... Managed a team of Fitters,Welders,Boiler and Turbine at plant. Managed Ash handling and Fuel process of Plant. Projects: M/s Sukhbir Agro Energy Limited Shutdown Biomass plant (14.5 MW) Ghazipur (UP). In year 2018. Mist cooling Tower Project ...
- 2021 Jan 02
Lucknow, Uttar Pradesh, India
... As a Safety Officer in Wind Turbine Tower Manufacturing Process Plant from Anjar Dist- Kutch, Gujarat from April 2018 to November-2019. 6) Ammonia & Urea Fertilizer (HURL) Project Gorakhpur (UP) working as a HSE Officer in isulations job from Lloyd ...
- 2020 Dec 30
Lucknow, Uttar Pradesh, India
... BAJAJ ENERGY PVT LMT TURBINE : 2*45 BOILER 2*190 TPH 120 Kg /CM2 5350 C Coal Fired WTP : Reverse Osmosis 12 m3 DM 12 M3 and bhaskar steel plant 12m3 RO plant nov 2017 WTP : ReverseOsmosis 80m3/hrDM 80M3/hr adani DM plant, Adani Power 600*2 Non ...
- 2020 Dec 18
Lal Bagh, Uttar Pradesh, India
... JODHPUR with 65% in year 2007 IT SKILL ERP (NEWTON ERP VERSION 12.0 by Nippon Data System Ltd) AUTOCAD MS Office PROJECTS UNDERTAKEN & SEMINAR Performance Evaluation Of Turbine Blade Under Thermal And Mechanical Load By Using Finite Element Method. ...
- 2020 Dec 09
Lal Bagh, Uttar Pradesh, India
... T.P.C Ltd 01/07/2015– 30/07/2015 Turbine,Boiler,C H P and Ash handling PROJECTS Electricity generated by using hand pump. SKILLS Ability to communicate effectively with the team members Ability to rapidly build relationship and set up trust. Quality ...
- 2020 Dec 02
Lal Bagh, Uttar Pradesh, India
... 6)Checking of Oil (NAS Value, Moisture, Hsd, Ldo, Hfo, Coal mill, turbine oil etc). 7)Coal Sampling &Testing for (GCV, VM, IM, ASH.FC, TM). 8)Sap data Entry and Log Book Registers Maintain. Total CTC = 432129/- Declaration- I hereby solemnly declare ...
- 2020 Nov 13
Lucknow, Uttar Pradesh, India
... power consumption by identifying operational losses leveraging Lean Six Sigma principles oDelivered excellence in enhancing Turbine Heat Rate (THR) & Station Heat Rate (SHR) as part of Turbine & Boiler Efficiency enhancements by streamlining ...
- 2020 Nov 08
Lal Bagh, Uttar Pradesh, India
... SUMMER INTERNSHIP AND PROJECT 1-month training from Hindalco Industry Limited Sonebhadra (Turbine and Auxiliary) 1-month training from Hindalco Industry Limited Sonebhadra (Fabrication and Rolling mill) WORK EXP 3.5 YEAR EXP (VACCUM HEAT TREATMENT, ...
- 2020 Sep 29
Lal Bagh, Uttar Pradesh, India
... Finding, improving and preventing actions against deviations of the projects • Supervising the unit at the time of islanding and turbine tripping • Conducting health and safety related operations in the fire fighting system to improve overall safety ...
- 2020 Sep 25
Lucknow, Uttar Pradesh, India
... ALSO INSPECTIOND & CERTIFICATION OF STORAGE PRESSURE VESSELS, COMPRESSORS, BOILERS,TURBINE,WELDING JOINT,AND PIPING,HEAT EXCHANGERS AND REACTORS, INSPECTON DURING FABRICATION,WELDING,CONNECTION JOINTS, INSTALLATION AND HYDRAULIC TESTING OF THE ...