Post Job Free

Turbine resumes in Queens, NY, 11106

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 91 - 100 of 204

Thermodynamics, Heat transfer, Energy Auditing, AutoCAD, Solidworks

Yonkers, NY
... General Electric (GE) Wind Turbine Reliability Analytics, Senior Capstone Project, team of 9. January – May 2015 Calculated accumulated stress due to wind turbulence using the concept of a power spectral density. Utilized MATLAB® to create a power ... - 2016 Nov 18

Manager Mechanical Engineering

Secaucus, NJ
... The aim of the project is to simulate unsteady turbine flow over the Ahmed Car using Ansys to predict drag coefficient and axial velocity for slant angle. Visualized the mean and instantaneous flow fields and computed the non-dimensional shielding ... - 2016 Sep 30

Real Estate Power Plant

Woodside, NY, 11377
... awarded $200K worth of contracts for wind turbine area and land surveying project EDUCATION FORDHAM UNIVERISTY, GABELLI SCHOOL OF BUSINESS New York, NY Sep 2014 – May 2016 Master’s in Business Administration: Finance Relevant courses: Real Estate ... - 2016 Aug 23

Manager Customer Service

Maplewood, NJ
... Gas Turbine Controls, Ardsley, NY (April 2014 – August 2015) Warehouse Manager Reporting to the Operations Manager, managed the warehouse distribution operations of Shipping/Receiving, Traffic of Import & Export, Return Goods and Inventory Control. ... - 2016 Aug 03

Technician

Caldwell, NJ, 07006
... • Supply & Installation of 132/11kv Substations at Khiran Pearl `A' & Khiran Pearl ` • M71B Packaged Type Substation for installation of 20" Gas oil pipeline from MAA Refinery to New Gas Turbine Station at Subiyah Power Station. • 11kV Sabriyah 'A' ... - 2016 Jul 20

Mechanical Engineer, Project Engineering, Maintenance, Planning

New York, NY
... (PETRONAS) Jun’14-Sep’14 INTERN Project: To design and fabricate a river run off turbine according to the given criterion. Cross-Flow Turbine producing 1.16kW energy at given head and discharge. Studied turbine selection charts, different types of ... - 2016 Jul 18

Power Plant Injection Molding

Forest Hills, NY, 11375
... polymer sample processing and piezo-resistance testing IAWIND - Sensing Skin for Automated Condition Assessment of Wind Turbine Blades Project Designed a novel method for adhesive peel test of the elastomer sensing membrane on wind turbine blades ... - 2016 Jun 18

Manager Sales

New York, NY
... Project Manager Senior Engineer (2008 – 2015) General Electric (GE), Schenectady, NY Worked with Design team (PGE), Services (PGS), Sourcing, Repair shop to reduce the power plant equipment failures such as Steam/ Gas Turbine, BOP, Accessories, ... - 2016 Jun 06

QC/CA

New York, NY
... to meet customer requirements Integrated and transform components (layouts, templates models, assembles, sketches, etc.) into a finished product Associate Engineer Steam Turbine Designer GE Power & Water Engineering, Schenectady, NY (contract) March ... - 2016 Jun 02

Manager Construction

Franklin Lakes, NJ
... This work has included site development planning, actual site development construction and Turbine building and Nuclear Island construction. Education Master in Civil Engineering, New Jersey Institute of Technology, Newark, New Jersey, 1989 Bachelor ... - 2016 May 13
Previous 7 8 9 10 11 12 13 Next