make boiler

&50TPH stroker fired boiler BHEL make.

• An Erection team member active participation, right from Project Planning to successful Erection &

Commissioning of all electrical equipments (HT & LT )of 75 TPH Recovery boiler

• Troubleshooting and Schedule maintenance of all the Electrical equipments of Complete Power Block area of 25

MW capacity which included Coal Fired Boilers, Turbine Section and Auxiliaries and stroker fire Boiler Section

after successful commissioning of the Plant.

• Instrumental in installation of VVFD in plant to reduce auxiliary consumption

• Involved in preventive & breakdown maintenance of power plant ( Electrical )

EDUCATION

• Diploma (Electrical), Rourkela Institute of Technology, Kalunga, Rourkela(orissa) 1992

• Advance diploma in Computer Application

TRAINING/COURSES

• Programming of Numerical Relays at New Delhi Energy conservation seminar

• Training of Plant Maintenance

• Training of management skills at Kolkata

• Training of HT Breaker at Kolkata Siemens

• Training of VVFD system at Bangalore, ABB Training centre

I.T. SKILLS

• M.S office- Word, Excel, Power Point & some programming languages and training in SAP

: 2nd Mar 1972

Date of Birth

Permanent Address: C/o Kruti Bas Sabat, Nehru Nagar 7th lane, Gosanuagaon, At/PO – Berhampur, District Ganjam, Orissa

Notice period: 90days.

Present salary: 11.0lacs/annum



Contact this candidate